Kolkata's airport is currently being upgraded in light of the booming air traffic in the Indian aviation. The modernization and expansion of the NSCB airport will be done by May 2011 and this will include the construction of a new terminal, extension of the second runway, taxiways amongst others.


Designed by RMJM, the new terminal will be able to handle 20 million passengers/annum which would be sufficient till 2015. Work has started on it and the terminal should open by May 2011.

Click on the renders to view large



The new terminal building will have an area of around 180,000 sq metres. 104 check-in counters, 44 immigration counters, 25 security gates, five conveyor belts and 15 aerobridges will be the other features of the airport post development.



Deep piling work for the integrated passenger terminal had begun in Nov 2008



The consultants for the modernization of this airport is a consortium of Indian firms partnering with Hong Kong’s RMJM and a Paris-based firm ADPI.






Work on nine domestic bays, three cargo bays and 11 additional parking bays has already started



Inside the new terminal:

^ The terminals landscaping and design revolves around an abstract reference to the writing of Rabindranath Tagore of Bengal. The graphic nature of his writing is visible as large scale patterns etched on to the underside of the main roof as well as landscaped across the forecourt ground.







Walkthrough video:





Terminal side render:


^Below that will lie an underground multilevel car parking facility


new ATC:



Masterplan:




^note: Phase II and III are yet to be decided


for pics, local airport news and developments visit the Kolkata Airport Update thread in the Indian subforum! For news and updates on other Indian airports, please visit the Indian Aviation and Airports subforum.
 
See less See more
1 14
#2 · (Edited)
WOW !!! Hats of too you IU - you have spent the time to do the ground work and present it most attractively in a blog. Talented for sure... Thanks for this...It's got me more interested in the goings on at the Kolkata Airport now. Love that floor roof exploded view and the cross sectional renderings...:)
 
#10 ·
#13 ·
Cross Posting from Calcutta International Airport thread in the Indian Sub Forum

From getty images:


An aircraft of an Indian airline prepares to land beside a construction site at Netagi Subhash Chandra Bose Airport in Kolkata on January 6, 2011
Nice IU. From daylife.com :cheers:



Thanks everyone. Just wanted to bring to everybody's notice, the behemoth scale of the airport. It's really huge. Check this out..

 
#14 ·
#21 ·
Cross posting from the Calcutta International Airport thread in the Indian sub forum
The under construction building on the right in the first pic is the new integrated terminal


Google Earth has again updates sections of Kolkata. This time the pictures are from Feb 22, 2011!

1


2
 
#22 ·
Cross Posting from the Indian sub forum

Singapore Airlines Cargo adds 2 new destinations


MANILA, Philippines – Singapore Airlines Cargo has added two destinations to its Asian network using Boeing 747 freighters.

The airline resumed Boeing 747-400 freighter operations to Kolkata in India after a two-year hiatus, and started serving a new destination, Penang in Malaysia.

The new freighter capacity will complement the ‘bellyhold’ space available from Singapore Airlines’ daily passenger services between Singapore and Kolkata. (EHL)
 
#24 ·
Integrated terminal update. 70% construction work completed. Expected completion by mid 2012. here are some photographs of the terminal under construction taken by forum member Juggernaut


 
#25 ·
Cross posting from the Kolkata Airport forum in SSC-India sub forum

All images CC: Juggernaut


Hi SSCIans Pics from my flight back from India will be uploaded soon. I have been meaning to upload them for the last few weeks but have been very busy since arriving back in the US. The pics might not be very clear it was an exceptionally rainy day. But I managed a good few shots of the "connecting" building and the terminal. Also the pics are a few weeks old so the real progress might be substantially different.
____
Juggernaut
Something is coming up in the gap.

P1040157 by BjtJaggernaut, on Flickr
Approach road approaching(sic!) its completion.

P1040162 by BjtJaggernaut, on Flickr
The upper level approach is for departures I presume.

P1040163 by BjtJaggernaut, on Flickr
The "gap", with part of the old domestic building.

P1040170 by BjtJaggernaut, on Flickr
Clearer picture of the departure approach ramp.

P1040166 by BjtJaggernaut, on Flickr
The "gap", with part of the old domestic building.

P1040170 by BjtJaggernaut, on Flickr
Airport air side facade under construction.

P1040173 by BjtJaggernaut, on Flickr
 