Originally Posted by vinblr View Post
Even look wise, having concrete structure is more suitable than Metal Structure.
What?????? I love steel structures man I just hate the monstrous concrete structures
__________________
LOVE INDIA SERVE INDIA

TIER TWO CITIES RAKSHAK
engineer.akash no está en línea   Reply With Quote

Sponsored Links
 
Old January 1st, 2013, 03:58 AM   #14162
pavan9741650414
ಹುಬ್ಬಳ್ಳಿ ಮತ್ತು ಧಾರವಾಡ
 
pavan9741650414's Avatar
 
Join Date: May 2011
Location: Hubli, bangalore
Posts: 4,785
Likes (Received): 697

pavan9741650414 está en línea ahora   Reply With Quote
Old January 1st, 2013, 04:56 AM   #14163
Cygnus-X1
Registered User
 
Cygnus-X1's Avatar
 
Join Date: Mar 2012
Posts: 745
Likes (Received): 28

Quote:
Originally Posted by Mangal_Pandey View Post
Maybe its a practical matter, Viaduct may get in the way of cranes and other
construction machinery assembling the staging material for the main span.
Current situation allows free access from all angles to the main area.

Why by the way is in-situ preferred here, why not pre-cast stuff and then bolt them together.
I think it has to do with what you already said - trains will be moving below all the time & they might have practical problems to position cranes for accurate locating & bolting of heavy members. Also, not sure if bolted pre-cast segments are permitted by rail safety over such a long unsupported span.
Cygnus-X1 no está en línea   Reply With Quote
Old January 1st, 2013, 08:56 AM   #14164
Mahesh Nanjunda
Registered User
 
Join Date: Nov 2008
Location: Bengaluru
Posts: 1,612
Likes (Received): 102

Mr.Sivasailam says they are trying to open Reach 3 to the public around July-August this year. (on twitter)
Mahesh Nanjunda no está en línea   Reply With Quote
Old January 1st, 2013, 08:57 AM   #14165
Mahesh Nanjunda
Registered User
 
Join Date: Nov 2008
Location: Bengaluru
Posts: 1,612
Likes (Received): 102

A view of the Y-junction at Peenya. Pic copyright BMRCL

__________________

n20 liked this post
Mahesh Nanjunda no está en línea   Reply With Quote
Old January 1st, 2013, 10:15 AM   #14166
darkprinz
dark prinz
 
darkprinz's Avatar
 
Join Date: Jul 2008
Location: Chennai Da !!!!
Posts: 1,784
Likes (Received): 79

Looks nice .. but are those (arms of Y) line looks narrow to me or is it really like that
__________________
Ping me at FB http://www.facebook.com/venks.varadharajan :)
darkprinz no está en línea   Reply With Quote
Old January 1st, 2013, 10:17 AM   #14167
Ashwin R
Registered User
 
Join Date: Feb 2012
Location: Bengaluru
Posts: 210
Likes (Received): 16

Pics copyright: BMRCL


Pic of Krishna beginning tunneling in N-S corridor.Kaveri has tunelled 100m. Another 200rings ie 300m to go for Kaveri


Mantri Square Sampige Rd Stn Civil Structure works has been completed.Stn is Jointly-developed with M/s Mantri Dvlprs.



Work below the Traffic Deck under progress at Minsk Sq for Cubbon Park Stn

__________________

n20 liked this post
Ashwin R no está en línea   Reply With Quote
Old January 1st, 2013, 10:18 AM   #14168
nandan_ks
BengaLurina huduga
 
nandan_ks's Avatar
 
Join Date: Sep 2005
Location: ಬೆಂಗಳೂರು,
Posts: 2,659
Likes (Received): 254

It is narrow, it has only single set of track. The farthest portion in the pic is completed, and the nearest one is still u/c .
nandan_ks está en línea ahora   Reply With Quote
Old January 1st, 2013, 10:24 AM   #14169
Mahesh Nanjunda
Registered User
 
Join Date: Nov 2008
Location: Bengaluru
Posts: 1,612
Likes (Received): 102

Quote:
Mantri Square Sampige Road Station Civil Structure works has been completed. Station is jointly developed with M/s Mantri developers.


Quote:
Kaveri has tunelled 100m. Another 200 rings i.e. 300m to go for Kaveri.
Kaveri has made a great start !
Mahesh Nanjunda no está en línea   Reply With Quote
Old January 1st, 2013, 10:25 AM   #14170
strike2
Registered User
 
strike2's Avatar
 
Join Date: Oct 2010
Posts: 1,499
Likes (Received): 225

That Y arm looks really nice

Mantri station civil works completed??

Looks like still lots to be done
strike2 no está en línea   Reply With Quote
Old January 1st, 2013, 10:31 AM   #14171
nandan_ks
BengaLurina huduga
 
nandan_ks's Avatar
 
Join Date: Sep 2005
Location: ಬೆಂಗಳೂರು,
Posts: 2,659
Likes (Received): 254

that's what I was wondering what does he mean by completed??? What about the roof?
nandan_ks está en línea ahora   Reply With Quote
Old January 1st, 2013, 10:45 AM   #14172
Ashwin R
Registered User
 
Join Date: Feb 2012
Location: Bengaluru
Posts: 210
Likes (Received): 16

In Sampige Road station, apart from platform level, there are 3 more levels. One of them will be for ticketing purposes. Other two are for parking or one for parking and other for commercial establishments?
Ashwin R no está en línea   Reply With Quote
Old January 1st, 2013, 12:20 PM   #14173
Cygnus-X1
Registered User
 
Cygnus-X1's Avatar
 
Join Date: Mar 2012
Posts: 745
Likes (Received): 28

Time to update excel sheet!
Cygnus-X1 no está en línea   Reply With Quote
Old January 1st, 2013, 12:25 PM   #14174
mkaushik1991
Registered User
 
Join Date: Mar 2012
Location: Bengaluru
Posts: 159
Likes (Received): 0

Mantri station civil works completed??
I thought it required still some 6 months to complete.
But if its really completed ,then hats off to Mantri developers. They have taken exactly 2.5 years till now.

And can we expect any difference in this particular station as its constructed by a private party??
mkaushik1991 no está en línea   Reply With Quote
Old January 1st, 2013, 12:37 PM   #14175
suraj.shekar
Registered User
 
Join Date: Apr 2012
Posts: 343
Likes (Received): 72

Quote:
Originally Posted by darkprinz View Post
Looks nice .. but are those (arms of Y) line looks narrow to me or is it really like that
On the left side of the pic is the Peenya depot (not visible here).. This viaduct is coming from the depot like a normal viaduct (with 2 parallel tracks). The branch in the Y fork going northwards is for trains coming out of the depot, while the other one (u/c) is for trains entering the depot..
suraj.shekar no está en línea   Reply With Quote
Old January 1st, 2013, 03:19 PM   #14176
mcarling
Registered User
 
Join Date: Nov 2008
Posts: 3,263
Likes (Received): 24

Quote:
Originally Posted by Mangal_Pandey View Post
Why by the way is in-situ preferred here, why not pre-cast stuff and then bolt them together.
The pre-cast pieces are not engineered for such a long span. They would have to be a lot stronger. Making stronger pre-cast pieces in small numbers for just one span would be more expensive than in-situ.
mcarling está en línea ahora   Reply With Quote
Old January 1st, 2013, 03:23 PM   #14177
mcarling
Registered User
 
Join Date: Nov 2008
Posts: 3,263
Likes (Received): 24

Quote:
Originally Posted by Mahesh Nanjunda View Post
Mr.Sivasailam says they are trying to open Reach 3 to the public around July-August this year. (on twitter)
This seems wildly unrealistic to me. There are at least two spans on which they have not even begun construction. I don't see how Reach 3 can be opened in 2013. I hope I'm wrong.
mcarling está en línea ahora   Reply With Quote
Old January 1st, 2013, 03:59 PM   #14178
darkprinz
dark prinz
 
darkprinz's Avatar
 
Join Date: Jul 2008
Location: Chennai Da !!!!
Posts: 1,784
Likes (Received): 79

Quote:
Originally Posted by nandan_ks View Post
that's what I was wondering what does he mean by completed??? What about the roof?
Quote:
Originally Posted by suraj.shekar View Post
On the left side of the pic is the Peenya depot (not visible here).. This viaduct is coming from the depot like a normal viaduct (with 2 parallel tracks). The branch in the Y fork going northwards is for trains coming out of the depot, while the other one (u/c) is for trains entering the depot..
Thanks
__________________
Ping me at FB http://www.facebook.com/venks.varadharajan :)
darkprinz no está en línea   Reply With Quote
Old January 1st, 2013, 06:59 PM   #14179
srivatsayb
Registered User
 
srivatsayb's Avatar
 
Join Date: Jan 2011
Location: Bengaluru
Posts: 603
Likes (Received): 6

Quote:
Originally Posted by Mahesh Nanjunda View Post
Mr.Sivasailam says they are trying to open Reach 3 to the public around July-August this year. (on twitter)
I don't know why he keeps making these statements...CMTI(peenya) and Peenya industry station are at a stage where yeshwantpur station was in october 2011(if memory serves me right)..

They can obviously speeden things up but july?..Will try and post pics of these stations this weekend..

But i hope they do it..reach 3 is my home stretch..if they throw it open even by August, i will personally visit Sivasailam in his HSR layout home and give him sweets :-)
srivatsayb no está en línea   Reply With Quote
Old January 2nd, 2013, 04:27 AM   #14180
pavan9741650414
ಹುಬ್ಬಳ್ಳಿ ಮತ್ತು ಧಾರವಾಡ
 
pavan9741650414's Avatar
 
Join Date: May 2011
Location: Hubli, bangalore
Posts: 4,785
Likes (Received): 697

pavan9741650414 está en línea ahora   Reply With Quote


Reply

Tags
bangalore, bangalore metro, bangalore namma metro, bengaluru, bengaluru metro, metro, namma metro, namma metro bangalore, traffic

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 05:13 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 18.75%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu