daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Serbian Forum > Изградња и развој > Србија > Војводина

Војводина Vojvodina



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools Rate Thread
Old May 4th, 2008, 06:31 PM   #1
Singidunum
Grad Oblakodera
 
Singidunum's Avatar
 
Join Date: Jul 2004
Location: Beograd
Posts: 32,209
Likes (Received): 9260

ВОЈВОДИНА - праћење градилишта | VOJVODINA - construction updates

Pri kraju rekonstrukcija glamurozne „Velike terase“ na Paliću
Stara dama dobija novo ruho
Autor: Milenko Popadić | 04.05.2008 - 00:01

Najznačajniji i najglamurozniji objekat stare arhitekture na Paliću je svakako „Velika terasa“, na čijoj rekonstrukciji vredno rade majstori „PBG inženjeringa“. Prve tri faze radova već su završene, a veruje se da će do kraja godine ovaj objekat ponovo zasijati u punom sjaju.

„Velika terasa“ izgrađena je od 1909. do 1912. godine u stilu mađarske varijante secesije po projektima Marcela Komora i Jakaba Dežea kao višenamenski objekat za potrebe kulture, zabave, ugostiteljstva i trgovine. Imala je više dvorana u kojima su se održavali balovi, zabave, pozorišne predstave, sportska takmičenja i drugi sadržaji. Tadašnji „Vigado“ (Velika terasa) imao je i prostorije za umetnike, restoran, kafe poslastičarnicu, terase okrenute jezeru. Ceo objekat bio je, praktično, usmeren na razvoj banjskog turizma jer je Palić skoro pola veka ranije imao „kupke od lekovitog blata“ vađenog iz jezera, a dvojica lekara uspešno su lečila razna reumatična i kožna oboljenja.

- Zbog dotrajalosti objekta građevinska inspekcija je zabranila njegovo korišćenje 1991. godine. Bilo je planirano bezbroj rekonstrukcija, neki manji zahvati su i preduzimani, ali tek 2006. godine počela je ozbiljna i, rekao bih, prava rekonstrukcija „Velike terase“. Biće to sada, zaista, „centar sveta“ na Paliću i činiće temelj buduće Banje Palić - kaže Dragan Miljković, direktor JKP „Palić Ludaš“.
Rekonstrukciju „Velike terase“ nedavno je obišao i državni sekretar u Ministarstvu za ekonomski i regionalni razvoj Dragan Petković koji je, uz ostalo, rekao da palićki turistički potencijal nije sasvim iskorišćen, te da bi u budućnosti trebalo više pažnje posvetiti i razvoju seoskog turizma jer ovaj deo Srbije ima šta da pokaže svakom turisti.
- Informativni centar je izgrađen. Korak smo ispred rokova u rekonstrukciji „Velike terase“. Sredstva su obezbeđena iz NIP-a. Imamo čvrsta obećanja da u toj sferi neće biti problema, a potom odmah krećemo u realizaciju master plana i stvaranja Palića kao turističke velesile - izjavio je Jasmin Šečić, pomoćnik direktora Direkcije za izgradnju opštine.
Recimo da je sve donedavno bilo nesuglasica oko osnivanja javnog preduzeća koje bi bilo nosilac realizacije master plana. Imovinu u to preduzeće trebalo je da unesu lokalna samouprava, Pokrajina i Republika u ravnopravnom iznosu. Nesporazumi su otklonjeni i ministar Mlađan Dinkić, predsednik IV Vojvodine Bojan Pajtić i gradonačelnik Geza Kučera potpisali su ugovor o formiranju preduzeća „Park Palić“ koje bi do kraja godine trebalo da otvori „prvi paket“ velikog razvojnog projekta turizma na Paliću.

Po ugledu na Erdelj
„Velika terasa“ građena je po ugledu na narodno graditeljstvo Erdelja iz transilvanijske oblasti i mada je „preneta“ u sasvim drugačije podneblje, obilna upotreba drveta i dekorativnih motiva potpuno su uklopljeni u predeo Velikog parka. Ovaj objekat, praktično, natkriljuje stazu aleje koja se proteže od centralne saobraćajnice pa sve do obale jezera.
__________________
Like Skyscrapercity Serbian Forum on Facebook

Potpišite peticiju protiv rušenja Generalštaba!
Singidunum no está en línea   Reply With Quote

Sponsored Links
 
Old May 4th, 2008, 06:32 PM   #2
Singidunum
Grad Oblakodera
 
Singidunum's Avatar
 
Join Date: Jul 2004
Location: Beograd
Posts: 32,209
Likes (Received): 9260

Italijanska „Kalcedonija“ u Somboru
Budući radnici već na obuci
Autor: Z. Vasiljević | 04.05.2008 - 00:01

Italijanska grupacija „Kalcedonija“ počeće ovih dana obuku budućih radnika za fabriku miderskog programa. „Kalcedonija“ će u proizvodne pogone u Somboru uložiti 20 miliona evra, a gradnja će početi kada investitor dobije sve potrebne dozvole. U prvoj fazi u fabrici od 12.000 kvadratnih metara radiće oko 400 radnika.

Najznačajnija investicija u somborskoj industrijskoj zoni je izgradnja fabrike miderskog programa poznate firme „Kalcedonija“. Iako su najavljeni rokovi gradnje pomereni, „Kalcedonija“ ne odustaje od investicije u Somboru. Prva faza je izgradnja trening centra koji je završen i u kome će početkom nedelje početi obuka prvih radnika za buduću fabriku.

- U tom trening centru radnici će se obučavati za rad u velikoj fabrici, ali kroz gradnju trening centra simuliramo i sve moguće situacije koje nas mogu snaći prilikom izgradnje velike fabrike. U zavodu za zapošljavanje obavili smo razgovore za potencijalnim radnicima i napravili odabir - kaže direktor „Kalcedonije“ za jugoitočnu Evropu Dubravko Hoić. U gradnju trening centra površine 800 kvadratnih metara italijanska firma uložila je oko dva miliona evra. Gradnja pogona za proizvodnju miderskog programa površine 12.000 kvadratnih metara počeće kada se pribave sve dozvole. Hoić kaže da će u pogonu za proizvodnju miderskog programa raditi oko 400 radnika. Plan „Kalcedonije“ je i izgradnja fabrike za proizvodnju ženskih čarapa u kome će posao dobiti još oko 400 radnika. Investicija „Kalcedonije“ u Somboru vredna je oko 20 miliona evra.
- Mi smo obišli više lokacija, ali Sombor nam je pružio sigurnost da tu možemo realizovati svoju investiciju - dodaje Hoić. Od opštine Sombor „Kalcedonija“ je zakupila 10 hektara zemljišta u industrijskoj zoni. Italijanska firma dobiće i finansijsku podršku iz NIP-a od 2.000 evra po zaposlenom radniku. Ugovor o tome potpisan je polovinom prošle godine u Somboru sa ministrom Mlađanom Dinkićem.
Osim u Italiji „Kalcedonija“ ima proizvodne pogone u Hrvatskoj, Rumuniji, Bugarskoj, Sri Lanci i prodajnu mrežu u Evropi i Americi poznatu po dućanima „Kalcedonija“, „Intimissimi“ i „Tezenis“.
__________________
Like Skyscrapercity Serbian Forum on Facebook

Potpišite peticiju protiv rušenja Generalštaba!
Singidunum no está en línea   Reply With Quote
Old June 1st, 2008, 12:43 PM   #3
Luka
Registered User
 
Luka's Avatar
 
Join Date: Jun 2004
Location: Belgrade, Serbia
Posts: 7,866
Likes (Received): 1373

GP „Marko Orešković“ u centru Apatina gradi već deceniju i po
Tržni centar - konačno


U apatinskoj Glavnoj ulici, u blizini Gradske kuće i katoličke crkve Marijinog Uznesenja, štrči nezavršen tržni centar, zarastao u korov i do ulice zaštićen neuglednim daskama. Objekat pripada građevinskom preduzeću „Marko Orešković“, koje zbog niza okolnosti objekat nije završilo, u međuvremenu na dve aukcije nije privatizovan, a kupci poslovnog prostora i stanova ostali kratkih rukava.

Ove godine, posle deceniju i po otkad je započela gradnja tržnog centra, sva je prilika da će građevina konačno biti završena. Za završetak tržnog centra, prema proceni u „Marku Oreškoviću“, potrebno je uložiti oko 600.000 evra. Objekat je i dalje isplativ, jer je pre gradnje otkupljeno svega 800, od ukupno 3.300 metara predviđenog stambenog i poslovnog prostora. Za sada se u ovoj firmi razmatraju tri varijante rešavanja problema.
- Za celo preduzeće „Marko Orešković“ zainteresovana je jedna ozbiljna firma iz Novog Sada koja se bavi građevinarstvom, ali pod uslovom da se i tržni centar nađe u toj kupovini. To je za našu firmu najpovoljnija varijanta. Druga je varijanta da se izuzme i proda sam objekat čija bi cena bila oko 190.000 evra, s tim da kupac izvrši sve obaveze prema onima koji su već uzeli poslovni prostor i stanove. Treća varijanta je već bila u opticaju i gotovo je izvesna. Po njoj, dosadašnji kupci poslovnog prostora do Glavne ulice spremni su da za taj deo zajednički plate procenjenih 39.000 evra, završe gradnju, i prostor u tom delu koji nije još prodat prodaju - kaže Ljubiša Narančić, direktor Građevinskog preduzeća „Marko Orešković“.
Kupci poslovnog prostora do uličnog dela, njih 25, i tri kupca stanova ukupno zauzimaju jednu četvrtinu celog objekta, i ostaje im mogućnost da uloženo u završetak uličnog dela nadoknade prodajom jednog većeg i dva manja poslovna prostora, kao i šest stanova koje firma nije ranije prodala, navode u „Marku Oreškoviću“. S druge strane, onaj ko bi kupio ceo tržni centra za procenjenih 190.000 evra morao bi da ispuni obaveze prema kupcima 800 kvadrata, koliko je kupljeno poslovnog prostora i stanova, ali bi za uzvrat na raspolaganju ostalo preko 2.000 kvadrata u centru grada, što bi po prosečnoj ceni od 500 evra za kvadrat moglo da donese novom investitoru milion evra.
- To znači da bi investitor završetka objekta uloženo mogao da vrati i još zaradi - smatra Narančić.
Podsetimo, izgradnja tržnog centra počela je pre 16 godina. Trebalo je da se izgradi 28 stanova i 37 lokala. Kako tržni centar zauzima najatraktivniju lokaciju u gradu, nakon potpune rekonstrukcije Glavne ulice ovaj objekat je ponovo u žiži interesovanja.
- Trošna kuća koja se delom nalazila na lokaciji započete gradnje tržnog centra preneta je odlukom Skupštine opštine devedesetih godina u vlasništvo našeg preduzeća. Suvlasnik kuće je smatrao da je oštećen i pokrenuo je sudski postupak, zbog kojeg smo bili prinuđeni da jedno vreme obustavimo gradnju, a zatim i potpuno prekinemo - objašnjava Narančić zašto se prekinulo s gradnjom.
Kada se spor oko građevine posle nekoliko godina rešio sudskim poravnanjem, obezbeđena i građevinska dozvola za dalju gradnju, sve je zaustavljeno jer preduzeće „Marko Orešković“ više nije imalo para.

Impozantna imovina
Na dve aukcije nije bilo zainteresovanih za kupovinu Građevinske firme „Marko Orešković“ ponajviše zbog potraživanja 101 radnika.
- Problem obaveza prema radnicima je rešen dobijanjem otpremnine preko Ministarstva za rad kao viška zaposlenih za 92 radnika, tako da u firmi ostaje svega 11 radnika. Imovina firme je više nego velika. U industrijskoj zoni je hala od 6.000 kvadrata, firma raspolaže sa osam hektara građevinskog zemljišta, 500 kvadrata u Upravnoj zgradi u centru, u Ulici Svetog Save, skupom betonjerkom. Cena prve aukcije sa 41 milion dinara je na drugoj spuštena na 28 miliona dinara - kaže Narančić, u uverenju da će se na trećoj aukcijskoj prodaji naći ozbiljan kupac.
__________________
Ko je jutros imao sreće da se probudi u Beogradu može smatrati da je za danas dovoljno postigao u životu. Svako insistiranje na još nečemu, bilo bi neskromno
Duško Radović
Luka no está en línea   Reply With Quote
Old August 18th, 2008, 06:18 PM   #4
Dejannn
Registered User
 
Join Date: Aug 2008
Posts: 1
Likes (Received): 0

Kać/Каћ - Vojvodina/Аутономна Покрајина Војводина

Zdravo, first of all I hope some of you speak English here, my Serbian is not quite good. Ali učim srpski

I am opening this thread because I hope to get some help. A good friend of mine is Serbian, he is from Kać/Каћ. I asked how the place looked like, he said it was near Novi Sad/Нови Сад and if I would search the internet I would find pictures and info for sure. Well, not ... it seems to be a pretty small place and all the sites I found are in the cyrillic alphabet.

So far this is the only thing I found:



And here a map of the exact location of the city:



I already searched the forums here a few times, first of all the search option is not working quite good and besides that I did not find what I was looking for.

So all what was left to do was start a thread like this. Are there people here who have made pictures of places/buildings/highways in Kać/Каћ? Or maybe just able to tell me something about the city, is it a place with much agriculture or just a 'suburb' near Novi Sad ideal for commuters who don't want live in the big city? I would love to more about the Kać/Каћ, to bad there are so little pictures on the internet.

Thanks in forward
Dejannn no está en línea   Reply With Quote
Old August 18th, 2008, 11:41 PM   #5
Mali
Siniša Mali
 
Mali's Avatar
 
Join Date: Dec 2005
Location: Key West-Jerusalem
Posts: 1,363
Likes (Received): 37

There is a thread dedicated to AP Vojvodina, I think it's named Indjija and Vojvodina (should be changed IMO). So this thread can go there.
__________________
Conquered, we conquer.

République du Mali

Republic of Mali
Un peuple, un but, une foi.
Mali no está en línea   Reply With Quote
Old December 17th, 2009, 12:14 AM   #6
raqn
optimista
 
raqn's Avatar
 
Join Date: Aug 2007
Location: Beograd, Sombor
Posts: 1,301
Likes (Received): 0

Veliki bački kanal će prodisati?

Sledeće godine u prečišćavanje otpadnih voda iz Velikog bačkog kanala biće uloženo 13 miliona evra od EU i četiri miliona evra iz NIP-a - najavio je u sredu ministar ekonomije i regionalnog razvoja Mlađan Dinkić.
Veliki bački kanal je trenutno najzagađeniji vodotok u Evropi, i to zahvaljujući ispuštanju otpadnih voda na potezu od Crvenke do Vrbasa. Dubina kanala u Vrbasu je svega 30 centimetara, zbog čega je plovidba ovom relacijom nemoguća do i od Sombora. Procene „Srbijavoda” su da u kanalu ima 17,6 miliona kubnih metara nagomilanopg mulja! Vlada Norveške 2003. godine donirala je sredstva za čišćenje kanala, ali ona nisu iskorišćena i na kraju su povučena. Direktor „Voda Vojvodine” Atila Salvai je početkom novembra za „Blic” izjavio da ukupna investicija u čišćenje Velikog bačkog kanala iznosi 45 miliona evra, od čega je dva miliona evra obezbedila Holandija, a 18,5 miliona evra koriste iz investicionih fondova. Vlada Norveške odobrila je 11 miliona norveških kruna (1,5 miliona evra) samo za izradu projekta revitalizacije Velikog bačkog kanala i pripreme uvođenja savremenog postrojenja za obradu otpadnih voda za gradove i industriju na lokaciji Vrbasa i Kule. Sredstva koja je ministar Dinkić najavio potiču iz drugog programa razvoja lokalne infrastrukture vrednog 55 miliona evra, koji finansiraju Evropska unija i NIP (45+10 miliona evra).Početak realizacije ovog programa očekuje se krajem januara 2010. godine.


http://www.soinfo.org/viewtopic.php?...&start=0#31460

Bio bi red da ga više dovedu u red.
raqn no está en línea   Reply With Quote
Old December 17th, 2009, 08:37 PM   #7
makimax
ravangrad forever
 
makimax's Avatar
 
Join Date: Jan 2008
Location: Sombor
Posts: 4,677

Zanimljivo je da se mi u Somboru kupamo u tom kanalu,poplocavamo setaliste uz njega i razvijamo kafice,kafane i restorane + brdo vikendica koje postoje na obali.Ja ga obozavam.
A par desetina km dalje nizvodno kada kanal prodje pored par fabrika u Crvenki,Kuli i Vrbasu on padne
na 30 cm dubine .U Kuli recimo kada sam zadnji put bio pored njega cinilo mi se da mogu da ga pretrcim a da ne potonem,toliko je ''voda'' gusta.
makimax no está en línea   Reply With Quote
Old December 17th, 2009, 08:57 PM   #8
raqn
optimista
 
raqn's Avatar
 
Join Date: Aug 2007
Location: Beograd, Sombor
Posts: 1,301
Likes (Received): 0

A da ne spominjemo koliko smrdi leti u Vrbasu. Jadni ti ljudi što žive pored.
raqn no está en línea   Reply With Quote
Old January 9th, 2010, 02:50 PM   #9
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

Nesto vec zavrseno...

OSNOVNA ŠKOLA STARA PAZOVA – MALA BOSNA

Godina, površina: 2007, površine preko 3.000m2
Opis poslova: Stručno-tehnički nadzor nad izgradnjom, sve faze
Vrednost posla: oko 2.100.000,00€
Investitor: Ministarstvo prosvete i sporta Republike Srbije, Beograd, Nemanjina 22-26
Program poboljšanja stanja škola

Pocetak izgradnje.



Izgradnja u toku.



Konacan izgled.

__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old January 10th, 2010, 02:22 AM   #10
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

PEŠAČKA ZONA APATIN

Mesto: Apatin, Srbija
Investitor: Opština Apatin i JP Apatin
Površina: oko 32.000m2
Godina: 2002.-2008.
Autor: Prof. Predrag Cagić, dipl.inž.arh. i Milorad Ćirić, dipl.inž.arh.















__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old January 12th, 2010, 02:15 AM   #11
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

Quote:
Originally Posted by marillion View Post
haha! šta misliš, ko je otvorio tu temu?
Pretpostavio sam.

Quote:
11. 01. 2010.| 11:33
Novi objekti za boravak sportista u Kikindi - u toku rekonstrukcija nekadašnjeg omladinskog naselja




Rekonstrukcija nekadašnjeg omladinskog naselja koje pripada Sportskom centru "Jezero" u Kikindi je u toku. U radove je uloženo svega 150.000 dinara, a objekti su namenjeni za boravak sportista koji dođu u taj grad, ali i za turiste, navedeno je na sajtu opštine Kikinda.

Kako je rekao direktor "Jezera" Milovan Ranđić, poslovi su pri kraju, a obavljaju ih radnici Sportskog centra.

- Planiramo da se tokom sledeće godine posvetimo i turizmu. Moći ćemo da ugostimo ekupu od 20 članova, koliko je uobičajeno u sportu. Nameravamo da pristupačnim cenama i uz dobru uslugu privučemo goste, ne samo sportiste - rekao je Ranđić i dodao da Sportski centar "Jezero" u rekonstrukciju ulaže sopstvena sredstva.

Objekti su, inače, od fasadne cigle i biće osposobljeno 10 soba sa po dva ležaja, kupartilima, odnosno tuš kabinama.

Renovirano omladinsko naselje u okviru Sportskog centra "Jezero" leti će poslužiti kao motel, što će dobro doći posetiocima koji bi pored sportskih terena i drugih sadržaja, imali i obezbeđenu ishranu i sobe za boravak.
Ekapija
__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old February 11th, 2010, 12:08 AM   #12
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

DUOCHEM – NOVA PAZOVA

__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old February 11th, 2010, 12:17 AM   #13
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

SOL GROUP

Delta Inženjering je za potrebe velike italijanske grupacije Sol group uradio kompletnu projektno-tehničku dokumentaciju I bio je glavni izvodjač radova u Distributivnom centru gasova u Novoj Pazovi,gde se vrši punjenje,skladištenje I distribucija boca sa tehničkim gasovima.

__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old April 22nd, 2010, 07:20 PM   #14
Brate82
Registered User
 
Brate82's Avatar
 
Join Date: Feb 2010
Posts: 24
Likes (Received): 0

Стара Пазова - Аутодром Stara Pazova - Autodrome

F1 stiže u Staru Pazovu
Quote:
B. B. MIJIĆ, 19.04.2010 20:55:23
http://www.novosti.rs
Pazova bi uskoro mogla da postane najsportskija opština Srbije. Posle uveliko odmakle gradnje nacionalne kuće fudbala, sada želi i da izgradi pistu po standardima Formule 1 na kojoj bi se nadmetala najveća imena sveta u automobilizmu i motociklizmu. Partner „Stefan-GP“, korporacija koja je pokušala ove godine da uđe sa svojim bolidom u takmičenje najbržeg cirkusa, kako saznajemo, spreman je da u ceo projekat uloži 20 miliona evra. Najverovatnije, lokacija buduće staze Formule 1 bila bi kraj puta Stara Pazova - Golubinci.
- Investitoru nudimo sigurno najpovoljnije uslove kada je u pitanju lokacija, uz maksimalno ubrzanje dobijanja svih neophodnih dozvola za gradnju koje su u nadležnosti lokalne samouprave - obećava Goran Jović, predsednik opštine, uveren u brzi početak realizacije same gradnje. - Jedan takav sportski objekat mnogo bi značio za promociju Srbije i opštine Stara Pazova, ne samo u Evropi, već i u svetu.
Projekat izgradnje piste po standardima Formule 1 u Staroj Pazovi biće obelodanjen u četvrtak. Kako „Novosti“ saznaju, projektom buduće staze i pratećih objekata obuhvaćena je površina od nekoliko desetina hektara zemljišta. Sama staza za trke duga je tri i po kilometra, a s tribina će trke moći da posmatra više od 20.000 gledalaca. Investitoru su ponuđene tri lokacije. Kao najizglednija jeste trasa uz regionalni put Stara Pazova - Golubinci, gde već ima izgrađene neophodne infrastrukture. Gradnja bi trajala dve godine, uz ulaganja od 20 miliona evra.

DOBAR POSAO
Pored piste, ono što je za nas daleko važnije, gradiće se i mnogi drugi objekti u okviru Tehnološkog parka - otkriva Jović. - Pošto investitor namerava u Srbiji da testira i proizvodi delove, ali i kompletne trkačke automobile, to znači zapošljavanje koje nam je tako neophodno.


Staza za Auto Trke Stara Pazova (osnovni podaci)
Dužina staze 3,538.57 metara
Dužina klupske staze 2,542.66 metara
Dužina startnog pravca 807.21 metara
Širina staze na startu 15.00 metara
Širina staze na preostalim delovima 12.00 metara
Broj pravaca 5
Broj krivina 16
Levih krivina 5
Desnih krivina 11
Pravaca 5
http://www.sportal.rs/news.php?id=25880

Last edited by Brate82; April 22nd, 2010 at 07:31 PM.
Brate82 no está en línea   Reply With Quote
Old June 21st, 2010, 08:59 PM   #15
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

Quote:
21. 06. 2010.| 13:37
Novi trg u Beočinu napravljen od posebne vrste betona - otvaranje 22. juna



Građani Beočina moći će od sutra (22. jun 2010. godine) da se okupljaju, druže i uživaju u mnogobrojnim kulturnim i zabavnim sadržajima na novom trgu.

Novi trg u Beočinu izgrađen je od posebne vrste betona Artevia, prvi put korišćenog u našoj zemlji. Svečanom otvaranju prisustvovaće generalni direktor kompanije "Lafarge" Kostin Bork (Costin Borc), predsednik Vlade Vojvodine Bojan Pajtić i predsednik opštine Beočin Bogdan Cvejić.

Projekat izgradnje centralnog trga, vredan 270.000 EUR, realizovan je u saradnji sa opštinom Beočin i primer je održive gradnje, u kojem su učestvovale brojne lokalne firme i jedna iz Rumunije.

Ovaj projekat započet je prošle godine, kada je raspisan konkurs za idejno rešenje, na koji je pristiglo 48 radova mladih arhitekata. Autori idejnog rešenja su bračni par Jelena i Srđan Tomić iz Aranđelovca koji su za ovaj projekat nagrađeni sa 150 hiljada dinara.
Ekapija
__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old July 7th, 2010, 11:41 AM   #16
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

Quote:
06. 07. 2010.| 14:32
Non-stop uživanje u vodenim atrakcijama - Aqua park u Bačkom Petrovcu imaće 15 bazena, marinu, letnju pozornicu, sportske terene



Izgradnja jednog od najvećih i najsavremenijih aqua parkova u Evropi, koji će raditi cele godine 24 sata dnevno, počeće ove godine na prostoru gde se Mali bački kanal uliva u Veliki bački kanal. Ova nesvakidašnja vodena atrakcija, vredna 21 mil EUR, prostiraće se na 20 hektara u Bačkom Petrovcu.

- Aqua park u Bačkom Petrovcu izdvajaće nasavremenija tehnologija. Planiramo izgradnju 15 otvorenih i zatvorenih bazena, veliki broj tobogana, divlje reke, jezera sa morskom vodom, jezero na čijem središtu će biti letnja pozornica za razne manifestacije – opisuje sadržaj budućeg aqua parka Jan Brtka, direktor firme "L&B Park", ćerke firme "Aqua Terming Invest", koja je investitor aqua parka.

U okviru kompleksa biće izgrađena biciklistička staza, tereni za mini golf, tenis, košarku, rukomet, fudbal što će omogućiti pripreme sportista za takmičenja.

- Planiramo da u blizini ulaza u aqua park sagradimo hotel sa 100 ležajeva. Želeli bismo da to bude hotel sa pet zvezdica, a imamo mogućnosti za to jer ispunjavamo i uslov da smo na 100 kilometara udaljeni od aerodroma – kaže Brtka.

U budući aqua park moćiće da se dođe brodom jer, kako kaže naš sagovornik, u planu je izgradnja i marine. U ovom kompleksu mesto će naći i pecaroši jer je jedan deo parka predviđen i za sportski ribolov.



Direktor "L&B Park" očekuje da će ovu turističku atrakciju otvoriti do kraja 2013. godine. U poslednjoj fazi izgradnje biće otvoreno i banjsko lečilište.

- Mi smo spremni da krenemo već sutra sa izgradnjom, ali čekamo sve potrebne papire, a ta procedura može potrajati. Geodetsko snimanje smo uradili. Raspisali smo tender za bušotinu termalne vode. Temperatura vode je 46 stepeni Celzijusa što je dovoljno za potrebe aqua parka - kaže Brtka.

U opštini Bački Petrovac kažu da su doneli odluku o izradi planu detaljne regulacije i da očekuju da će ubrzo završiti izdavanje dozvola za izgradnju aqua parka.

Kako je ranije najavljivano, u startu će biti zaposleno 100 radnika, a kasnije i do 500, a osim toga otvoriće se mogućnost za mnoge preduzetničke inicijative.

Slovačko preduzeće "Aqua Terming Invest" već je izgradilo dva aqua parka u Evropi i projektovalo aqua park u Bačkom Petrovcu.

S.O.
Ekapija
__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old July 19th, 2010, 02:16 PM   #17
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

Quote:
19. 07. 2010.| 09:10
Počinje rekonstrukcija zgrade Skupštine opštine Kikinde

(Kikinda)

Rekonstrukcija zgrade Skupštine opštine Kikinda trebalo bi počne uskoro, objavljeno je na sajtu te opštine. Prvom fazom radova predviđena je opravka krova i dela zgrade do oluka, što je u najlošijem stanju, a kasnije će biti urađena izolacija građevine i fasada. Kako je rekao načelnik Opštinske uprave Branko Ljuboja, ukupna vrednost posla koji je, nakon javne nabavke, poveren kikindskoj građevinskoj firmi "Pemir", iznosi 14 miliona dinara.

Deo novca, tri miliona dinara, dobijen je nakon konkursa, iz fonda igara na sreću od Ministarstva za upravu i lokalnu samoupravu Republike Srbije, a deo obezbeđuje lokalna samouprava.

Zgrada Skupštine opštine jedna je od najreprezentativnijih građevina u Kikindi. Podignuta je 1894. godine. Odavno nije obnavljana, te je krov prošle godine počeo da prokišnjava, što je ozbiljno oštetilo njenu unutrašnjost.

Pre godinu dana na ulaz je postavljena skela kako bi prolaznici bili zaštićeni od eventualnog pada crepa ili komada maltera. Skela, inače, ne košta lokalnu samoupravu ni dinara, navedeno je na sajtu.

Važno je napomenuti da je za rekonstrukciju zgrade dobijena saglasnost Međuopštinskog zavoda za zaštitu spomenika kulture u Subotici. Imanovan je i nadzorni organ u kojem je i predstavnik pomenute ustanove u Subotici.

U skladu sa propisima predviđenim Zakonom o planiranju i izgradnji, u toku je prikupljanje dokumentacije o prijavi radova.
Ekapija
__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old July 19th, 2010, 03:26 PM   #18
makimax
ravangrad forever
 
makimax's Avatar
 
Join Date: Jan 2008
Location: Sombor
Posts: 4,677

Kada bi sve zgrade skupstina vojvodjanskih gradova kao i ''gradskih kuca'' stavili na jednom mestu,to bi bio najlepsi grad na kugli zemaljskoj .
makimax no está en línea   Reply With Quote
Old September 2nd, 2010, 08:23 PM   #19
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

Quote:
02. 09. 2010.| 14:00
"Gorenje" do kraja godine gradi još jednu fabriku u Staroj Pazovi - Uz investiciju od 11,5 mil EUR i šansa za 250 radnika

("Gorenje studio", Stara Pazova)

Slovenačka kompanija "Gorenje" izgradiće do kraja godine novu fabriku u Staroj Pazovi u kojoj će biti zaposleno 250 novih radnika.

Ugovor o izgradnji fabrike čija je vrednost 11,5 mil EUR, potpisali su danas ministar ekonomije Mlađan Dinkić i član Upravnog odbora "Gorenja" Branko Apat.

Kompanija "Gorenje" poseduje dve fabrike u Srbiji, u Valjevu gde proizvodi belu tehniku i u Staroj Pazovi gde proizvodi radijatore i bojlere.

Dinkić je kazao da kompanija "Gorenje" trenutno u Srbiji zapošljava 500 radnika i da ima plan da do kraja ove godine uposli još toliko ljudi, navodi se u saopštenju Ministarstva ekonomije.

On je rekao da će nova fabrika u Staroj Pazovi biti završena do kraja ove godine i da će proizvodnja krenuti u januaru 2011. godine.

- "Gorenje" izvozi robu u vrednosti od oko 50 mil EUR, a verujem da će taj iznos u narednih godinu-dve dana premašiti 100 mil EUR. Srbija zahvaljujući ovakvim kompanijama u prvih sedam meseci ove godine ima rast izvoza od čak 20% - rekao je Dinkić.

On je kazao da je Vlada podržala otvaranje svakog novog radnog mesta u toj kompaniji sa po 4.000 EUR. Do sada je ukupno dodeljeno 1 mil EUR.
Ekapija
__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote
Old September 12th, 2010, 01:41 AM   #20
vlada_Ilina_h2o
highways and roads
 
vlada_Ilina_h2o's Avatar
 
Join Date: Feb 2009
Location: Kragujevac, Serbia
Posts: 12,971

Quote:
11. 09. 2010.| 16:38
Hotel, bazeni, saune, fitnes i odmor na 24.000 m2 - Novo Miloševo dobija velnes i spa centar vredan oko 42 mil EUR

(Dvorac "Karačonji")

Novo Miloševo moglo bi uskoro da postane vojvođanska prestonica spa i velnes odmora. Ako sve bude teklo po planu nosilaca državne i lokalne vlasti, novobečejska mesna zajednica dobiće najsavremeniju termalnu banju, mnoge sadržaje po ugledu na slične svetske centre, a dvorac koji se nalazi u sredini kompleksa zasijaće novim sjajem.

Projekat formiranja turističke zone i izgradnje modernog velnes spa centra krenuo je od početne ideje da se iskoriste postojeći prirodni resursi i izgradi termalna banja u Novom Miloševu. Projektni tim je formulisao misiju razvoja buduće turističke destinacije i osnovano je preduzeće "Vojvodina Spa" d.o.o. kojem je povereno sprovođenje svih potrebnih aktivnosti za realizaciju projekta.

Hotel, bazeni, saune...

Kako je u razgovoru za "eKapiju" naveo direktor preduzeća "Vojvodina Spa", Đorđe Popov, planirana je izgradnja wellness i spa centra površine 24.000 m2, za dnevne goste kapaciteta 600-800 posetilaca dnevno. On bi sadržao otvoreni i zatvoreni bazen sa termalnom vodom temperature od 36 stepeni, zatim sauna centar, fitnes centar, mesta za odmor kao i poseban deo namenjen deci. Dnevna ulaznica u ovaj centar i korišćenje svih njegovih sadržaja bila bi oko 12 EUR u dinarskoj protivvrednosti. Doplaćivalo bi se jedino korišćenje sauna centra, u visini od oko 5 EUR.



Osim ovoga planirana je i izgradnja parkinga na 2ha, dok je površina od još 3 ha predviđena za zelenilo, fontane, mobilijer i slično.

Po uzoru na nekoliko sličnih centara u Austriji, predviđena je i izgradnja smeštajnih kapaciteta, kako bi gosti koji Novo Miloševo i Vojvodinu zavole na prvi pogled, mogli duže da uživaju u predviđenim sadržajima. Stoga je u planu izgradnja hotela sa četiri zvezdice sa 120 soba. Organizaciono, to bi uglavnom bile dvokrevetne sobe i studia. Osim restorana, hotel će imati i "beauty" centar (frizerski, kozmetički salon), centar za masaže..

Ovakav sadržaj graditeljima daje nadu da bi godišnje kroz ovaj centar moglo da prođe oko 300.000 gostiju.

Ali, to nije sve...

Osim termalne vode, razlog zašto je "Strategija razvoja turizma Republike Srbije" dala najviši prioritet podizanju spa destinacija u Vojvodini i pri tome je prepoznala i Novo Miloševo kao idealno za to, je i dvorac Karačonji.

(nekadašnji izgled dvorca)

Ovdašnju najvažniju turističku atrakciju, istorijski dvorac "Karačonji" izgradio je grof Lajoš Karačonji 1857. godine, kao rezidencijalno zdanje klasicističkog stila. Danas su dvorac i park u njegovom njegovom okruženju u lošem stanju i zahtevaju program obimne restauracije kako bi mogli da se koriste. Staro skladište preko puta dvorca već je renovirano i pretvoreno u Etnografski muzej.

Dvorac se prostire na površini od 2.500 m2. Prva ideja je bila da se velnes centar smesti u njega, ali se od nje ubrzo odustalo jer je to suviše mala površina za sve ono što se želi postići.

Umesto toga, dvorac će biti rekonstruisan i nalaziće se u neposrednoj blizini centra. Namena dvorca je od izgradnje često menjana, a danas se u njemu nalaze prostorije preduzeća "Vojvodina spa". Da je reč o nesvakidašnjem projektu u Srbiji, treba napomenuti da je prenamenom dvorca koji se nalazi na listi zaštićenih kulturnih dobara, u njemu planirana izgradnja nekoliko luksuznih apartmana sa pet zvezdica, ekskluzivni butici, kongresni centar, kazino…

Reklo bi se da će to biti grad u malom. Popov nije mogao d precizira koliko će novca biti potrebno za rekonstrukciju dvorca, jer će se ta procena biti urađena nakon što Zavod za zaštitu spomenika završi projekat spoljne rekonstrukcije dvorca.

Investitori, projekti i planovi




deja o osnivanju velnes i spa centra potekla je još 2006. godine. Nakon što je 2008. Ministarstvo ekonomije raspisalo tender na kome je austrijska kompanija "Oberer Consulting" izabrana da izradi "Master plan turističke destinacije Novo Milloševo", napravljen je novi pomak. Taj master plan, čiju izradu je sa oko 12 miliona dinara finansiralo Ministarstvo, usvojen je u oktobru 2009, a tri meseca posle osnovano je preduzeće "Vojvodina spa", koje će nadgledati ceo projekat.

Javnim tenderom u avgustu ove godine "Oberer Consulting" je izabran i za konsultanta na ovom projektu. Kako Popov navodi za "eKapiju", u narednih 6 meseci "Vojvodina Spa" I "Oberer Consulting će uraditi koncept subvencija, arhitektonski predkoncept I biznis plan. A nakon toga biće raspisan i tender za izbor strateških partnera.

Procena je da je za izgradnju svega gore navedenog potrebno oko 42 mil EUR. Kako je planirano finansiranje kroz javno-privatno partnerstvo, planirano je da najviše do 20% sredstava dođe iz javnih prihoda dok bi finansijsku konstrukciju zatvorio potencijalni investitor.

Spa centar - pomodarstvo ili potreba?



Budući da se sve više govori o izgradnji spa centara, masažama, zdravoj ishrani i sličnim temama, mnogi su skloni da se zapitaju da li je sve to posatlo modni trend ili stvarna potreba.

Popularnost spa tretmana neprestano raste sve više kako ljudi pronalaze sebe u opuštanju u dnevnim spa ritualima, masaži i zdravlju. Spa danas cilja da postavi novi, zdraviji životni stil svojim klijentima po pravilima zdrave ishrane, edukaciji o zdravim navikama, fitnesom, tematskim radionicama i tome slično.

Transformacija životnog stila može se sprovesti uz pomoć složenih programa koji uključuju spa servise, bavljenje fizičkim fitnesom, edukacijom o velnesu i pravilnom ishranom. Znači, ljudi prihvataju spa ne zbog toga što to postaje moderno i statusni simbol, već zbog mnogobrojnih koristi po zdravlje koje nudi. Spa postaje sastavni deo u životu ljudi, zaključuje se na Internet prezentaciji kompanije "Vojvodina Spa".

J.Đ.
Ekapija
__________________
.
.
.

>>>City of Kragujevac - some projects<<<
vlada_Ilina_h2o no está en línea   Reply With Quote


Reply

Tags
Войводина, Војводина, Србија, development, economy, serbia, srbija, vajdaság, vesti, voivodina, vojvodina

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 03:06 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu