Old August 30th, 2014, 09:37 AM   #461
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Location: Copenhagen
Posts: 3,780
Likes (Received): 867

Bangkok Metropolitan Mass Rapid Transit System
Update 30/08/2014

Current lines

BTS Light Green Line - (22.25 km)
BTS Dark Green Line - (8.7 km)
MRT Blue line - (20 km)
SRT Airport Rail Link - (28.6 km)

Total = 79,55 km

Feeder line

BRT Bus Rapid Transit - (16.5 km)

Under constructions

BTS Light Green line extension - Bearing - Samut Prakan (12.8 km) : 32.77% complete - operational in 2017
MRT Purple line - Bang Sue - Bang Yai (23 km) : 91.77% complete - operational in Mid 2016
MRT Blue line extension - Bang Sue - Ta Phra & Hua Lamphong - Bang Kae (27 km) : 51.84% complete - operational in 2017
SRT Light Red line - Bangsue - Talling Chan (15 km) : 100% complete - waiting for SRT Red Line - Bangsue - Rangsit to finish for the electric train
SRT Dark Red line - Bang Sue - Rangsit (26 km) : 16% complete - operational in 2017

Total = 103.8 km

Awaiting construction

BTS Light Green line extension - Mo Chit - Saphan Mai - Ku Kot (18.7 km) : bidding at the end of the year - construction begin in 2015
MRT Orange line - Thai Cultural Center - Bang Kapi - Minburi (21.8 km) : construction begin in 2016
MRT Pink line Monorail - Kaerai - Pakkret - Minburi (34.6 km) : construction begin in 2016
MRT Yellow line Monorail - Lad Phrao - Samrong (30.4 km) : construction begin in 2016
SRT Airport Rail link extension - Phaya Thai - Don Muang (21.8 km) : bidding in 2015

Total = 127.3 km

Waiting for approval by the Cabinet

BTS Light Green line extension - Ku Kot - Lam Lukka (6.5 km)
BTS Light Green line extension - Samut Prakan - Bang Pu (7 km)
SRT Red line Extension - Bang Sue - Makkasan - Hua Mak & Bang Sue - Hua Lamphong (25.5 km)

Total = 39 km

Design Study

MRT Purple line extension - Tao Poon - Rat Burana (23.6 km)
MRT Orange line extension - Thai Cultural Center - Tallin Chan (13.6 km)
BTS Dark Green line extension - Bang Wa - Talling Chan (7 km)
BMA Grey line Monorail - Vatcharapol - Rama IX Bridge (26 km)

Total = 70.2 km

Waiting for EIA

SRT Light Red line extension - Tallin Chan - Salaya (14 km)
SRT Light Red line extension - Tallin Chan - Sirirat (6 km)
SRT Dark Red line extension - Rangsit - Thammasat (10 km)

Total = 30 km

http://www.prachachat.net/news_detai...sid=1406521869
__________________
With imitations they profane, it is anathema to us.

-noblesse oblige-

Thailand | World Bank 2013
GDP (nominal): 387,252 | GDP (PPP): 964,281 | HDI 2014: 0.722 (High)
GDP Per Capita (nominal): 5,779 | GDP Per Capita (PPP): 14,390 | GNI Per Capita: 13,510

Last edited by Codename B; August 31st, 2014 at 01:23 PM.
Codename B está en línea ahora   Reply With Quote

Sponsored Links
 
Old August 30th, 2014, 09:38 AM   #462
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Location: Copenhagen
Posts: 3,780
Likes (Received): 867

Infrastructure plans to turn Thailand into AEC logistics hub
Somluck Srimalee
The Nation August 29, 2014 1:00 am



The eight-year plan to develop the country's transportation infrastructure at a cost of Bt2.4 trillion will turn Thailand into a key logistics hub in the Asean Economic Community (AEC) by the time the projects are completed in 2022, said Roengsak Tongsom, director of the Rail Project Development Office.

The goal of the strategy to develop the logistics system and integrate all transportation platforms - rail, air, road and water - stretches beyond the Kingdom's borders, as some of the projects form part of a plan to link the country's transportation system with those of neighbouring countries, he said.

The first priority is to develop 10 rail routes in Bangkok and its suburbs, worth Bt700 billion in total, by 2019.

These routes are: 42.8 kilometres of the rapid mass-transit system's Red Line from Thammasat University to Hua Lamphong; the 54-km Pink Line from Salaya to Hua Mark; the 50.3-km Airport Rail Link extension; 60km of the Dark Green Line from Lam Luk Ka to Bang Pu; 14.5km of the Green Line from the National Stadium to Bang Wa; the 47-km Bang Sue-Tha Phra-Bangkae route; 42.8km of the Purple Line from Bang Yai to Rat Burana; the 32.5-km Orange line, from Charan Sanitwong-Rajdumene-Thailand Cultural Centre-Min Buri; the 36-km Khae Rai-Min Buri line; and 30.4km of Yellow Line from Lat Phrao to Samrong.

"These lines will form part of plans to support the inner-city transportation system and city expansion from the heart of Bangkok into the suburbs. They will reduce crowding in the central business districts," said Roengsak.

The next stage of the infrastructure investment plan is to develop the country's wider transportation system and link Thailand and neighbouring countries by rail - via a double-track system, in particular.

The priorities in this respect are construction of a Bt392.57-billion Nong Khai-Nakhon Ratchasima-Saraburi-Laem Chabang-Map Ta Phut railway, and a Bt348.89-billion Chiang Khong-Den Chai-Baan Pahchi line - both using a double-track system.

Investment in these crucial lines will commence in fiscal year 2015, which runs from this coming October, with completion targeted for 2021.

The double-track routes will drive the goal of Thailand becoming a key strategic and logistics gateway to the AEC, which is set to come into effect next year, said the official.

The Nong Khai-Nakhon Ratchasima-Saraburi-Laem Chabang-Map Ta Phut route will support the logistics system from Map Ta Phut to the Lao capital, Vientiane, while the Chiang Khong-Den Chai-Baan Pahchi route will support the logistics system to Myanmar and southern China.

The infrastructure investment planned for greater Bangkok will transform the capital from an overcrowded city by expanding residential areas beyond the central business districts and into the suburbs, said Property Perfect CEO Chainid Adhyanasakul.

Once the infrastructure projects get under way next year, the listed residential developer will expand its investment in Bangkok's peripheral provinces, in line with the mass-transit route expansion, he said.

Another listed developer, Sansiri, is also planning provincial expansion due to the state's revived infrastructure spending plans.

"We suspended our investment in the provinces when the infrastructure investment programme worth Bt2 trillion was suspended. If the new government expands the investment to develop the country's infrastructure in the provinces, we will be ready to expand our investment into new provinces [for Sansiri] that are located close to new infrastructure routes," said the company's president, Srettha Thavisin.

http://www.nationmultimedia.com/busi...-30241987.html
__________________
With imitations they profane, it is anathema to us.

-noblesse oblige-

Thailand | World Bank 2013
GDP (nominal): 387,252 | GDP (PPP): 964,281 | HDI 2014: 0.722 (High)
GDP Per Capita (nominal): 5,779 | GDP Per Capita (PPP): 14,390 | GNI Per Capita: 13,510
Codename B está en línea ahora   Reply With Quote
Old August 30th, 2014, 09:40 AM   #463
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Location: Copenhagen
Posts: 3,780
Likes (Received): 867

BTS Dark Green line extension - Bang Wa - Talling Chan (7 km)

Quote:
Originally Posted by Wisarut View Post
BMA speeding up the study of 7-km extension from Bang Wah to Taling Chan to connect with both red line commuter and Orange line at Talingchan -
However, it is necessary to build Skytrain to cross 15-meter height Boromraj Chonnanee Elevated way at the point that it has reached about 20 meter height instead of just 12 meter height - with depot at Taling Chan. Either BMA building the line and hiring private sectors [Read: BTSC] to run the service or all private sector.

There are 2 choices of the line
1. Following Rajpruek road, passing Phrannok - Phutthamonthon Sai 4 road all the way to Boromraj Chonnanee elevated way all the way to Taling Chan - with further plan to connect with purple line at Bang Yai.
2. Following Rajpruek road, passing Phrannok - Phutthamonthon Sai 4 road all the way to Boromraj Chonnanee elevated way before tuning left to pick the passengers at Southern Bus terminal at Taling Chan and then turning right to head to Taling Chan.

Need to buy some land for depot and maintenance center - BMA is going to use the middle island under jurisdiction of Rural Highway dept for this purpose - Need to ask for the transfer to BMA for the convenience or so - as the part of boosting traffic of those who live in Thonburi side of BKK

http://www.bangkokbiznews.com/home/d...%E0%B8%B2.html



http://www.thanonline.com/index.php?...4#.VAQQjmR_tFl
__________________
With imitations they profane, it is anathema to us.

-noblesse oblige-

Thailand | World Bank 2013
GDP (nominal): 387,252 | GDP (PPP): 964,281 | HDI 2014: 0.722 (High)
GDP Per Capita (nominal): 5,779 | GDP Per Capita (PPP): 14,390 | GNI Per Capita: 13,510

Last edited by Codename B; Yesterday at 08:33 AM.
Codename B está en línea ahora   Reply With Quote
Old August 31st, 2014, 01:06 PM   #464
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Location: Copenhagen
Posts: 3,780
Likes (Received): 867

Thairath TV showing how they will construct the underwater section in Chao Phraya River for the Blue line extension.

Published on Aug 30, 2014
__________________
With imitations they profane, it is anathema to us.

-noblesse oblige-

Thailand | World Bank 2013
GDP (nominal): 387,252 | GDP (PPP): 964,281 | HDI 2014: 0.722 (High)
GDP Per Capita (nominal): 5,779 | GDP Per Capita (PPP): 14,390 | GNI Per Capita: 13,510
Codename B está en línea ahora   Reply With Quote
Old Yesterday, 08:36 AM   #465
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Location: Copenhagen
Posts: 3,780
Likes (Received): 867

SRT Light Red line - Bangsue - Talling Chan (15 km)

Bang Sue - Tallin Chan Expressway to the left and SRT Light Red line to the right

Quote:
Originally Posted by Blue OceanS View Post
30/8/2014





ที่มา FB ภาพupdatedการก่อสร้างรถไฟฟ้า และวิวมุมสูงกรุงเทพhttps://www.facebook.com/Bangkokpulse
__________________
With imitations they profane, it is anathema to us.

-noblesse oblige-

Thailand | World Bank 2013
GDP (nominal): 387,252 | GDP (PPP): 964,281 | HDI 2014: 0.722 (High)
GDP Per Capita (nominal): 5,779 | GDP Per Capita (PPP): 14,390 | GNI Per Capita: 13,510
Codename B está en línea ahora   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:12 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu