search the site
 daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Romania & Moldova > Development Forums > North–West Region > Oradea Metro Area



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools Rating: Thread Rating: 6 votes, 5.00 average.
Old August 31st, 2013, 05:24 PM   #1
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

ORADEA | Infrastructure & Transport

CENTURA MUNICIPIULUI ORADEA.
August 2013.



Centura existenta (profil 2X2).
Lucrari planificate:
1. Largire subtraversare CF M300 (de la 1X1 la 2X2 benzi);
2. Reabilitare Pod Densusianu (sens Rogerius-Iosia);
3. Supratraversare Calea Aradului;
4. Subtraversare strada Nojoridului.
5. Subtraversare strada Ciheiului.
6. Supratraversare strada Nufarului;
Actualul drum de centura (profil 1X1), care va deveni artera secundara.
In constructie - Viitoarea prelungire a soselei de centura si supratraversarea liniei CF M300, intre CET 2 si Calea Clujului (profil 2X2).

Last edited by status; August 31st, 2013 at 10:09 PM.
status no está en línea   Reply With Quote

Sponsored Links
Old August 31st, 2013, 05:39 PM   #2
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

DJ 792A, Les-Tinca-Beliu-Bocsig.
S-au reinceput lucrarile de reabilitare.
Imagini de azi (intre Miersig si Husasau de Tinca).



status no está en línea   Reply With Quote
Old August 31st, 2013, 06:12 PM   #3
adi.c
Curious User
 
adi.c's Avatar
 
Join Date: Jul 2008
Location: Oradea - Florence
Posts: 1,104
Likes (Received): 2098

Legat de centura existenta si extinderea ei:

Prelungirea centurii inspre autostrada A3, si inspre centura Osorheiului



Cu rosu, proiectele de pasaje, strazi noi, largiri a strazilor existente, poduri, etc:



Inca o imagine cu propunerea de extindere a centurii:

__________________
www.facebook.com/cornea.work
www.whitegekko.com

status liked this post
adi.c no está en línea   Reply With Quote
Old August 31st, 2013, 06:27 PM   #4
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

Modernizare DJ 108 I, Intre Bratca si Bulz (~5 km).



Sursa: www.forumtrenuri.com/foto by Caravelle_Zg






Last edited by status; August 31st, 2013 at 06:39 PM.
status no está en línea   Reply With Quote
Old August 31st, 2013, 06:30 PM   #5
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346





status no está en línea   Reply With Quote
Old September 6th, 2013, 08:24 PM   #6
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

DJ 792A, update, 04.09.

__________________

butuc_88 liked this post
status no está en línea   Reply With Quote
Old September 11th, 2013, 12:01 AM   #7
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

Primăria pregătește modernizarea unor noi străzi.

În cadrul ședinței de Consiliu Local de azi a fost supus supus aprobării proiectul privind modernizarea str.Făgărașului - tronsonul cuprins între intersecția cu str. Țepeș Vodă și intersecția cu sr. Beiușului, dar și proiectul privind modernizarea străzii Rapsodiei.

Modernizarea str. Rapsodiei este de asemenea o necesitate, deoarece aceasta este breteaua de legătură a str. Nojoridului cu pasajul subteran care se va construi peste drumul de centură.

Am doua nelamuriri:
1. Deci, cum naiba este pasajul subteran care va fi construit peste centura?
2. Care este strada Rapsodiei?
status no está en línea   Reply With Quote
Old September 11th, 2013, 12:58 AM   #8
butuc_88
Butuc
 
Join Date: Jun 2011
Location: strain si calator
Posts: 3,524
Likes (Received): 3236

2. nu apare pe maps.google. - s-ar putea sa fie o legatura intre (thuzo sandor)- str.nojoridului si str.apateului.(west market)
1. pasajul subteran peste centura supraterana - greseala de exprimare, eu pp ca e vorba de pasajul primariei, cel cu tuburi, deci subteran, nu cel suprateran al cnadnr peste giratii - pt ca suma e tot 100k ron, ca si pt str.Fagarasului - deci cca.600m de strada doar.

poate ne ajuta danla cu inside info. heh
__________________
nihil sine Deo.

status liked this post

Last edited by butuc_88; September 11th, 2013 at 01:15 AM.
butuc_88 no está en línea   Reply With Quote
Old September 11th, 2013, 10:46 AM   #9
danla
Registered User
 
danla's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 1,275
Likes (Received): 2872

Pasaje supraterane peste centura

Asa este. Greseala de exprimare.

Cele doua pasaje, din zona strazii Ciheiului si cel din zona strazii Nojoridului, sunt supraterane peste drumul de centura.

Strada Rapsodiei, denumire acordata in primavara acestui an,face legatura dintre strada Thuzo Sandor si strada Nojoridului.

Modernizarea strazii face parte din obligatia Primariei de a construi. din surse financiare proprii, rampele de acces care fac legatura cu partea superioara a pasajelor precum si a jonctiunii pasajelor cu drumurile adiacente.

Finantarea pasajelor se va face prin POS-T. Momentan cele doua proiecte se afla in lista proiectelor de rezerva, 2007-2013.
__________________

status, butuc_88 liked this post
danla no está en línea   Reply With Quote
Old September 20th, 2013, 01:04 PM   #10
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

Pista internaţională: Au început lucrările la pista de biciclete Oradea - Berettyoujfalu.

După patru ani în care autorităţile au tot povestit despre pista transfrontalieră dintre Oradea şi Berettyoujfalu, abia săptămâna trecută bicicliştii au ajuns să îi creadă cu adevărat. Firma contractată de Primăria Oradea, Drumuri Orăşeneşti, a început decopertarea asfaltului pe porţiunea din Şoseaua Borşului care se va transforma în pistă. Lucrările au termen de finalizare 15 noiembrie.


Pista transfrontalieră va fi paralelă cu drumul european 60 şi va avea, în Oradea, o lungime de 9 kilometri, iar în total 35 de kilometri. Ea va porni de la Podul Ferdinand, va coborî pe malul drept al Crişului spre Decebal, apoi, înainte de Podul Densuşianu, va intra pe strada Sovata, luând-o pe Bulevardul Dacia şi pe Şoseaua Borşului, între drumul principal şi cel uzinal, până la ieşirea din ţară. Şi ceilalţi parteneri din proiect, respectiv Primăria Borş şi partea maghiară, au început lucrările la pistă.

În urma licitaţiei pentru lucrări, Primăria a economisit 350.000 de euro, bani pe care îi va folosi pentru finanţarea unei noi piste de biciclete care să lege strada Sovata de ieşirea din municipiu către Sânmartin. Lucrările la pista lungă de 5,7 kilometri vor trebui finalizate până în aprilie 2014. În viitor, pista va continua până în Băile 1 Mai.
__________________
Status' Travels.

butuc_88 liked this post
status no está en línea   Reply With Quote
Old September 20th, 2013, 03:59 PM   #11
danla
Registered User
 
danla's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 1,275
Likes (Received): 2872

Pista Oradea - Berettyoujfalu

Cateva poze de ieri. Primele doua din Romania, inainte de Santion, urmatoarele din Ungaria. In Ungaria cateva tronsoane sunt asfaltate.







__________________

butuc_88 liked this post
danla no está en línea   Reply With Quote
Old September 24th, 2013, 10:03 PM   #12
adi.c
Curious User
 
adi.c's Avatar
 
Join Date: Jul 2008
Location: Oradea - Florence
Posts: 1,104
Likes (Received): 2098

se repară drumul în Vama Borş

se repară drumul în Vama Borş




"De câteva zile, pe sectorul de drum ce străbate Vama Borş au apărut muncitori care s-au pus pe lucru. Scopul? Repararea carosabilului, care ajunsese plin de hârtoape şi crăpături, astfel încât să nu ne mai fie, cum spune prefectul Claudiu Pop, ruşine când vin turiştii.

"Era mai mare ruşinea catocmai la intrarea în România să avem un drum de cea mai proastă calitate, astfel că am făcut demersuri pentru repararea lui încă de anul trecut, imediat după instalarea în funcţie. A durat mult, pentru că drumul a fost dat în seama Poliţiei de Frontieră, instituţie care, evident, nu are nici buget, nici personal pentru asfaltări. În cele din urmă, am găsit înţelegere la Compania Naţională de Autostrăzi şi Drumuri Naţionale, să-l repare în regie proprie", a declarat marţi BIHOREANULUI prefectul Claudiu Pop.

Potrivit acestuia, lucrările au început la finele săptămânii trecute, fiind derulate de o echipă a CNADNR, şi vizează înlocuirea completă a asfaltului, cu un covor asfaltic nou, pe o suprafaţă de 5.000 de metri pătraţi.

Finalizarea lucrărilor urmează să aibă loc, potrivit asigurărilor date de CNADNR, cel mai târziu la începutul lunii octombrie, în funcţie şi de starea vremii."
__________________
www.facebook.com/cornea.work
www.whitegekko.com

butuc_88 liked this post
adi.c no está en línea   Reply With Quote
Old September 24th, 2013, 11:12 PM   #13
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

Dar intre Oradea si Vama, pe cand? Ca pe banda 1 iti rupi masina in denivelari, si apropo, DN 1 este reasfaltat pana la Urvind, intre Alesd si Lugas, e dezastru, plin de denivelari.
__________________
Status' Travels.

butuc_88 liked this post
status no está en línea   Reply With Quote
Old September 26th, 2013, 12:25 AM   #14
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

O imagine din satelit, din zona viitorului pasaj al CO peste CF M300.

__________________
Status' Travels.

butuc_88, flanker1 liked this post
status no está en línea   Reply With Quote
Old September 30th, 2013, 02:21 PM   #15
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

Marian Petre Miluţ: "Autostrada de la Debreţin ar putea transforma Oradea într-un hub important"

Preşedintele Uniunii Naţionale a Patronatului Român, Marian Petre Miluţ, spune poziţionarea strategică în vecinătatea graniţiei cu Ungaria ar putea transforma Oradea într-un punct central din care oamenii de afaceri români să aibă legătură directă cu principalele oraşe europene, precum şi cu capitale ca Budapesta sau Viena.

"Autostrada de la Debreţin ar putea transforma Oradea într-un hub important. Combinat cu extinderea aeroportului, autostrada ar putea asigura legătura rapidă cu oraşe precum Munchen sau Viena. Vii, aterizezi la Oradea şi de aici, cu maşina, în câteva ore eşti la Budapesta sau în orice al oraş unde trebuie să ajungi cu afaceri", a spus Marian Petre Miluţ.
__________________
Status' Travels.

butuc_88 liked this post
status no está en línea   Reply With Quote
Old October 1st, 2013, 09:25 AM   #16
flanker1
Registered User
 
Join Date: Apr 2010
Posts: 992
Likes (Received): 110

Quote:
Originally Posted by status View Post
O imagine din satelit, din zona viitorului pasaj al CO peste CF M300.
Cum se va rezolva noua intersectie a CO cu DN1=E60=Calea Clujului?

Ceva noutati despre pod Densus. (tot de pe CO)? S-a terminat reabilitarea?
flanker1 no está en línea   Reply With Quote
Old October 1st, 2013, 03:03 PM   #17
alinpi
Registered User
 
Join Date: Sep 2011
Location: Oradea
Posts: 610
Likes (Received): 718

Unhappy

La podul vechi din zona Densusuianu nu s-a mai facut NIMIC de aproape 2 ani!
A zis Ponta ca nu sunt bani.....
alinpi no está en línea   Reply With Quote
Old October 1st, 2013, 05:28 PM   #18
butuc_88
Butuc
 
Join Date: Jun 2011
Location: strain si calator
Posts: 3,524
Likes (Received): 3236

Quote:
Originally Posted by flanker1 View Post
Cum se va rezolva noua intersectie a CO cu DN1=E60=Calea Clujului?
probabil cu un giratoriu, cum altfel.) (desi nu s-au inceput lucrarile in zona DN1 de decopertare or largire sosea (banda de viraj standa, si de accelerare/decelerare in cazul semaforizarii..

vazand imaginea satelitara, sper ca strada ogorului nu ramane intersecteaza asa cum e acum - continuarea centurii/pasajul ci va fi dirijata in giratoriul in consructie. altfel, nu vad rostul acestuia..(bine, nici asa nu cred ca e cea mai buna justificare, but still)
__________________
nihil sine Deo.
butuc_88 no está en línea   Reply With Quote
Old October 1st, 2013, 09:31 PM   #19
danla
Registered User
 
danla's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 1,275
Likes (Received): 2872

Centura Oradea-Intersectie cu DN1

Quote:
Originally Posted by flanker1 View Post
Cum se va rezolva noua intersectie a CO cu DN1=E60=Calea Clujului?
__________________

status, butuc_88 liked this post
danla no está en línea   Reply With Quote
Old October 2nd, 2013, 09:57 AM   #20
status
Registered User
 
status's Avatar
 
Join Date: Nov 2010
Location: Oradea
Posts: 7,162
Likes (Received): 9346

Deci se va largi C. Clujului la 2X2 pana la viitorul sens giratoriu.
__________________
Status' Travels.
status no está en línea   Reply With Quote


Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:24 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu