daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old June 12th, 2015, 08:56 PM   #641
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

Bangkok Metropolitan Region Mass Transit
25/06/2015

Current lines : 102.05 km
Under Constructions : 122.2 km
Pending : 215.05 km

Design Study : 100.1 km
Planned : 258.66 km

Master Plan : 15 lines - 798.06 km



https://www.facebook.com/14091740126...type=1&theater

----------Current---------
Rapid Transit
BTS Light Green line - (22.25 km)
BTS Dark Green line - (14.5 km)
MRT Blue line - (20.8 km)
Commuter
SRT Airport Rail Link - (28 km)
BRT
BMA Bangkok BRT - (16.5 km)
----------------U/C----------------
Rapid Transit
MRT Purple line - (23 km) - 99.40%
MRT Blue line extension - (27 km) - 62.18%
BTS Light Green line Samut Prakan extension - (12.8 km) - 54.95%
BTS Light Green line Ku Kot extension - (18.4 km) - Construction begins 1st of June
Commuter
SRT Light Red line - (15 km) - 100%
SRT Dark Red line - (26 km) - 38.71%
-------------Pending---------------
Rapid Transit
MRT Purple line extension - (19.8 km) - Preparing for cabinet approval - Construction begins Sept 2016
MRT Orange line - (21 km) - Cabinet approval in Sept - Bidding in Oct 2015
MRT Orange line extension - (17.5 km) Cabinet approval in Sept - Bidding in Oct 2015
Monorail
MRT Pink line - (34.5 km) - Cabinet approval in Sept
MRT Yellow line - (30.4 km) - Cabinet approval in Sept
BMA Grey line - (16.25 km) - Undergoing EIA, construction in Q4 2016
LRT
BMA Bang Na LRT - (18.3 km) - EIA completed, preparing for cabinet approval
Commuter
SRT Airport Rail link extension - (21.8 km) - Bidding in Sept - Construction in Q1 2016
SRT Light Red line Hua Lamphong extension - (11 km) - Construction Q4 2015
SRT Dark Red line Hua Mak extension - (14.5 km) - Construction Q4 2015
SRT Dark Red line Thammasat extension - (10 km) - Construction Q4 2015
------------Design-Study----------
Rapid Transit
MRT Blue line Phuttamonthon Sai 4 extension - (8 km) - Design study to be completed in August
MRT Blue line Om Noi extension - (3 km) - Design study to be completed in August
MRT Brown line - (21.6 km) - Design study to be completed in August
BTS Dark Green line Talling Chan extension - (7.5 km) - Design study to be completed this year
Commuter
SRT Dark Red line Ban Pachi extension - (60 km) - Design study has begun
--------------Planned-------------
Rapid Transit
BTS Light Green line Bang Pue extension - (7 km)
BTS Light Green line Lam Lukka extension - (6.5 km)
BTS Dark Green line Yotse extension - (1 km)
Monorail
BMA Grey line Phase II - (12.17 km)
BMA Grey line Phase III - (11.49 km)
BMA Light Blue line - (9.5 km)
Commuter
SRT Light Red line Salaya extension - (14 km)
SRT Light Red line Nakhon Pathom extension - (43 km)
SRT Light Red line Chachoengsao extension - (60 km)
SRT Dark Red line Maha Chai extension - (38 km)
SRT Dark Red line Pak Tor extension - (56 km)

====================
http://www.prachachat.net/news_detai...sid=1427953392
http://www.ryt9.com/s/iq05/2110363
__________________
On Vacation

-noblesse oblige-

Last edited by Codename B; Today at 02:48 PM.
Codename B está en línea ahora   Reply With Quote

Sponsored Links
 
Old June 12th, 2015, 08:59 PM   #642
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

Plans for the design study of the electrified double track red line commuter. All to be completed in 8 years.



Quote:
Originally Posted by Wisarut View Post

Plan for studying about the massive electrification after realizing double tracking on the following routes

1. Bangsue Central (km 7.47 from BKK) - Ban Phachi (km 90 from BKK) - Pak Nam Pho (km 251 from Bangkok)
2. Bangsue Central (km 7.47 from BKK) - Kaeng Khoi (km 125 from Bangkok) - Thanon Jira (km 266 from BKK)
3. Bangsue Central (km 7.47 from BKK) - Nong Pladuk Junction (km 80 from BKK) - Hua Hin (km 229 from BKK)
4. Bangsue Central (km 7.47 from BKK) - Makkasan (km 5.1 from BKK) - Chachoengsao Junction (km 61) - Pataya (km 158 from BKK)

this will allow Red line commuter to expand the networks with the longer coverage of commuter lines - and even taking a serious consideration to run ICD Lad Krabang - Laem Chabang with even more powerful electric locomotives
http://www.railway.co.th/auction/sys...0156174872.pdf
https://www.facebook.com/photo.php?f...7083196&type=1
__________________
On Vacation

-noblesse oblige-

Last edited by Codename B; June 13th, 2015 at 04:21 PM.
Codename B está en línea ahora   Reply With Quote
Old June 12th, 2015, 09:00 PM   #643
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

MRT Purple line
23 km - 99.40%

Quote:
Originally Posted by kitti View Post
MRT Purple Line Project : Bangyai To Bangsue Section Contract 3 (Depot)











จากเฟสบุคเพื่อนที่ทำงาน ที่ รฟม ครับ
__________________
On Vacation

-noblesse oblige-

dimlys1994 liked this post
Codename B está en línea ahora   Reply With Quote
Old June 14th, 2015, 10:44 PM   #644
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

The Cabinet has now approved the SRT Airport Rail link extension - (21.8 km) + 7 new EMUs for the line. Bidding will begin in 3-4 months and construction works to begin by the end of year. The line is to be completed in 2019.

http://www.dailynews.co.th/economic/328206



Start of the extension

http://suebsak.com/story/2013/10/life20131003.html

Jitlada Station

http://suebsak.com/story/2013/10/life20131003.html

Ratchawithi Station



http://suebsak.com/story/2013/10/life20131003.html

Bang Sue Grand Station

http://suebsak.com/story/2013/10/life20131003.html

Lak Si Station

http://suebsak.com/story/2013/10/life20131003.html

Dom Mueang Airport Station

http://suebsak.com/story/2013/10/life20131003.html
__________________
On Vacation

-noblesse oblige-

Last edited by Codename B; June 15th, 2015 at 08:41 PM.
Codename B está en línea ahora   Reply With Quote
Old June 15th, 2015, 05:00 PM   #645
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

Airport Rail Link bids likely by Sept
15 Jun 2015 at 08:05
WRITER: AMORNRAT MAHITTHIROOK



Steps towards a major overhaul of the Airport Rail Link will start to unroll within three or four months, according to the line operator.

Construction bids for an Airport Rail Link extension between Don Mueang, Bang Sue and Phaya Thai are expected to be called by September or October, said Pakorn Tangjetsakao, acting president of the State Railway of Thailand (SRT) Electric Train Co.

The design plan and environmental impact assessment for the 21.4km extension, likely to cost 31 billion baht, are complete.

The SRT is now writing up the terms of reference for the bidding, which will take place online through an e-auction.

"We expect to sign a contract with the private contractor this year, and begin construction next year,'' Mr Pakorn said.

Under this time frame, the service could be launched by 2019, he said.

The route will establish links between Don Mueang and Suvarnabhumi airports, which will make it more convenient for airline passengers travelling between the two airports.

The SRT estimates the route will attract an additional 40,000-50,000 rail passengers per day, bringing total daily commuters to roughly 100,000.

In anticipation of the change, the company will purchase seven new trains with four carriages each, bringing the Airport Link's City Line trains to a total of 12.

The trains should be delivered by 2017, Mr Pakorn said.

The Airport Rail Link also plans to embark on a major maintenance campaign for its trains, and will hold a second e-auction for the maintenance contract, the terms of which are also being drafted now.

"After we announce the maintenance bid winner, we will need eight or nine months to obtain spare parts, so repairs are likely to commence in mid-2016,'' Mr Pakorn said.

"With each train requiring 45 days for major repairs, fixing all nine trains could take more than a year.

"But small repairs have been carried out consistently,'' he added.

With the new trains and major maintenance repairs done, the lag times between trains should drop from 12-15 minutes to less than 10 minutes.

Mr Pakorn said the system of using public-private partnerships to carry out state projects helps financially, but also makes it more difficult for the government to determine the direction of the project.

http://www.bangkokpost.com/news/gene...likely-by-sept
__________________
On Vacation

-noblesse oblige-
Codename B está en línea ahora   Reply With Quote
Old June 22nd, 2015, 07:12 PM   #646
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 58,078
Likes (Received): 2255

Quote:
Originally Posted by Oasis-Bangkok View Post
,,,
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Codename B, CNXWORLD liked this post
napoleon no está en línea   Reply With Quote
Old Today, 02:34 PM   #647
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

Quote:
Originally Posted by lovesickme View Post
Bangkok BTS light green line

Platform Screen Door




Bangkok Airport Rail Link CityLine





Quote:
Originally Posted by atomx View Post
BTS Phlompong Station and Emporium Mall @ The emdristrict



Natthawut Natthawut Wannachat


Natthawut Natthawut Wannachat
..
__________________
On Vacation

-noblesse oblige-
Codename B está en línea ahora   Reply With Quote
Old Today, 02:36 PM   #648
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

Quote:
Originally Posted by lovesickme View Post
BANGKOK MRT Blue Line (Subway Line Extension)

Quote:
Originally Posted by atomx View Post
MRT Project on History Bangkok area

Hualampong Station





Quote:
Originally Posted by atomx View Post
MRT Project on History Bangkok area

Sanam Chai Station (Museum Siam) Adjacent to Wat Pho and the Grand Palace.

Quote:
Originally Posted by atomx View Post
..
__________________
On Vacation

-noblesse oblige-
Codename B está en línea ahora   Reply With Quote
Old Today, 02:39 PM   #649
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

Quote:
Originally Posted by atomx View Post
Quote:
Originally Posted by atomx View Post
Bangsue grand station @ Jatujak area
under construction






Natthaphat Viriyanukroh


Surin Phumphuang
..
__________________
On Vacation

-noblesse oblige-
Codename B está en línea ahora   Reply With Quote
Old Today, 02:41 PM   #650
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

Quote:
Originally Posted by atomx View Post
Nonthaburi city S CURVE MRT PURPLE LINE


Credit: thinkofliving.com
Quote:
Originally Posted by exxzite View Post
MRT Purple Line | Nonthaburi Province, Thailand














Cr. http://thinkofliving.com/
..
__________________
On Vacation

-noblesse oblige-

dimlys1994 liked this post
Codename B está en línea ahora   Reply With Quote
Old Today, 02:43 PM   #651
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 5,526
Likes (Received): 4163

BTS Dark Green line Talling Chan extension - (7.5 km)

Quote:
Originally Posted by wwc234 View Post
รายงานสดจากโรงแรมรอยัลซิตี้ ปิ่นเกล้า สรุปแนวเส้นทางส่วนต่อขยายสายสีลม จากบางหว้า-ตลิ่งชัน ระยะทาง 7.5 กม. มีจุดเริ่มต้นต่อจากสถานีบางหว้า วิ่งไปทางทิศเหนือตามแนวถนนราชพฤกษ์ โดยจะใช้พื้นที่แนวเกาะกลางของถนน จนไปสิ้นสุดที่บริเวณทางลาดลงของสะพานข้ามรถไฟฟ้าสายสีแดงอ่อน (บางซื่อ-ตลิ่งชัน) หน้าซอยราชพฤกษ์ 24 มีสถานี 6 แห่ง ใช้งบ 1.5 หมื่นล้านบาท คาดเริ่มก่อสร้างปี 2562 แล้วเสร็จปี 2565
by....นิตยสารบ้านพร้อมอยู่







https://www.facebook.com/Homebuyersf...81920585275457
__________________
On Vacation

-noblesse oblige-

dimlys1994 liked this post
Codename B está en línea ahora   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 05:56 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2015, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2015 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2015 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu