Bui Dam 97 per cent complete

The Bui Dam Project, which was initiated by the NPP administration in 2007, is 97 percent complete and if things go well, the project will start operating by the close of the year.

This was disclosed to DAILY GUIDE by one of the engineers on site.
When DAILY GUIDE visited the dam site, Chinese workers as well as their Ghanaian counterparts were busily working on the turbines while others were building quarters meant for displaced persons who used to live on the banks of the Black Volta.

So far, the generators have been assembled and erected while the installation of the turbines and other turbo generators components is in progress.

The turbine shaft, which transfers mechanical energy from the turbine to the generator, has also been successfully installed.

At downstream, a permanent bridge has been built to link the Brong Ahafo Region and the Northern Region to facilitate travels.

According to the engineer, power that would be generated from the Bui Generation Station would go to four GridCo stations in Sawla in the Northern Region, Techiman, Kintampo and Sunyani, all in the Brong Ahafo Region.

Speaking to one of the beneficiaries of the newly built two-bedroom quarters, Nana Kwabena Danquah Denteh, he told DAILY GUIDE that he was very happy to own the quarters because hitherto, he was living in a thatched house and had to cut grass every year to roof his house.

He was however quick to add that the government should impress upon the Bui Dam Authority to expedite action on the payment of compensation to those who lost their farmlands due to the project.

Fishermen who were plying their trade along the Black Volta have been moved downstream.

Opanin Nkansah Adu, a 67-year-old fisherman who has lived and fished at Bui for the past 42 years, said currently, fishermen at Bui did not make any meaningful catch but there was the hope that when the dam was finally completed, the lake that would be created would go a long way to improve fishing activities.

The history of the Bui Dam dates back as far as 1925 when a British-Australian geologist called Albert Ernest Kitson identified the Bui gorge, which is located on the Black Volta in the then Northern Ashanti Region, as ideal for the construction of a dam.

In 1960, the CPP government, under Osagyefo Dr. Kwame Nkrumah, put the project of building a dam there on the drawing board but the project could not be executed before the Osagyefo was overthrown.

When he was overthrown, game wardens were stationed at the Bui Area to take care of black hippopotamus to encourage tourism.

Successive governments that came after Kwame Nkrumah continued feasibility studies of the gorge until the NPP, under John Agyekum Kufour, came to power.

In 2002, then President Kufour went to China and negotiated with the Chinese government to help build a dam at the Bui gorge, with the support of the government of Ghana.

The project, which is being financed by China Exim Bank, started in January 2008 and is expected to be completed this year.

The cost of the project is $622 million and it is expected to produce 400 megawatts of electricity.

A Chinese construction company, Sino Hydro, was commissioned to execute the job.

SourceAILY GUIDE
obeeme no está en línea   Reply With Quote

Sponsored Links
 
Old March 30th, 2013, 05:16 AM   #42
royal_ron2012
Registered User
 
Join Date: Apr 2010
Location: NYC/ Accra
Posts: 592
Likes (Received): 4


royal_ron2012 no está en línea   Reply With Quote
Old April 19th, 2013, 03:11 AM   #43
royal_ron2012
Registered User
 
Join Date: Apr 2010
Location: NYC/ Accra
Posts: 592
Likes (Received): 4


royal_ron2012 no está en línea   Reply With Quote
Old April 19th, 2013, 04:28 AM   #44
apollojoe
Registered User
 
apollojoe's Avatar
 
Join Date: Jul 2008
Location: Minneapolis MN
Posts: 264
Likes (Received): 4

Quote:
Originally Posted by royal_ron2012 View Post
I'm pretty sure but need confirmation that the contrasts in the images are depicting the rainy season and the harmattan and not some unfortunate and severe case of a before and after deforestation situation.
Very picturesque nonetheless.

Last edited by apollojoe; April 19th, 2013 at 04:45 AM.
apollojoe no está en línea   Reply With Quote
Old April 19th, 2013, 11:54 AM   #45
preme3000
Registered User
 
preme3000's Avatar
 
Join Date: Nov 2006
Location: Republic of SSCity
Posts: 2,241
Likes (Received): 112

Quote:
The cost of the project is $622 million and it is expected to produce 400 megawatts of electricity.
Not bad at all
__________________
Fools talk, wise men listen
preme3000 no está en línea   Reply With Quote
Old April 21st, 2013, 12:50 PM   #46
obeeme
Registered User
 
Join Date: Dec 2009
Posts: 283
Likes (Received): 2

Talking

Quote:
Originally Posted by preme3000 View Post
Not bad at all
We urgently need it.First unit to become fully operational on 30th April.
obeeme no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 05:28 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 20.00%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu