ms_saleem
Registered User
 
Join Date: Jan 2010
Posts: 133
Likes (Received): 320

You can't just replace furnace oil with LNG in thermal power plant to reap benefit on efficiency or cost. Why burn gas in the boiler to get 25% efficiency while we have Gas Turbines based power plants that give upto 62% efficiency?

One of incentives these plant can be given is the encouragement to trash their boilers and put up coal fired boilers. Which they won't do because it is too expensive. K-Electric is replacing unit 3 & 4 with Coal unit at it's Bin Qasim Power Station 1 that has 6 units of total capacity of 1,260 MW at BQPS-I

They can be encouraged to early retire their existing furnace oil fired power plants and set up Coal units next to existing plants like Jamshoro and HUBCO are doing . If not then they should be paid capacity charges for not producing electricity and use them as peak load units until their contracts expire or plants reach retirement age.

Kot Addu (1,350 MW), HUBCO (1,292 MW), Jamshoro (850 MW), BQPS-I (1,260 MW), & PakGen (1,350 MW) are monsters that need to be converted, upgraded and enhanced to become a real baseload power plants powered by coal.

Quote:
Originally Posted by AsifIjaz View Post
Why bomb them.. why dont we give incentives (lets say a few percent extra tariff) to the company to convert them to LNG. in the longer run you would still save money as well as the environment.
ms_saleem no está en línea   Reply With Quote

Sponsored Links
Old Yesterday, 11:11 PM   #22
Pak_Forever
Registered User
 
Pak_Forever's Avatar
 
Join Date: Mar 2016
Location: Karachi
Posts: 7,526
Likes (Received): 11661

Hub power plant to benefit four million families

http://nation.com.pk/national/26-Mar...llion-families

Chairman of a Chinese power enterprise, Wang Binghua has said that the new Hub coal-fire power plant being constructed under China-Pakistan Economic Corridor (CPEC) would benefit four million families including the local people after its completion in 2019.

The power plant project, which is one of the “priority projects” under CPEC, is being constructed and invested in by the China Power International Holding Ltd, a subsidiary of China’s State Power Investment Corporation (SPIC), and Pakistan’s Hub Power Company Ltd, with a total cost of some $2 billion.

In an interview, Wang said that after the fulfillment of the project, local people will enjoy cheaper electricity and about four million Pakistani families will benefit from the power plant, adding that the coal-fire power plant also adds variety to Pakistan’s energy consumption system so as to help the country ensure its energy security.

“Any country cannot only rely on one sort of energy. Coal-fire power plants, gas filed power plants, solar farms, wind energy, bio-energy or other new energies should all be utilized in order to guarantee its energy security. Therefore, it is necessary for Pakistan to build the coal fire power plant,” Wang said.

“As to the Hub project, our company attached a great number of importances to five issues that are, the plant’s safety, operation reliability, environment friendly standard, economy and adjustability. And I’m confident to say that we are providing an excellent and responsible service to Pakistan since all of the equipments to be used in the project are of top class globally,” said the Chinese entrepreneur.

“We are adopting a super clean’ emission technology which could make the emissions at the plant the same as a gas filed power plant. And with the Hub project, we also plan to build a cement factory nearby so as to utilize all wasted dust produced by the power plant,” he added.

“We come to Pakistan not for the installation of our equipment and to gain profits. We pay more importance to better improving the development of local high-end manufacturing industries so as to make the development sustainable. We also try to group more and more local communities into our project to dispel their worries.”

“We plan to enroll a number of Pakistani graduates and to provide training to them to make them skilled. These local employees will be an important human resource for the country.” Wang said.

According to Wang, the Hub coal fire power plant is expected to be fully operational in August 2019 and it will generate about 9 billion kwh of electricity to the Pakistani national grid annually. It will also create about 10,000 jobs for local people during its construction.
Pak_Forever no está en línea   Reply With Quote


Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 05:10 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2017, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu