Old October 4th, 2009, 03:08 PM   #1
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

Power projects proposed and under construction


REVISED LIST: As of Aug 2013

Quote:
Originally Posted by Simfan34 View Post
Revised list... this should be at the top of the thread.

Plants completed pre-1974:
Akaki HE Dam - 6 MW - 1932
Tis Abay I HE dam - 12 MW - 1953
Koka HE dam - 43 MW - 1960
Awash II HE dam - 32 MW - 1966
Awash III HE dam - 32 MW - 1971
Fincha HE dam - 134 MW - 1973

Period total: 253 MW

Plants completed 1974-1991:
Melka Wakena HE dam - 150 MW - 1989
Sor HE dam - 5 MW - 1990

Period total: 155 MW

Plants completed post-1991:
Aluto Langano Geothermal - 16 MW - 1998
Tis Abay II HE dam - 73 MW - 2001
Gilgel Gibe I HE dam - 184 MW - 2004
Gilgel Gibe II HE dam - 420 MW - 2008*(tunnel & HEP, no dam)
Tekeze I HE dam - 300 MW - 2009
Tana Beles HE dam - 460 MW - 2010*(tunnel & HEP, no dam)
Fincha Amerti Neshe HE dam - 97 MW - 2011
Adama I Wind Farm - 51 MW - inaugurated Dec 2012

Period total: 1,601 MW

Currently U/C:
Chemoga Yeda HE Dam - 278 MW - U/C but possibly delayed
Gibe III Hydroelectric Dam - 1870 MW - U/C - 1st unit to start generating power in Sept 2013
Hidase (Renaissance) HE Dam - 6000 MW - U/C* (1st two units to start generating power by the end of 2014)
Ashegoda Wind Farm - 120 MW - U/C - completion in mid-2013
Genale Dawa III HE dam - 254 MW - U/C
Aluto-Langano Geothermal Plant Expansion - 70 MW - U/C from Feb 2013
Adama II Wind Farm - 153 MW - agreement signed in Oct 2012*
Addis Ababa Waste Energy Plant - 50 MW - agreement signed Jan 2013
Aysha I Wind Farm - 300 MW (Just started the other day)

Period total: 9,995 MW

Planned:
Wabe Shebelle HE dam - 88 MW*
Gibe IV HE dam - 1479 MW
Halele-Werabesa HE twin dams - 422 MW - construction to start in 2013
Tekeze II HE dam - 450 MW
Dedessa HE dam - 300 MW
Mandaya HE dam - 2800 MW
Beko Abo HE dam - 2100 MW
Kara Dobi HE dam - 1600 MW
Assela Wind Power Project - 100 MW
Aysha II Wind Farm - 700 MW
Debre Berhan Wind Farm - 400 MW
Galema I Wind Power Project - 250 MW
Mosebo Harena Wind Farm - 42 MW
Geba I HE dam - 214 MW - financing secured from AfDB in Oct 2012
Geba II HE dam - 157 MW - same as above
Genale Dawa VI - 256 MW
Guder HE Dam - 1780 MW
Tams HE Dam - 1060 MW
Upper Guder HE Dam - 20 MW
Mabil HE Dam - 1440 MW
Birbir HE Dam - 467 MW
Dabus HE Dam- 740 MW
Gibe V - 660 MW

Period total: 17,516 MW

TOTAL: 28,615 MW






Under construction

1. Tekeze Hydropower DAM

Upon completion at the end of February 2009, the Tekeze Concrete Arch Dam in Ethiopia became the highest dam on the African Continent

Tekeze project description

Tekeze hydro power project is comprised of a double curvature (logarithmic spiral) concrete arch dam and appurtenant works, two river diversion tunnels, a 75m high power intake structure, power waterways (headrace tunnels, vertical pressure shaft, manifold, and four steel lined penstocks and four tailrace tunnels), an underground powerhouse containing four 75MW Francis turbines, outlet works, a 230kV substation and a 105km long double circuit transmission line, connecting to the Ethiopian national grid at Mekele.

At 188m high, the Tekeze Arch Dam ranks as the highest dam in Africa, eclipsing the previous record height for an African dam of 185m held by the Katse Arch Dam in Lesotho.

construction stage: trial Generation (100%)












2. Gilgel-Gibe II Hydroelectric Project



Gilgel Gibe II is a continuation of Gilgel Gibe I project which involved the building of a conventional dam with 917 million m3 lake and is able to generate 184 Mega Watts of electric power. The new plant, to be built under Gilgel Gibe II project, does not need a dam to be constructed. Instead, it will use the water discharged by the Gilgel Gibe I plant, channeled through a 26km tunnel under Fofa mountain, to Omo River Valley where it will harness 500 meter drop to generate 420 Mega Watts.

contractor: SALINI costruttori SpA

construction stage: trial Generation (100%)


3. Tana Beles hydropower project



construction stage: under construction (80%)

contractor: SALINI costruttori SpA


4. GIBE III HYDROELECTRIC PROJECT



The objective of the project is to enhance the hydropower generation capacity of the country through developing a plant with a capacity of 1870 MW and with an annual energy production of 6,500 GWh, This in turn is expected to raise the present 800 MW installed capacity of the country by 234 percent.

Moreover, the project has the aim of ensuring exportation of power to the neighboring countries through regional Interconnection Transmission System so that Ethiopia will be in a place of gaining hard currency through sells of electricity.

Turnkey Contract Agreement adopted for the Gibe III Hydroelectric Project was issued by the Federation International Des Ingenieurs Conseils (FIDIC). The Agreement was signed between the Ethiopian Electric Power Corporation (EEPCo) and Salini Costruttori S.p.A of Italy (Contractor) on 19 th July 2006. Amendment was also made on the Contract Agreement on April 22, 2008 since changes happened to the scope of the work.

As far as the quality inspection is concerned, the quality control of the design and construction is carried out by a Joint Venture Consultant- ELC Electrocosult (Italy)& Coyne et Bellier(France) is hired by EEPCo as Employer representative.

Regarding the structure, the basic design of May 2006 foresaw a Rockfill Dam with a large spillway structure on the right bank and the power intakes, headrace tunnels, penstocks/manifolds, surge shafts, powerhouse, and switchyard on the left bank. However, due to difficulties with obtaining proper and sufficient insurance coverage for the Rockfill Dam, the dam has been changed to Roller Compacted Concrete (RCC).

The Gibe III hydroelectric Project which is anticipated to be completed on July 2013 has a construction cost of 1,470 Million Euro (20.7 Billion Ethiopian Birr).

construction stage: Under construction (36% completed)

contractor: SALINI costruttori SpA

5. Fincha Amerti Neshe



6. Gilgel Gibe IV hydropower plant

Gibe IV will have an installed capacity of 1479 MW and the investment cost is estimated at 1.4 billion euros.

contractor: Sinohydro Corporation Limitted

construction stage: Under MoU

7. Genale Dawa III Hydro Power Project


located in the border between Oromia and Somalia regional states, the project, worth 408 million dollars, involves constructing a 110 metre high dam on the Genale River. This plant will be developed to have a capacity of 254MW.

contractor: China Gezhouba Group International Engineering Co. Ltd (CGGC)

construction stage: Under contract signing

8. Chemoga Yeda hydropower project


The Chemoga Yeda project, on the outskirts of Debre Markos, 299Km north of Addis Abeba in the Amhara Regional State, is expected to cost 555 million dollars. It will be carried out in two stages. This project will be completed in four years and nine months, according to the plan, and will involve the construction of five dams at Chemoga, Yeda, Sens, Getla and Bogena rivers. The reservoirs of these dams will be interconnected and the project is expected to generate 250MW.

contractor: China Gezhouba Group International Engineering Co. Ltd (CGGC)

construction stage: Under contract signing
__________________

Simfan34 liked this post

Last edited by yosef; August 8th, 2013 at 06:34 PM.
teklu no está en línea   Reply With Quote

Sponsored Links
 
Old October 4th, 2009, 05:31 PM   #2
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

hey guys how do u upload the photos?
teklu no está en línea   Reply With Quote
Old October 4th, 2009, 06:03 PM   #3
enkelfam
Registered User
 
enkelfam's Avatar
 
Join Date: Sep 2009
Posts: 614
Likes (Received): 174

http://blog.newsweek.com/blogs/wealt...e-s-water.aspx
Unfortunately, Egypt is trying hard to block any funding going to these projects.
Very Very SAD
enkelfam está en línea ahora   Reply With Quote
Old October 6th, 2009, 08:35 AM   #4
zumra
Registered User
 
Join Date: Oct 2009
Posts: 2
Likes (Received): 0

Who is consulting Egypt before funding the projects? Any way the best way is to fund such projects by ourselves. I believe the time we do so is coming.
zumra no está en línea   Reply With Quote
Old October 6th, 2009, 12:31 PM   #5
Yoniii
Registered User
 
Yoniii's Avatar
 
Join Date: Sep 2009
Posts: 9,751
Likes (Received): 1231

Angry

Quote:
Originally Posted by enkelfam View Post
http://blog.newsweek.com/blogs/wealt...e-s-water.aspx
Unfortunately, Egypt is trying hard to block any funding going to these projects.
Very Very SAD
Quote:
east africa is in the midst of a devastating drought--in Ethiopia, the dry spell has left close to 14 million people dependent on food aid. When assigning blame, aid workers and politicians finger the usual suspects: lack of rain, climate change, and an underdeveloped agricultural sector. But they're forgetting one: Egypt. Thanks to a 1929 agreement between *Britain--*acting on behalf of its East African *colonies--and a newly independent Egypt, Cairo holds the rights to two thirds of the Nile's water, as well as veto power over upstream projects. The disparity is stark: Ethiopia is the source of 60 to 80 percent of the Nile's flow, but uses less than 1 percent of it because Egypt says no to large-scale irrigation projects. And though Ethiopians might be tempted to circumvent the anachronistic arrangement, they can't. Egyptian officials work "behind closed doors" to block funding for upstream projects, according to David Shinn, a former U.S. ambassador to Ethiopia. The Nile states want to re-negotiate the ancient treaty, but Egyptian officials have stalled for years. And there's no sign they'll slake their neighbors' thirst any time soon.
This pisses me off!! This should get more media attention, the international community should all be aware of what they are doing.

This is how they repay Ethiopia for helping them get out off british conolization.
Yoniii no está en línea   Reply With Quote
Old October 11th, 2009, 12:05 AM   #6
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

construction progress in Gibe III










teklu no está en línea   Reply With Quote
Old October 11th, 2009, 12:14 AM   #7
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

project description and progress








teklu no está en línea   Reply With Quote
Old October 12th, 2009, 07:27 PM   #8
yosef
Ye Kebele Chairman
 
yosef's Avatar
 
Join Date: Aug 2008
Posts: 3,332
Likes (Received): 646

Quote:
Originally Posted by teklu View Post
Under construction

1. Tekeze Hydropower DAM

Upon completion at the end of February 2009, the Tekeze Concrete Arch Dam in Ethiopia became the highest dam on the African Continent

Tekeze project description

Tekeze hydro power project is comprised of a double curvature (logarithmic spiral) concrete arch dam and appurtenant works, two river diversion tunnels, a 75m high power intake structure, power waterways (headrace tunnels, vertical pressure shaft, manifold, and four steel lined penstocks and four tailrace tunnels), an underground powerhouse containing four 75MW Francis turbines, outlet works, a 230kV substation and a 105km long double circuit transmission line, connecting to the Ethiopian national grid at Mekele.

At 188m high, the Tekeze Arch Dam ranks as the highest dam in Africa, eclipsing the previous record height for an African dam of 185m held by the Katse Arch Dam in Lesotho.

construction stage: trial Generation (100%)









Wow


shes a monster, thanks teklu
yosef no está en línea   Reply With Quote
Old October 12th, 2009, 10:05 PM   #9
skipperBill
Hood Legend
 
skipperBill's Avatar
 
Join Date: May 2005
Location: Alexandria, Gedarif, Gondar
Posts: 1,186
Likes (Received): 6

Good Thread. I like the pictures Teklu and the info.

I posted a little bit about this in the Developement thread but I didnt put all this info in.


Its right here: http://www.skyscrapercity.com/showpo...&postcount=362


I only posted on Tekeze but not Gilge Gibe I, II,III, IV or the Tana Beles. If you could, you can add all of those to that thread as well. Please continue with this thread also, Im loving the pics
__________________
------a poor man's last dollar--------
skipperBill no está en línea   Reply With Quote
Old October 12th, 2009, 10:32 PM   #10
soulsoul
Registered User
 
Join Date: Mar 2009
Posts: 248
Likes (Received): 0

Thanks good thread,
Btw ethiopia will earn cash money by exporting electricity to this neighbors:



Ethiopia: Sudan’s national Electric agency is set to buy power from Ethiopia

July 22nd, 2009 Leave a comment Go to comments


Sudan’s national Electric agency is set to buy power from Ethiopia early next year after grid installation was completed last week.

Mr Saddiq Haroun, manager of the Ethiopia- Sudan power linkage project, told the Nation that a 157km power grid installation was done from Gedarif region of Sudan to Ethiopian west border.

The entire project will cost $35 million and India’s Import export Bank is to provide $25 million as loan to the Sudanese government.

The power grid consists of 400 towers which have a capacity of carrying 220KV.

Ethiopia is set to generate 4000 megawatts of electricity in the coming one year, which is double the national consumption.

Ethiopia has an agreement to export hydroelectric power, 200 Megawatts to Djibouti, 500 megawatts to Kenya and 200 megawatts to Sudan.

Currently, Ethiopia faces a serious power shortage and has been forced to ration power

After every one day there has been no power service all over the country, since last May 2009.

Ethiopia is building more than five big hydro-electric dams including the controversial Gibe 3 which is said to affect the flow of water from Ethiopia’s Omo River to Lake Turkana in Kenya.
soulsoul no está en línea   Reply With Quote
Old October 12th, 2009, 10:33 PM   #11
soulsoul
Registered User
 
Join Date: Mar 2009
Posts: 248
Likes (Received): 0

Thats a good thing cooperation between african countries
soulsoul no está en línea   Reply With Quote
Old October 13th, 2009, 01:57 PM   #12
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

skipperbill fill free to add anything. I gather most of the info from the internet. specifically if u want to follow the progress of the largest project(gibe3) go to the following website www.gibe3.com.et.

Last edited by teklu; October 13th, 2009 at 02:20 PM.
teklu no está en línea   Reply With Quote
Old October 13th, 2009, 03:19 PM   #13
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

About exporting energy: Even though the plan is a bit delayed due to current power shortage and unexpected demand increase in the country the plan is well underway. i think after the completion of the major stations the plan will resume. Here are the current and future interconnection.

existing and under construction power facility and transmission



Planned interconnection with neighboring country



Am surprised Eritrea is missing in this plan but hopefully they will drop the non-sense and come on board for this power integration project which create interdependence between neighboring country and lead to stabilizing the region and economical integration.

Last edited by teklu; October 13th, 2009 at 03:31 PM.
teklu no está en línea   Reply With Quote
Old October 13th, 2009, 03:30 PM   #14
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

Here is the table for under construction and future candidate hydro power station.

Under construction and recently completed



future candidates

teklu no está en línea   Reply With Quote
Old October 13th, 2009, 03:36 PM   #15
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

here are the ongoing studies on geothermal energy

teklu no está en línea   Reply With Quote
Old October 14th, 2009, 05:30 AM   #16
abesha
BANNED
 
abesha's Avatar
 
Join Date: May 2006
Location: Behind you
Posts: 16,862
Likes (Received): 499

Very interesting thread. These numbers don't include investments in wind and solar power right?
abesha no está en línea   Reply With Quote
Old October 17th, 2009, 10:04 PM   #17
Tarrex
Registered User
 
Tarrex's Avatar
 
Join Date: May 2007
Posts: 755
Likes (Received): 333

Construction progress on GIBE DAM III

Tarrex no está en línea   Reply With Quote
Old November 5th, 2009, 09:45 PM   #18
Simfan34
Complainer-in-Chief
 
Simfan34's Avatar
 
Join Date: Oct 2009
Location: NYC
Posts: 11,222
Likes (Received): 1510

While the rest of the world was patting itself on the back for using 5% "green" sources of power, Ethiopia was going all out.
.
Simfan34 no está en línea   Reply With Quote
Old November 15th, 2009, 01:04 PM   #19
teklu
Wuha Lemate
 
teklu's Avatar
 
Join Date: Jan 2009
Posts: 159
Likes (Received): 11

Tekeze hydropower Africa’s first ever biggest power dam inaugurates

Ethiopia opens 300 MW dam, starts producing 80 MW
Sun Nov 15, 2009 10:21am GMT

Print | Single Page
[-] Text [+]

ADDIS ABABA (Reuters) - Ethiopia opened a dam on Saturday that it says will produce 300 MW of hydropower as part of efforts to overcome chronic energy shortages and become one of Africa's only power exporters, state media said.

Power shortages are common in Africa and have hindered investment, even though the continent has abundant potential resources of solar, hydro, oil, gas, coal and geothermal power.

The Tekeze Dam has started producing 80 MW and that will rise to 300 MW, state-run Ethiopian Television said. It did not say when the dam would reach full capacity.

The dam is on the country's Tekeze river and its $356 million cost was financed by the China National Water Resources and Hydropower Engineering Corporation.

At 185 metres, it is the tallest hydroelectric dam on the world's poorest continent.

Outages have been common in Ethiopia for five years. The country rationed power for over five months this year with lights going off every second day, closing factories, hampering exports and fuelling a shortage of hard currency.

Ethiopia has six other hydropower dam projects being built, some funded by the World Bank. Government officials say the Horn of Africa nation will become a net power exporter within 10 years, exporting to Kenya, Sudan and Djibouti.

The country in September agreed deals with another two Chinese firms, China Gezhouba Group Company and Sinohydro Corporation, to build two huge hydropower projects.

EEPCo has also signed a preliminary agreement with the Hydrochina company for the construction of two wind farms to be reserved for emergency power shortages.

China has displaced many western countries as the major investor in Africa, where it has pumped billions of dollars into securing access to Africa's commodities. Ethiopia says it will spend $12 billion over 25 years to improve its power supply.

http://www.ethiotube.net/view_video....3a531b460fa8d1
teklu no está en línea   Reply With Quote
Old November 17th, 2009, 11:36 PM   #20
yosef
Ye Kebele Chairman
 
yosef's Avatar
 
Join Date: Aug 2008
Posts: 3,332
Likes (Received): 646

Screenshots of completed Tekeze

yosef no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 02:14 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu