Old April 16th, 2014, 10:14 PM   #701
NWDave83
Registered User
 
Join Date: Jun 2013
Posts: 1,053
Likes (Received): 188

I never even thought of it from a construction perspective, just the final design, that makes the alley vacation even more valuable, having to keep an alley there seems like it would add a ton of cost! Basicly making one project into two. Insane.
NWDave83 no está en línea   Reply With Quote

Sponsored Links
 
Old April 17th, 2014, 04:51 PM   #702
Seasun
Registered User
 
Join Date: Jun 2006
Location: Seattle
Posts: 3,061
Likes (Received): 106

Quote:
Originally Posted by mhays View Post
An alley vacation is needed during construction regardless of what's built afterward. Afterward, the drive would be private property.
I'd appreciate clarification on this. If the final building intrudes into the alley right-of-way then yes a vacation would be needed but if the contractor just wants to use the right-of-way during construction I'd expect that normal street use fees would apply.
Seasun no está en línea   Reply With Quote
Old April 17th, 2014, 05:10 PM   #703
Seasun
Registered User
 
Join Date: Jun 2006
Location: Seattle
Posts: 3,061
Likes (Received): 106

Related topic - a lot of people may not realize that the city actually takes alley property from developers as part of the requirements of many projects. I've typically seen this where a 16' existing alley gets 2 feet from each side added onto it to make it a much more useful alley. Below grade space can extend to the old property line and above grade floors can extend to the old property line but at ground level the space is "dedicated" to the city.

http://www.seattle.gov/transportation/cams/cam2203.pdf
Seasun no está en línea   Reply With Quote
Old April 17th, 2014, 05:17 PM   #704
mhays
Journeyman
 
Join Date: Sep 2002
Location: Seattle
Posts: 9,907
Likes (Received): 401

Quote:
Originally Posted by Seasun View Post
I'd appreciate clarification on this. If the final building intrudes into the alley right-of-way then yes a vacation would be needed but if the contractor just wants to use the right-of-way during construction I'd expect that normal street use fees would apply.
I mean that for project that plans to excavate the whole block, they need an alley vacation even if they plan to build a new alley/driveway/passthrough later.

As for the alley width issue, that's infuriating....our new alleys are rediculously wide.
__________________
Why does Internet Explorer crash on 50% of websites? It's almost as bad as Windows 8.
mhays no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:01 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu