Old June 19th, 2014, 11:39 AM   #1421
auzdafluff
Registered User
 
Join Date: Feb 2010
Posts: 755
Likes (Received): 99

Quote:
Originally Posted by chefdude View Post
It's difficult to take this crowd seriously. 1. Ramadan starts in 10 days 2. Summer working regulations are in place meaning no outdoor work to take place between 12:30 and 15:00 If you want to push on with construction why wait several months until the worst and shortest day working conditions are in effect?
Oh it's easy to take this lot seriously. It's painfully obvious what they're up to. As you said, Ramadan starts in ten days and summer working regs are in force. That gives them a legitimate excuse for not being able to carry out the work, but gives them the ability to say they worked on the project for more than two months before shutting it down again. They're obviously trying to game the system and reset the clock on how soon RERA can kick these cowboys off the site and hand it over to someone who will finish it.

Last edited by Face81; June 21st, 2014 at 11:32 AM.
auzdafluff no está en línea   Reply With Quote

Sponsored Links
 
Old June 20th, 2014, 01:36 PM   #1422
Brain storming
Registered User
 
Join Date: Mar 2010
Posts: 46
Likes (Received): 1

As I here from them, RERA instruct that any conflict between alsaqran and almasah should not hold the construction and it should be resolved separately. Hopefullyconstruction will not stop again.
Brain storming no está en línea   Reply With Quote
Old June 21st, 2014, 04:18 PM   #1423
JVT Victim
Registered User
 
Join Date: Nov 2010
Posts: 5
Likes (Received): 3

I visited the site today...
No real progress at all.The slab of the 20th floor is still as it was 13 months ago and the cranes are not moving.
Few workers were doing some cleaing on the ground,that's all.
JVT Victim no está en línea   Reply With Quote
Old June 22nd, 2014, 01:37 PM   #1424
JLT + Marina
Registered User
 
Join Date: Jul 2013
Posts: 5
Likes (Received): 0

No Real construction

True, I also saw just few worker at Ground Level with no real work Actually.It can be like preparation but We cant call it Construction work in progress.

Even worst called project of JLT Wind Tower moving with Good Pace,Hope this also Start,Location of Saqran is so important & it cant be cancelled specially after 20 Floors
JLT + Marina no está en línea   Reply With Quote
Old Yesterday, 10:08 PM   #1425
Jet7
Registered User
 
Join Date: Mar 2014
Posts: 14
Likes (Received): 0

Any updates?
Jet7 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 08:16 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu