|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
#9381 |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
few old pics on http://economictimes.indiatimes.com/...w/18258458.cms
|
|
|
|
|
|
#9382 |
|
On the roof in the rain
Join Date: Sep 2004
Location: Madison/Mumbai
Posts: 447
Likes (Received): 10
|
So if they want to make the entire new terminal including both piers operational by end of 2014, they will have to demolish Jari Mari soon, as in before mid 2013. Because it will take 3 months to demolish and clean up, a year to build SE pier and 3 month to operationalize it. Optimistically speaking that is. I hope they do it sooner otherwise some stupid election code of conduct will come into play.
|
|
|
|
|
|
#9383 |
|
SilverEDGe
Join Date: Aug 2011
Posts: 9
Likes (Received): 0
|
Hey,
I have 2 questions, 1. some pages back I saw the shortened version of the SE pier. In the recent article the full SE pier is shown, which is it??? 2. Can the T2 handle A380's??? |
|
|
|
|
|
#9384 |
|
Registered User
Join Date: Apr 2012
Posts: 70
Likes (Received): 7
|
|
|
|
|
|
|
#9385 |
|
Registered User
Join Date: Sep 2011
Location: Mumbai, Doha
Posts: 676
Likes (Received): 42
|
|
|
|
|
|
|
#9386 |
|
Just Bond
Join Date: Nov 2008
Posts: 2
Likes (Received): 0
|
Thanx everbody
for great updates, sitting far away from home keeps you out of touch with reality.
|
|
|
|
|
|
#9387 | |
|
Registered User
Join Date: Apr 2012
Posts: 346
Likes (Received): 8
|
Quote:
|
|
|
|
|
|
|
#9388 | |
|
Registered User
Join Date: Sep 2011
Location: Mumbai, Doha
Posts: 676
Likes (Received): 42
|
Quote:
Also, the SE pier can be built without demolishing a single hutment! The stucture will lie completely within the current airport boundary. The encroached land across the mithi river is to be used only for a taxiway around the pier and for the remote parking bays. As such, work on the SE pier can begin immediately after the SW pier is inaugurated. Simultaneously, whenever the encroached plot across the river is cleared, the river will be covered over and tarmac will be laid.
__________________
Once you go MAC, you don't go BACK. |
|
|
|
|
|
|
#9389 | |
|
Aviation Enthusiast
Join Date: Aug 2009
Location: Mumbai
Posts: 500
Likes (Received): 40
|
Quote:
*********************** [Off-Topic] KLM Cargo Boeing 747-400F 'Oranje' rotating out of BOM Rwy 27 ![]() [/Off-Topic] |
|
|
|
|
|
|
#9390 | |
|
Registered User
Join Date: Mar 2007
Posts: 271
Likes (Received): 1
|
Quote:
|
|
|
|
|
|
|
#9391 | |
|
Registered User
Join Date: Apr 2012
Posts: 346
Likes (Received): 8
|
Quote:
Nice btw, i can hardly recognise that white air traffic control building over the wing... can anyone clear that for me?Also, GF, make sure you can click some pics on ur wayback to Doha... Have they opened the new Doha airport btw? |
|
|
|
|
|
|
#9392 | |
|
Registered User
Join Date: Sep 2011
Location: Mumbai, Doha
Posts: 676
Likes (Received): 42
|
Quote:
Yako, Thats more likely the apron control building near/on the current international terminal. Ill be able to take terminal pics only this time as my flight departs at around 3 am. The New Doha airport hasn't been open yet. Hey Rutvij, when did u hear of the A380 being scaled down to 2? wasn't it planned to have 2 A380 gates per pier?
__________________
Once you go MAC, you don't go BACK. |
|
|
|
|
|
|
#9393 |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
I would be surprise if they have only 2 Gates @ CSIA suitable for A380's aircraft. If they do, then its very short sight planning. Looking around the globe, other IMP airports have created or planned for few A380's gates on their terminal. I know, that we can not compare Mumbai to Dubai, but Dubai have created a whole additional separate terminal for A380's. To compete with other nearby hub, they have to have a few A380's gate, as we are not sure when the NMIA will start. Sooner or later GOV of India will give permission to allow A380 in India.
|
|
|
|
|
|
#9394 |
|
Registered User
Join Date: Mar 2007
Posts: 271
Likes (Received): 1
|
^Emirates has ordered more than 90 388s. Even then, one whole concourse dedicated to that plane will not be enough to handle all those aircraft, thus the need for the new World Central.
For BOM, around 3 to 4 388 gates is quite good for now. Sure BOM will have 388s once the govt. allows it, but I doubt it will require anywhere near the levels of DXB, or even LAX for that matter. At least BOM will have 388 gates, there are still airports whose administrations thought they would never need 388 gates, but EK has been the wildcard in that respect. It started DFW service last year, and now it wants to begin 388 service, up from the current 77L. Guess what? No 388 gate is available. So EK will either have to wait until DFW completes upgrading a gate in Terminal D, or EK will have to begin a second daily nonstop. |
|
|
|
|
|
#9395 |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
4 should be fine i guess as well, not expecting anything more then this.
|
|
|
|
|
|
#9397 |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
Yeh its similar
|
|
|
|
|
|
#9398 |
|
Registered User
Join Date: Mar 2007
Location: Houston, Texas
Posts: 1,302
Likes (Received): 21
|
This has come up before....the master plan for both the airports was done by the same firm Skidmore Owings and Merrill.....hence the similarity!!
|
|
|
|
|
|
#9399 |
|
Registered User
Join Date: Jul 2012
Posts: 200
Likes (Received): 15
|
I saw that a few months ago on some website and wondered why did SOM not think of that design for Mumbai airport ? It looks way better. Mumbai's airport seems to have a highly minimalistic design compared to this one. btw cost isn't a factor if you think so for the design as Abu Dhabi one costs just 2.27 billion $ which may escalate to 3 billion $ and Mumbai has already escalated to that point.
|
|
|
|
|
|
#9400 |
|
Registered User
Join Date: Mar 2007
Location: Houston, Texas
Posts: 1,302
Likes (Received): 21
|
The design for Abu Dhabi airport was done by Kohn Pedersen Fox based on SOM's master plan.....SOM's design was not accepted for the same reason you mentioned..."highly minimalistic design"!!
|
|
|
|
![]() |
| Tags |
| bom, csia, mumbai, mumbai airport |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|