daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Fórum Português > Arquitectura e Urbanismo > Centro > Projectos



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old August 17th, 2017, 09:21 PM   #1
ERVATUGA
- Take it easy -
 
ERVATUGA's Avatar
 
Join Date: Apr 2010
Location: Shéol
Posts: 41,483
Likes (Received): 15213

Coimbra | Novo centro de saúde Fernão de Magalhães

Coimbra | Novo centro de saúde Fernão de Magalhães
__________________
- Please, be Happy -
ERVATUGA no está en línea   Reply With Quote

Sponsored Links
Old August 17th, 2017, 09:22 PM   #2
ERVATUGA
- Take it easy -
 
ERVATUGA's Avatar
 
Join Date: Apr 2010
Location: Shéol
Posts: 41,483
Likes (Received): 15213

CMC APROVA PROJETOS DE ARQUITETURA PARA NOVO CENTRO DE SAÚDE FERNÃO DE MAGALHÃES E REMODELAÇÃO DE CELAS

O vereador do Urbanismo da Câmara Municipal de Coimbra, Carlos Cidade, deferiu os projetos de arquitetura do futuro Centro de Saúde Fernão de Magalhães e da remodelação do Centro de Saúde de Celas. No primeiro caso, trata-se de uma construção nova, a erigir entre a Av. Fernão de Magalhães e a Rua Padre Estevão Cabral, num espaço que hoje é utilizado como estacionamento. Quanto ao Centro de Saúde de Celas, trata-se de introduzir melhorias funcionais na infraestrutura existente.

Os objetivos da construção do novo Centro de Saúde Fernão de Magalhães incluem melhorar as condições de atendimento da população e o acesso a cuidados de saúde; promover a reforma dos cuidados de saúde primários e obter ganhos em saúde da população abrangida.






Fonte: CMC
__________________
- Please, be Happy -
ERVATUGA no está en línea   Reply With Quote
Old August 17th, 2017, 09:25 PM   #3
Barragon
Barra for Friends
 
Barragon's Avatar
 
Join Date: Dec 2004
Location: Barreiro
Posts: 112,342
Likes (Received): 8441

Esse ia para os projectos de Coimbra
__________________
::: Portuguese Forum :::

::Visita ao Alto Alentejo ::

Fat people are harder to kidnap
Barragon no está en línea   Reply With Quote
Old August 17th, 2017, 09:26 PM   #4
ERVATUGA
- Take it easy -
 
ERVATUGA's Avatar
 
Join Date: Apr 2010
Location: Shéol
Posts: 41,483
Likes (Received): 15213

Pelas fotos é mais entre a Av. Fernão de Magalhães e a Rua Figueira da Foz:

https://www.google.com/maps/place/Co...5!4d-8.4102573
__________________
- Please, be Happy -
ERVATUGA no está en línea   Reply With Quote
Old August 17th, 2017, 09:27 PM   #5
ERVATUGA
- Take it easy -
 
ERVATUGA's Avatar
 
Join Date: Apr 2010
Location: Shéol
Posts: 41,483
Likes (Received): 15213

Quote:
Originally Posted by Barragon View Post
Esse ia para os projectos de Coimbra
Faz como bem entenderes barra Podiamos esperar para ver os projetos. Se não houver novidades poderiamos sim transferir este tópico.
__________________
- Please, be Happy -
ERVATUGA no está en línea   Reply With Quote
Old August 17th, 2017, 09:32 PM   #6
Lino
'tou na lua...
 
Lino's Avatar
 
Join Date: Oct 2007
Location: Coimbra
Posts: 38,252
Likes (Received): 4484

Espero que venha rápido, que o actual (quase ao fundo da avenida e no prédio do IEFP) não tem condições de acesso e está completamente degradado....
__________________
Força Portugal!!
Lino no está en línea   Reply With Quote
Old December 31st, 2017, 12:01 AM   #7
ERVATUGA
- Take it easy -
 
ERVATUGA's Avatar
 
Join Date: Apr 2010
Location: Shéol
Posts: 41,483
Likes (Received): 15213

Quote:
Originally Posted by DaniFR View Post
Centro de Saúde da Fernão de Magalhães prometido para 2020



A Administração Regional de Saúde do Centro (ARSC) submeteu hoje a candidatura para a construção do novo Centro de Saúde Fernão de Magalhães ao Programa Operacional Centro 2020.

centro saúde fernão magalhães
Localizadas em plena Avenida Fernão de Magalhães, as novas instalações têm um custo previsto de 3,6 milhões de euros. O edifício compreende a construção de quatro pisos, uma cave e parque de estacionamento com 37 lugares.

A ARSC afirma que “de acordo com a calendarização preestabelecida, a construção iniciar-se-á em 2018 e ficará concluída em 2020”.

Noticias de Coimbra
__________________
- Please, be Happy -
ERVATUGA no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 04:23 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium