Old January 30th, 2014, 06:06 PM   #961
Zapallar
Registered User
 
Join Date: Jan 2014
Posts: 9
Likes (Received): 0

Quote:
Originally Posted by Jim856796 View Post
It turns out that the primary cause of the delay in the new airport's opening was the highly complex fire protection and alarm system. It is said that large-scale reconstruction work may be needed in order for the system to pass the acceptance test. Also, there is a problem with the wiring, and some ventilation vents have apparently been placed in inappropriate conditions. And, around 60 km of construction pipes may have been installed without any thermal insulation and to correct this, the demolition of numerous walls (probably interior and a few exterior) may become necessary.
Jsut recently they discovered that if the airport runs at full, the electrical and electronical wiring in the main cable duct emits so much heat it needs a second sprinkler unit to prevent fires .... quite a charade that's going on there ...
Zapallar no está en línea   Reply With Quote

Sponsored Links
 
Old February 11th, 2014, 05:26 PM   #962
General_FrKr
Registered User
 
General_FrKr's Avatar
 
Join Date: Jan 2014
Posts: 97
Likes (Received): 190

Januar PAX:
TXL: 1,310,647 +9,6%
SXF: 446,333 +3,3%
BER: 1,756,980 +7,9%
General_FrKr no está en línea   Reply With Quote
Old March 20th, 2014, 11:59 PM   #963
1772
Registered User
 
1772's Avatar
 
Join Date: Aug 2009
Posts: 2,276
Likes (Received): 749

So, what's the latest on this?
1772 no está en línea   Reply With Quote
Old March 21st, 2014, 12:19 PM   #964
FunnyElevator
Registered User
 
Join Date: Nov 2013
Posts: 3
Likes (Received): 3

There has been a lot of smaller news around the airport lately but not much noteworthy. I'll try to summarize (and find a english sources)

1. Still no opening date. And it's ave to say that the airport won't be opened this year. The airport boss even send put a warning that it might be opened in 2016 Source 1 Source 2
2. No partial airport opening. All plans of a temporal opening of the airport north pier have been dismissed German Source
__________________

Max BGF liked this post
FunnyElevator no está en línea   Reply With Quote
Old April 2nd, 2014, 10:55 AM   #965
Kampflamm
Secret Asian
 
Kampflamm's Avatar
 
Join Date: Dec 2003
Location: 914 representin'
Posts: 22,109

Berlin airport will 'cost €8 billion and open in 2017'

The €8 billion bill is €6 billion more than the original estimate, Bild newspaper reported, citing sources from Brandenburg's economic ministry.

The report, which quotes three anonymous "high-ranking insiders" from the project, also claims many working on the complex have worries about the buildings' safety and irregularities in the plans.

The experts warned that inconsistencies between different building plans could lead to disaster, with authorities unable to be sure of locating vital features such as fire doors in an emergency.

Safety and technical issues are so widespread that insiders believe the airport must either be gutted down to just the outer walls, or rebuilt from scratch, Bild claimed.

An internal "cost-control" body has produced a list of 66,000 "defects" in the new 10,000-square-metre terminal south of Berlin.

And despite being three years behind schedule, the Brandenburg regional government's airport committee announced last month BER was still only “four percent” problem-free.

The airport, which originally hoped to open its doors in 2011, is now not expected to be completed until after 2017, Bild said.

However it is still officially planned to open in 2014 or 2015.

...

http://www.thelocal.de/20140401/berl...-hit-8-billion
Kampflamm no está en línea   Reply With Quote
Old April 2nd, 2014, 12:16 PM   #966
Tricky
Registered User
 
Tricky's Avatar
 
Join Date: Jul 2004
Location: Berlin / Melbourne / Sydney
Posts: 1,044
Likes (Received): 99

Pleeeaaase! You are quoting the least trusted German newspaper! That's a load of rubbish and not based on any facts! The airport most certainly is 80+% complete, and what people also tend to overlook (whether on purpose or not) is, that the airport that so far cost €4.5bn is actually much bigger than when it was planned for just €2bn, as additional capacity (terminals/piers) were added during construction! So it's unfair to include those capacity expansions in the cost comparison to argue the case of cost blowouts!
__________________
Best Places to live
In Europe: Berlin, in Australia: Melbourne, in Sydney: Northern Beaches
Tricky no está en línea   Reply With Quote
Old April 2nd, 2014, 12:19 PM   #967
Kampflamm
Secret Asian
 
Kampflamm's Avatar
 
Join Date: Dec 2003
Location: 914 representin'
Posts: 22,109

I'm sure you said the same thing when tabloids came out and said the airport wasn't going to open in 2011, 2012, 2013, 2014...
__________________
Deliver me from Swedish furniture!

Max BGF liked this post
Kampflamm no está en línea   Reply With Quote
Old April 3rd, 2014, 03:14 AM   #968
Shenkey
Registered User
 
Join Date: Mar 2009
Posts: 515
Likes (Received): 87

Quote:
Originally Posted by Tricky View Post
Pleeeaaase! You are quoting the least trusted German newspaper! That's a load of rubbish and not based on any facts! The airport most certainly is 80+% complete, and what people also tend to overlook (whether on purpose or not) is, that the airport that so far cost €4.5bn is actually much bigger than when it was planned for just €2bn, as additional capacity (terminals/piers) were added during construction! So it's unfair to include those capacity expansions in the cost comparison to argue the case of cost blowouts!
even if its build 99% and just all cables would be missing for instance, it would cost shit ton.

And here they dont even know the problem
Shenkey no está en línea   Reply With Quote
Old April 5th, 2014, 06:18 PM   #969
TohrAlkimista
Registered User
 
TohrAlkimista's Avatar
 
Join Date: Dec 2006
Location: Milano
Posts: 12,782
Likes (Received): 339

This airport is becoming a joke.
I'm wondering what are the real explanations for such a delay.
__________________
TohrFlickr
||| ||| |||
TohrAlkimista no está en línea   Reply With Quote
Old April 5th, 2014, 06:58 PM   #970
Max BGF
Berlin-Basher Schland e.V
 
Max BGF's Avatar
 
Join Date: Sep 2003
Location: DAF & SSC & Pornoboard
Posts: 3,044
Likes (Received): 2674

"Important" politicians guessing to be better planners than industrial experts.
__________________
Obmann bin ich nunmal, man kann von keinem faktum zurücktreten
Max BGF no está en línea   Reply With Quote
Old April 8th, 2014, 03:52 AM   #971
Suburbanist
on the road
 
Suburbanist's Avatar
 
Join Date: Dec 2009
Location: Breda<->'s-Hertogenbosch<->Eindhoven triangle
Posts: 17,184
Likes (Received): 4035

Do they have an actual timeline for its opening?
__________________
"For every complex problem there is a solution that is simple, clear and wrong."
Suburbanist no está en línea   Reply With Quote
Old April 8th, 2014, 06:01 AM   #972
Tricky
Registered User
 
Tricky's Avatar
 
Join Date: Jul 2004
Location: Berlin / Melbourne / Sydney
Posts: 1,044
Likes (Received): 99

Not yet
__________________
Best Places to live
In Europe: Berlin, in Australia: Melbourne, in Sydney: Northern Beaches
Tricky no está en línea   Reply With Quote
Old April 8th, 2014, 09:41 PM   #973
richard fischer
Registered User
 
Join Date: Apr 2005
Location: rauenberg
Posts: 2,610
Likes (Received): 476

This airport project is a BIG shame for Germany !
richard fischer no está en línea   Reply With Quote
Old April 8th, 2014, 09:44 PM   #974
Suburbanist
on the road
 
Suburbanist's Avatar
 
Join Date: Dec 2009
Location: Breda<->'s-Hertogenbosch<->Eindhoven triangle
Posts: 17,184
Likes (Received): 4035

It is a very weird situation. Major construction is complete and structurally sound. All tests with passenger and luggage have been performed. Yet the freaking fire prevention is not working.
__________________
"For every complex problem there is a solution that is simple, clear and wrong."
Suburbanist no está en línea   Reply With Quote
Old April 8th, 2014, 09:44 PM   #975
goschio
Oh sweet lord Jesus
 
goschio's Avatar
 
Join Date: Dec 2002
Location: TSV FRA
Posts: 5,014
Likes (Received): 641

Quote:
Originally Posted by Suburbanist View Post
Do they have an actual timeline for its opening?
Haha, yur funny.
__________________
Isaiah 28:2
Behold, the Lord hath a mighty and strong one, which as a tempest of hail and a destroying storm, as a flood of mighty waters overflowing, shall cast down to the earth with the hand.

Matthew 7:25
And the rain descended, and the floods came, and the winds blew, and beat upon that house; and it fell: and great was the fall of it.
goschio no está en línea   Reply With Quote


Reply

Tags
airport, berlin

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 06:11 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu