daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Continental Forums > Middle East

Middle East » Bahrain | Israel | Iran | Iraq | Jordan | Kuwait | Lebanon | Qatar | Saudi Arabia



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old June 5th, 2016, 12:03 AM   #1
vysakhmp
Registered User
 
Join Date: Mar 2016
Posts: 2
Likes (Received): 0

New Muscat International Airport

Muscat International and Salalah International Airport including three regional airports are under development and will be the new gateway to the Sultanate of Oman.
The New Salalah International will able to handle one million passengers per annum and the new Muscat International Airport will have capacity to handle 12 million passengers per annum (MPPA). Both these new airports are schedule to be completed in the coming years.
The new airports are designed as ICAO category 4F airports and shall be able to accommodate the world`s largest aircraft, the Airbus A380. The runway has been designed to enable independent parallel operation.
The passenger terminals are designed to the latest "state of the art" technology and in accordance with IATA Service Level A standards.
The total gross area for the new Muscat International terminal building is 580,000. m2 with an overall airport land area of 21 km2. Further expansions is planned for Muscat International airport in three subsequent phases, ultimately boosting the airport`s capacity to 24, 36 and 48 MPPA.
There are 10 Main Contracts (MC) delivering the new Muscat and Salalah International airport and 3 Standard Nationwide Contracts (SNC)


Muscat Passenger Terminal Building total area – 580,000 m2O
Other Airport Buildings total area - more than 30,000 m2
ATC tower height – 97 meters
96 check-in counters
29 passenger boarding bridges
30 aircraft remote stands
5,500 bags per hour baggage processing capacityTwo parallel runways, capable to serve world`s largest aircraft A380
Airside hotel ( 90 rooms capacity for 12 MPPA)


The new Muscat International Airport will have the capacity to handle 12 million passengers annually. Further expansions planned in three subsequent phases will ultimately boost the airport` capacity to 24, 36 and 48 million passengers when the demand is required.
vysakhmp no está en línea   Reply With Quote

Sponsored Links
Old June 5th, 2016, 12:06 AM   #2
vysakhmp
Registered User
 
Join Date: Mar 2016
Posts: 2
Likes (Received): 0

New Muscat International Airport Facts
DescriptionFacts
Terminal Building Capacity – Stage 112 million passengers per annum (mppa.)
Terminal Building Capacity – Stage 2 / 3 / 424 / 36 / 48 mppa.
Total Gross Terminal Building Area580,000. m²
Car Parking Capacity8,000
Air Traffic Control Tower Height97m
Existing runway length after extension4,000 x 60m
New Runway Specifications4,000 x 60m
Boarding Bridges / Contact Stands29
Bus Boarding Lounges10
Remote Aircraft Stands Stage 1 / 210 / 30
Check-In Counters86
Self service check-in kiosks20
Emigration Counters - Departures31
Immigration Counters – Arrivals56
Arrivals Carousels8 international + 2 domestic
Transfer Counters12 Counters
In-Flight Catering Capacity24,000 meals per day
Aircraft Hangar Capacity2 wide body + 4 narrow body
Airside Hotel Capacity90 rooms
vysakhmp no está en línea   Reply With Quote
Old July 8th, 2016, 07:54 PM   #3
syriapress
Registered User
 
Join Date: Jul 2016
Posts: 12
Likes (Received): 1

MUSCAT INTERNATIONAL AIRPORT, OMAN
Photo: COWI-Larsen

The Muscat International Airport development project is the largest project to ever be undertaken in the history of Oman. The design is based on an initial capacity of 12 million annual passengers. COWI-Larsen Joint Venture has been main consultant on the project.
syriapress no está en línea   Reply With Quote
Old November 28th, 2017, 07:54 PM   #4
cbeboy
Registered User
 
Join Date: Dec 2005
Posts: 1,681
Likes (Received): 123

cbeboy está en línea ahora   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:06 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu