HYDERABAD Projects and Updates - II

Hi

It was recently announced that MW Zander is to build the new Fab City in Hyderabad - does anyone know if the architecture plans for this development are available yet?

Thanks
zing no está en línea   Reply With Quote

Sponsored Links
 
Old April 19th, 2007, 10:10 AM   #2
Kingmaker
Wet your whistle!
 
Kingmaker's Avatar
 
Join Date: Apr 2007
Posts: 155
Likes (Received): 0

SemIndia ropes in MW Zander

great news: world leader in constructing Fabs roped in for Semindia plant.
----------------------

NEW DELHI: MW Zander, one of the world’s largest builders of hi-tech buildings and industrial plants, is all set to give shape to India’s semiconductor industry.

MW Zander will design and construct the assembly test and mark plant (ATMP) of the $3.5 AMD-SemIndia fab. Besides, the company is also in talks with Hindustan Semiconductor Manufacturing Corporation to set up its 10 proposed foundries worth $4 billion.

Worldover, MW Zander builds semiconductor facilities for Intel, AMD, Infineon, Chartered. It also provides services to the world’s largest chip foundry — Taiwan Semiconductor Manufacturing Corporation (TSMC).

“We are designing SemIndia’s ATMP facility. We are also in talks with HSMC and SemIndia to design their facilities. Globally, facilities management and design constitutes about 25-30% of total project cost. We expect the same in India, “ MW Zander’s managing director Helmut Kurzboeck told ET.

Going by these calcualtions, the HSMC fab may yield $1 billion for MW Zander. The SemIndia fab proposed to be set up at a cost of $3.5 billion may yield $875 million in revenues for the company. “Of course, these revenues will flow over a period of many years,” Mr Kurzboeck added.

In India, MW Zander, is about 10 years old with life-sciences clients like Shantha Biotech, Ranbaxy, Reliance Life Sciences, Astra Zeneca and Ministry of Defence. The company provides clean room technology for the electronic, solar, pharmaceutical, chemical, biotechnological and food-processing industries, research in the production of clean room components, construction technology as well as facility management.

The company provides end to end solutions for setting up a chip fab from consulting planning and construction to operation of semiconductor plants. MW Zander also provides sophisticated equipment like cleanroom ceiling grid systems, ultra filter fan units, air showers and precison air-conditioning systems used in chip manufacturing.

A cleanroom is an environment, typically used in chip manufacturing or scientific research, that has a low level of environmental pollutants such as dust, airborne microbes, aerosol particles and chemical vapors. Isocab and Hutchins & Hutchins are other big cleanroom suppliers in the world.

http://economictimes.indiatimes.com/...ow/1825680.cms
Kingmaker no está en línea   Reply With Quote
Old April 24th, 2007, 11:08 AM   #3
Kingmaker
Wet your whistle!
 
Kingmaker's Avatar
 
Join Date: Apr 2007
Posts: 155
Likes (Received): 0

Thumbs down Authorities yet to wake up!

Projects of significant importance never get the attention they deserve

-------

HYDERABAD: Stung by criticism over the slow progress in the implementation of the prestigious semi-conductor complex near the city, the State Government has initiated a series of measures to give impetus to the project.

Chief Secretary J. Harinarayan held a meeting with senior officials of the Industries and Information Technology departments to identify and remove the bottlenecks in implementing the Fab City. The Industries Department began working out details of incentives like supply of power and water at concessional rates to be offered to the project. Sources said the Government would issue an order very soon clearing the land allotment and specifying the incentives as well as the guidelines to be followed by the promoter, SemIndia.

The Government is understood to have tentatively finalised a price of Rs. 20 lakhs an acre for alienation of 1,200 acres of Government land to the Fab City, the sources added.

However, only 300 acres would be handed over to SemIndia first for this price. The rest of the land would be allotted, depending on the response by others to establish units in the Fab City.

Senior officials, contacted by The Hindu, insisted that Fab City was going to be reality and dismissed the criticism by political parties as baseless. The Government signed an agreement with SemIndia on February 16 last and the company immediately registered its local arm on February 21.

They attributed the delay in issuing the relevant orders to the Centre not announcing its semi-conductor policy until February 22, 2007. They said SemIndia would invest Rs 15,000 crore for the Rs 40,000-crore mega project.

Following a message from the Government, SemIndia Chairman Vinod Agarwal is rushing here from the United States on Tuesday to respond to apprehensions being raised whether the project would come up at all and whether the company was competent enough to execute it.

http://www.hindu.com/2007/04/24/stor...2418090100.htm
Kingmaker no está en línea   Reply With Quote
Old July 19th, 2007, 02:03 AM   #4
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,712
Likes (Received): 50

HYDERABAD Projects and Updates - II

HYDERABAD Projects and Updates - IX
Let us continue here ...


Charminar logo to brand city * `Hyderabad on Mission Tomorrow' *



(link to previous thread: ) http://www.skyscrapercity.com/showth...5#post14337795
Babji no está en línea   Reply With Quote
Old July 19th, 2007, 02:06 AM   #5
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,712
Likes (Received): 50

just a recap: Hyd Calendar
ORR Phase II (61 km) Select builders and award works ============= Aug 2007 (done)
Jamia Osmania ROB (2001 - 2007) ============================ Aug 2007 (done)
Nalgonda cross roads flyovers: ============================== Sep 2007 (done)
MMTS - APSRTC Issue of common fare tickets =================== Oct 2007 (done)
APIIC 100F Trade Tower: APIIC to issue Letter of Award to Reliance === Oct 2007 (done)
ORR Phase II Begin works ================================== Nov 2007 (done)
HMR: Announce Concession Agreement ======================== Jun 2007 (done)
HMR: Open Technical bids ================================== Jul 2007 (done)
HMR: Inauguration of MetroRail Bhavan at Saifabad =============== Aug 2007 (done)
HMR: GoI clearance for 20% viability gap+10% JNURM funds ========= Apr 2008 (done)

Panjagutta flyover part I (ICICI Bank to Topaz Building part): ======== Oct 2007 (done)
Greenlands Flyover Part I (from CM’s camp office to Begumpet ROB ==== Nov 2007 (done)
Chandrayanagutta flyovers: ================================ Dec 2007 (done)
HIAL @ Shamshabad (PPP modal) ============================= Mar 2008 (done)
Six-laning of the road from Mehdipatnam to Hyderguda ============= Mar 2008 (done)
Six-laning of the road from Hyderguda to Aramgarh jn ============== Mar 2008 (done)
Panjagutta flyover part II (Kirtilal Jewellers to Vengal Rao Park/Chutneys) Jul 2008 (done)
ORR phase-1: (22 km) 4 lane connectivity to HIAL (HUDA) =========== Nov 2008 (done)
Greenlands Flyover part II (start from Begumpet and land at HPS ====== Dec 2008 (done)

FAB City: SemIndia Phase-I (with investment of $100 million) ========= Feb 2009 (done) One unit done shipment of product
US Consulate to commence operations ========================= Mar 2009 (done)
Seetafalmandi ROB == ( 13 years in construction!) ============== Jul 2009 (done)
PVNR Eway SD Hospital Mehdipatnam – Hyderguda (5.1 km) (HUDA) ==== Oct 2009 (done)
PVNR Eway Hyderguda - Attapur -Katedan Aramgarh Jn (NH7) ======== Oct 2009 (done)
Musi Revitalization project ================================== Dec 2008 U/C
The Rs 400-crore Charminar Pedestrianisation Project ============== Nov 2008 U/C

Integrated Bus Terminus Twin Towers Sec'bad == Select builder ===== Jul 2008 (on hold)
HMR: Open Financial bids, Select BOT developer ================= Jul 2008
HMR: Commence construction =============================== Dec 2008

MMTS Phase II:
Secunderabad-Medchal (28 km), Falaknuma-Shamshabad (20 km),
Secunderabad-Ghatkesar (19 km), Moula Ali-Sanatnagar (21 km),
Moula Ali-Kachiguda (10 km) and Telapur-Patancheru (8 km).========= Dec 2009 (may be)
ORR Phase II: Induni-Era 12-km Narsingi to Kollur ================== Apr 2010 U/C
ORR Phase-II: Mytas-Gayatri 11.7-km Kollur-Muttangi =============== Apr 2010 U/C
ORR Phase-II: Ramki Infra and Elsamex 12.6-km Shamshabad- Tukkuguda = Apr 2010 U/C
ORR Phase-II: Mytas-Gayatri 13-km Tukkuguda- Bongulur ============ Apr 2010 U/C
ORR Phase II: ITNL-KMC 13-km Bongulur-Pedda Amberpet ============ Apr 2010 U/C

Uppuguda ROB (2007-2009) Kandikal Gate ROB (2007-2009) ========= Dec 2009

Some of the Future Skyscrappers in and around Hyderabad
Building Name ============= Location === Floors == Status
LT Info City "SERENE COUNTY" = Gachibowli === 14 == done == 10 Towers
Urban Entertainment Center DLF Basheerbagh == ?? == U/C (ETA 2010)
Saket and Sumeru Residential == AS Rao Nagar = 23 == U/C Jun 2007 (ETA 2010)
Financial Dist - ICICI Tower === Nanakramguda = 28 == U/C ETA Dec 2009
Waverock ================ Nanakramguda = 18 == U/C 12 acres.
Aliens Space Station ======== Tellapur ====== 30 == U/C ETA Dec 2009
Alien Space Station 2 ======= Shamshabad === 15 == U/C 29 acres of lush greenery 13 residential towers
The Iconia ================== 19 blocks @ 19 === U/C

Lanco Hills - IT and ITES ===== Manikonda ==== 20 == U/C 12 towers Proposed (some in Phase-I 2007-2010)
Lanco Hills - Residential ====== Manikonda ==== 30 == U/C == 16 towers Proposed (some in Phase-I 2007-2010)
28 July 2009 (Lanco Hills Status):
UNIT:=== 02LH = 03LH = 04LH = 05LH = 06LH = 07LH = 08LH = 09LH = 10Lh = 15LH = 16LH = 17LH = 99LH
STATUS:= 21FL = 27FL = 31FL = 21FL == 23FL = 27FL = 24FL = 19FL = 23FL = 24FL = 8FL = 21FL = Elevation W-I-P

Lanco Hills - Signature Tower == Manikonda === 100 == === 2008-2012 (phase-II)
Integrated Bus Terminus Twin Towers Sec'bad == 25F = Select builder: Jul 2008 (completion: 3 yrs)
Business Dist: APIIC Trade Tower Manchirevula= 100+ = 2008 + 4yrs. 40 lakh sft: Reliance @Rs. 7000 crore
Lodha Group ============== Madhapur ==4 * 45 ====== 2008-2011

SMR Vinay Fountainhead, Mettuguda======= 4x 22F ====== 2008 - 2011
DLF SEZ 26 acres =========== Poppalguda == ?? == Proposed @Rs. 5000 crore

SIX NEW JEWELS IN HYDERABAD'S CROWN
1) PENTAGON ----- The IT and Commercial Hub, Miyapur (104 acre layout at Miyapur)
------------------- The originally planned 200 acres @ Poppalguda is under litigation
2) HUDA Minifer --- The Beautiful city, Budvel (mini township project in 200 acre will comprise of villas)
3) Regal BRoadway - The Hotel Corridor - Badvel (100 acres hotel corridor, by AP Tourism Dept)
-------------------- The originally planned 200 acres @ Shamshabad will be auctioned as plots for housing
4) GIGA City ------- The IT and Knowledge Destination (2000 acres beyond Secunderabad Cantonment)
5) Calibre SEZ ----- Kokapet (100 acre area close to the Financial District and HUDA Golden Mile)
6) Elixir City ------- The fountain of life (200 acre medical city at Ameenpur)
Townships and other multi-use projects
Boulder Hills Golf & Country Club by Emaar MGF 531 acre Rs. 12,000 Crore Gachibowli (2008 - 2010)
Tellapur Township == 400 acre, Rs.10,000 crore township project at Tellapur (2007 - 2010)
Kokapet Golden Mile = 70 acre Golden Mile project at Kokapet (Proposed)
Other Development projects
1) Kokapet SEZ in 275 acres of land (phase-I: Google, Patni, Sonata, Intelligroup,
Conexant, c-Bay, Cognizant, Qualcomm, DQ, Infinite and Tech Mahindra ...) ===== Nov 2007
http://www.cyberabadtimes.net/2007/1...her-it-sez.asp
Hyderabad Digital Media City 100 acres @ Sultanpur ======================= 2008 - 2010

Last edited by Babji; January 23rd, 2010 at 02:43 PM.
Babji no está en línea   Reply With Quote
Old July 19th, 2007, 02:09 AM   #6
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,712
Likes (Received): 50

some of delyas in contemporary infra projects ...
== Project ============== Original ETA == Completion ======== Delay
Panjagutta Flyover part II ==== Dec 2006 === Jul 2008 ========= 08 months
Greenlands Flyover ========= Dec 2006 === Dec 2008 ========= 24 months

Recent Road Infra project ==== Original ETA = Actual ETA ======== Delay ==
ORR Phase-I 24 km ========== Mar 2008 === Nov 2008 ======== 08 months
ITEL IT Corridor 20 km ======= Apr 2007 ==== Oct 2008 ======== 18 months
Kathipara Grade Separator ==== Apr 2007 ==== Oct 2008 ======== 18 months

BETL B'lore 9 KM =========== Jul 2008 ===== Jan 2010 ======== 18 months
PVNR EEway Hyd 11.6 km ==== Oct 2008 ===== Oct 2009 ======== 12 months

http://www.deccanherald.com/Content/...0706066024.asp
http://20twentytwo.blogspot.com/2008...xpressway.html

Quote:
Originally Posted by india View Post
Quote:
Overwhelming response to sale of residential space at LANCO HILLS
18 July, 2007

... About 4 million square feet of residential space has been booked within three days of the opening of the bookings to the public.

... The total area being developed would be around 30 million square feet. The complete project is targeted for completion in various phases ranging from 2 to 4 years.
looks very encouraging.

Last edited by Babji; January 23rd, 2010 at 02:40 PM.
Babji no está en línea   Reply With Quote
Old July 19th, 2007, 02:51 AM   #7
vadi
Registered User
 
Join Date: Jan 2006
Posts: 356
Likes (Received): 0

babji you are just amazing sir.
yem gnyanamanDi.
vadi no está en línea   Reply With Quote
Old July 19th, 2007, 03:19 AM   #8
grimmm
Registered User
 
grimmm's Avatar
 
Join Date: Oct 2005
Location: hyderabad
Posts: 666
Likes (Received): 0

Quote:
Originally Posted by p.raghavendra6;
Today, Punjagutta police towed away my bike for illegal parking.

I had to shell out Rs 200/- (50 for illegal parking, 150 for towing).

I argued that I parked within the margin, but the guy at the police station said that they cant do much coz they already prepared the challan. They didnot even showed me the photograph proof.

By the way, Is our traffic police department outsourced?
most of the personnel inside the station were some private security agency fellows wearing police uniform.
I usually do see some private security people operating at certain junctions. Maybe due to staff shortage traffic department might have hired these guys on temporary basis.

I think traffic cops on that day must have fell short of target set to collect fine amount per day and you were like a god sent gift to them .
grimmm no está en línea   Reply With Quote
Old July 19th, 2007, 04:48 AM   #9
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,712
Likes (Received): 50

http://www.cyberabadtimes.net/2007/0...-hyderabad.asp
Quote:
It's not easy in Hyderabad
To build any new facility roads or flyovers in this complex concrete jungle called Hyderabad is a monumental task without being caught in legal problems, or a maze of cables and pipelines.

Though GHMC officials claim land acquisition was the reason for delays, they refuse to admit that they started these projects without acquiring land in the first place. A handful of properties, including those of two former judges, literally put a spanner in flyover works in the city, resulting in overshooting deadlines and inconvenience to road-users. The Punjagutta flyover was caught in legal wrangles. The Greater Hyderabad Municipal Corporation (GHMC), the executing agency, could acquire a property belonging to a showroom only in April, 2007, two months after the 'official' deadline. Similarly, the Greenlands flyover has overshot the deadline by eight months due to a hitch with four properties. The last of these was taken over in April. Likewise, it took nine months for officials to acquire property of one Habeeb at Chandrayanagutta. Though the flyover works began in September, 2005, acquisition was completed in April this year. These three flyovers showcase official apathy. As a result, traffic congestion is not an aberration, but the norm in the city.

Though GHMC officials claim land acquisition was the reason for delays, they refuse to admit that they started these projects without acquiring land in the first place. Of 116 properties identified for acquisition, 38 land owners gave their consent, while the majority settled for the land acquisition mode. Only a handful went to court. For getting a property of former judge B Subhashan Reddy at Somajiguda, the officials had to spend three months to complete all formalities to acquire it.

The branched-out Punjagutta flyover is eight months behind schedule. Changes in the alignment at Chutney's, acquisition of properties and ever-increasing traffic resulted in delay, claim officials. "Normally, construction of a pier takes 15 days, but due to underground cables, water and sewer lines, the contractor, Gammon India, could complete one pier in three months," GHMC superintending engineer R Sridhar said. Now, the corporation hopes to open it in November....

The 1.1 km-long Greenlands flyover is behind schedule by nine months. The contractor, JMC Projects, bagged the work in December, 2005 and was to complete it by February, 2007. However, the works were stalled at the Begumpet road over bridge (ROB) when the railways raised doubts on the stability of the bridge. The new flyover would be merged with the existing ROB. As the railways wanted to see the design of the flyover, precious two months was lost. The rail officials agreed to the proposal only after studying a JNTU report on the bridge post merger. After several impediments, the flyover works are now progressing. It is likely to be opened by November. The trumpet-shaped Nalgonda crossroads flyover got delayed for over eight months due to acquisition delays and traffic diversions. The disabled welfare department took five months to hand over property to GHMC. The flyover works began in November, 2005, but due to a controversy over the alignment drawings it actually started in January, 2006. It is likely to be over in September.

The smallest flyover (450 metre-long Chandrayanagutta flyover) took nearly two years for completion though the project time was just 10 months. The flyover works started in October, 2005 and should have been ready by September, 2006. Of six properties, one property owner went to court. After the court verdict, the corporation was forced to cough up Rs 7 lakh. With the flyover almost ready, the authorities plan to inaugurate it by August 15...

After nine long years and acquisition delays, the Sithaphalmandi ROB, which started in 1999, is likely to be ready by December.

The Jamai-Osmania ROB, which too began in 1999, is in the final stages of completion. It is likely to be opened by August 15.... Source: The Times of India

Last edited by Babji; July 19th, 2007 at 04:58 AM.
Babji no está en línea   Reply With Quote
Old July 19th, 2007, 05:36 AM   #10
p.raghavendra6
in-active member
 
p.raghavendra6's Avatar
 
Join Date: Jun 2006
Location: Pune/Hyderabad/Chennai/Bangalore
Posts: 1,564
Likes (Received): 473

Quote:
Originally Posted by Babji View Post
Overwhelming response to sale of residential space at LANCO HILLS18 July, 2007

... About 4 million square feet of residential space has been booked within three days of the opening of the bookings to the public.

... The total area being developed would be around 30 million square feet. The complete project is targeted for completion in various phases ranging from 2 to 4 years.
That means next phase will not be delayed.

The ball is now in Lancos court.
p.raghavendra6 no está en línea   Reply With Quote
Old July 19th, 2007, 05:54 AM   #11
Jai
ॐ शान्तिः शान्तिः शान्तिः
 
Jai's Avatar
 
Join Date: Jan 2003
Location: Haleiwa, Oahu, HI :. Waianae, Oahu, HI :. DETROIT, MI
Posts: 3,709
Likes (Received): 61

Babji
Quote:
Urban Entertainment Center DLF Basheerbagh == 60 == U/C (ETA 2010)
This news totally went over my head! Do you have any more information on this project? The search feature seems to be down
Jai no está en línea   Reply With Quote
Old July 19th, 2007, 11:45 AM   #12
p.raghavendra6
in-active member
 
p.raghavendra6's Avatar
 
Join Date: Jun 2006
Location: Pune/Hyderabad/Chennai/Bangalore
Posts: 1,564
Likes (Received): 473

Hyderabad going green

Source: ToI

Quote:
THE GREEN REVOLUTION

The green cover in the city is improving thanks to increasing awareness among people and initiatives by the government

Taking a refreshing walk at a park close to your home and not having to drive down to an oasis of greenery kilometres away, might soon become an everyday reality. The government and people are aggressively fighting to preserve the depleting green cover of the city and the endeavour has begun to show results.

The awareness to increase the green cover has increased in the last few years. Earlier, people lacked the right attitude but now – with alarming revelations about green cover depletion – the mindset is changing.

Says K S Reddy, IFS, executive director of Urban Forestry, “There are several new parks and gardens coming up. The Saroornagar Lake park and the one in Vanasthalipuram, are the latest on the list.” With concerns over global warming on the rise, it has become imperative to plant more trees and make space for gardens. The HUDA roughly differentiates parks into big parks and small parks. While the bigger ones require an investment of over Rs 2 crore and are located in commercial areas, the smaller parks can be budgeted at Rs 40 lakh and are usually in residential areas. The forest department also plants trees in specific areas or colonies on request. “We plant trees along roads, develop gardens and maintain them for a year, after which the responsibility is handed over to the colony authorities. There has been an increase in the number of such requests,” says Reddy.

Sheela Singh, a resident of Safilguda, says “The newly built park around Safilguda Lake is a boon.” Tree planting as an activity has also picked up. This is evident by the plant sales recorded by nurseries, close to Rs 100 crores. And with another Rs 40 crores as investment into urban forestry this year, the picture doesn’t look all that bleak.

However, building parks in a busy city is also challenging. Getting empty spaces is a challenge. “Our activities are limited to making parks around lakes, in GHMC-defined ‘open spaces’, or developing the existing ones,” Reddy sighs. The other issue is road widening. The trees planted along the roads are cut during road widening. To escape this, the HUDA plants trees along road dividers and in traffic islands. Making gardens and lawns around lakes has its disadvantages too. “Over the years, beautification activities – like spreading lawns – along lakeshores has depleted close to 30 per cent of the area of lakes,” says Veda Kumar, president of Forum for a Better Hyderabad.

The threat to the lake area is a rising concern. “I think authorities should plant trees rather than have lawns, which are water guzzlers,” says Shakti Singh, a college student. But with the government taking steps in the right direction and people feeling the dearth of the green cover, it looks like the city remaining evergreen might not be such a distant dream.

• According to a global norm, 33% of a city should have a green cover.

In 2004, Hyderabad reached a level of 24% green space, which is a sharp rise from a mere 4.2% in 1994.

New parks coming up at

• Vanasthalipuram

• Sachivalayanagar

• Prashantinagar

• AS Rao nagar

• Patel Nagar (KPHB)

• Chinnathalakunta (Rajendranagar)

• Rajaramnagar

• Theme park at Osman Sagar
p.raghavendra6 no está en línea   Reply With Quote
Old July 19th, 2007, 05:06 PM   #13
Luckystreak
Registered User
 
Join Date: Feb 2005
Posts: 2,937
Likes (Received): 18

Quote:
Overwhelming response to sale of residential space at LANCO HILLS

Source: Moneycontrol India

Oops! This is in contrary to what some of our onboard experts who said it was "very lukewarm" response.

Looks like I need to add moneycontrol.com to the list of websites not to be trusted.
__________________
SkyscraperCity India - In Sanity We Trust
Luckystreak no está en línea   Reply With Quote
Old July 19th, 2007, 09:28 PM   #14
isujay
Registered User
 
Join Date: Mar 2007
Posts: 85
Likes (Received): 0

Hyderabad going green

Last year HUDA was planning for a park at Narayanguda in the govt land behind Shanthi theatre. I don't think there is much progress on that.
isujay no está en línea   Reply With Quote
Old July 19th, 2007, 09:30 PM   #15
isujay
Registered User
 
Join Date: Mar 2007
Posts: 85
Likes (Received): 0

Hyderabad going green

Source: http://www.hindu.com/2006/04/14/stor...1421700300.htm
Quote:
HYDERABAD: The long-awaited park in the midst of highly congested concrete jungle in Narayanguda is only six months away.

The Hyderabad Urban Development Authority (HUDA) will develop the most modern park with a swimming pool, gym, joggers' track, amphitheatre, skating rink, children's play area, ponds and foot bridges in over six acres of land acquired from the Excise Department.

HUDA Chairman D. Sudheer Reddy laid the stone for the Rs.4.5-crore park on Thursday, and called upon officials to complete it by October 2 when HUDA would turn 31years.

Healthy living

Emphasising the need for the park at Narayanguda for the benefit of people living in surrounding areas, he said pure air and water were important for a healthy living.

He said if Bathkamma kunta dispute were resolved, HUDA would develop a park in the 100-year-old kunta as suggested by Anjan Kumar Yadav, MP, to protect it from encroachments.

Mayor T. Krishna Reddy congratulated HUDA for taking up the work. He said some amount from Mayor's funds would be allotted for the park.

Himayatnagar MLA Kishan Reddy said the entire land should be allotted to the park.
isujay no está en línea   Reply With Quote
Old July 20th, 2007, 01:23 AM   #16
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,712
Likes (Received): 50

Quote:
Originally Posted by Jai View Post
Babji
This news totally went over my head! Do you have any more information on this project? The search feature seems to be down
They are keeping a low profile as it has already attracted some criticism from various opposition parties.

The issues raised by the INTAC and Heritage committees have been resolved. The builders agreed to preserve the heritage structures intact and to maintain them. The earth works are in progress. The AP State Tourism Dept also has a stake in it, so we can expect some thing really cool.

We may not get to see any pics or renderings soon for fear of negative publicity...
Babji no está en línea   Reply With Quote
Old July 20th, 2007, 03:51 AM   #17
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,712
Likes (Received): 50

Cyberabad Times
Quote:
Mega tourism works in progress
The Tourism Department took up works valued at Rs 1,500 crore under public-private partnership (PPP) mode and some of them are in various stages of execution.

Works of Hyderabad Expo Centre and Spa training centre are nearing completion and would be inaugurated before the end of next month. Disclosing this at a press conference here today, after Chief Minister YS Rajasekhara Reddy formally launched the material pertaining to joint promotional initiatives by the Department and Air India at Assembly Committee Hall, Tourism Minister Anam Ramanarayana Reddy said that the Department has signed an agreement with Air India to promote tourism in Andhra Pradesh globally with an investment of up to Rs 24 lakh.

The influx of tourists to the State has slowly been increasing and it has touched 11.17 crore mark last year compared to 5.2 lakh visitors in 2001. Foreigners among the visitors last year were about 6.6 lakh. Night bazar in the city outskirts and Shilpa Sampada at Shilparamam will be ready next year.

Similarly, tenders were already invited for the construction of 30 budget hotels. The Minister informed that the Department would also utilise the occasion of conducting the 4th Military World Games in the city to promote tourism world-wide as defence personnel from about 90 countries will be participating in the games. An eight-day cultural programme 'Vijaya' will be held on the occasion of Military World Games. Source: The New Indian Express
Babji no está en línea   Reply With Quote
Old July 20th, 2007, 05:31 AM   #18
keshavasiva
CUPIDSTRUKWIDCUPID
 
keshavasiva's Avatar
 
Join Date: May 2007
Location: LAS VEGAS..NEVADA
Posts: 108
Likes (Received): 0

Smile

Originally posted by ranga in the previous thread.
Quote:
There is, no doubt, overwhelming response for the LANCO project.The price at which it was sold went upto Rs4250/- per sq ft.The signature tower is bound to come.The approval of International Aviation Authority,Canada is awaited.I can say optimistically that demand for ten more LANCO Size project is there in Hyderabad.
Hey tats cool man... But I surely think, by the time it completes there will be some other project which overtakes its height making it no longer remain the tallest residential tower

And guys please dont drag the previous thread more!!! Continue in this one!.
__________________
ROCK IS DEAD!
keshavasiva no está en línea   Reply With Quote
Old July 20th, 2007, 08:33 AM   #19
upendora
Unregistered user
 
upendora's Avatar
 
Join Date: Feb 2006
Location: Land of cute and kawaii
Posts: 164
Likes (Received): 0

Exactly what I said, there is overwhelming response because of the advertisement done about signature tower. Did they open bookings for the signature tower? If so, upto how many floors.


Quote:
Originally Posted by ranga View Post
There is, no doubt, overwhelming response for the LANCO project.The price at which it was sold went upto Rs4250/- per sq ft.The signature tower is bound to come.The approval of International Aviation Authority,Canada is awaited.I can say optimistically that demand for ten more LANCO Size project is there in Hyderabad.
upendora no está en línea   Reply With Quote
Old July 20th, 2007, 09:15 AM   #20
ranga
Registered User
 
Join Date: Nov 2006
Location: Hyderabad
Posts: 3,459
Likes (Received): 314

Quote:
Originally Posted by Babji View Post
They are keeping a low profile as it has already attracted some criticism from various opposition parties.

The issues raised by the INTAC and Heritage committees have been resolved. The builders agreed to preserve the heritage structures intact and to maintain them. The earth works are in progress. The AP State Tourism Dept also has a stake in it, so we can expect some thing really cool.

We may not get to see any pics or renderings soon for fear of negative publicity...
Not only opposition parties even some from the ruling party opposed the project and wanted the site for the office of APCC shifted from Gandhi Bhavan.But one thing is certain .The 60 story building is not coming as it is not permitted in that area.
ranga no está en línea   Reply With Quote


Reply

Tags
aliens, apartments in hyderabad, flats in hyderabad, hyderabad, hyderabad apartments, india

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 12:01 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu