Old May 17th, 2017, 07:46 AM   #2041
wwc234
Registered User
 
wwc234's Avatar
 
Join Date: Apr 2013
Posts: 21,867
Likes (Received): 4999

update bang sue grand station
Quote:
Originally Posted by Codename B View Post










By Khun CNXWORLD
http://www.skyscrapercity.com/showth...536809&page=82

bts light greenline north Green Lines Extension
Quote:
Originally Posted by mcwayh_aj View Post

Quote:
Originally Posted by wwc234 View Post
http://www.skyscrapercity.com/showth...59867&page=202

depot bts light greenline north Green Lines Extension
Quote:
Originally Posted by wwc234 View Post

Last edited by wwc234; May 17th, 2017 at 07:57 AM.
wwc234 no está en línea   Reply With Quote

Sponsored Links
Old May 17th, 2017, 09:20 AM   #2042
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,753
Likes (Received): 15145

Quote:
Originally Posted by In Fra Structure View Post
Just in: Tomorrow's contract signing for Pink and Yellow lines has been cancelled as the cabinet has instructed the Transport Ministry to consider the extensions proposed in the offer which were included in the appendix of the offer.
It's been known to the public for a week now, if only they would just include the main lines only, then it would have been approved last week.

The decree does not want the extensions to be included in the main contract. Because it is a commitment and they want the projects to pass the relevant law, therefore, Section 35 shall be reconsidered. The contract was considered by the Attorney General. If there is a change, it takes another 75 days (at the latest). It is expected to be presented to the Cabinet again in June.
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old May 17th, 2017, 11:38 AM   #2043
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,375
Likes (Received): 2465

Quote:
Originally Posted by Codename B View Post
It's been known to the public for a week now, if only they would just include the main lines only, then it would have been approved last week.

The decree does not want the extensions to be included in the main contract. Because it is a commitment and they want the projects to pass the relevant law, therefore, Section 35 shall be reconsidered. The contract was considered by the Attorney General. If there is a change, it takes another 75 days (at the latest). It is expected to be presented to the Cabinet again in June.
Furthermore, the extension BSR wants to implemented have not passed the EIA clearance yet - so the extension should not be mixed without EIA clearance.
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 17th, 2017, 01:40 PM   #2044
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,375
Likes (Received): 2465

Interesting fact for the future Bangkok Mass transit expansions by Render Thailand:




1. Bangsue Central is going to connect with Bangsue Subway station in the following manneer
https://www.facebook.com/RenderThail...34104860183068





Plan for Bang Khun Nont interchange station
https://www.facebook.com/RenderThail...34128396847381

SIEMENS-BOZANKAYA and CRRC Changchun Railway going to deliver the new sets of EMUs for BTS Skytrain [22 sets of Four car formation EMUs for SIEMENS-BOZANKAYA and 24 sets of Four car formation EMUs for CRRC Changchun ] next year (year 2018) until year 2020
https://www.renderthailand.com/new-bts-trains-2018/

dealing with illegal motorcycle taxi around Mochit - Chatuchak station
http://www.now26.tv/view/104158
https://www.youtube.com/watch?v=SXuWYRuGyLQ
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 17th, 2017, 09:51 PM   #2045
Ashis Mitra
Registered User
 
Join Date: Jan 2009
Location: Kolkata
Posts: 2,403
Likes (Received): 1078

Thanks to both for details explanations.

What do you mean by "the perennial political animosity between BMA vs MRTA"?
Ashis Mitra no está en línea   Reply With Quote
Old May 17th, 2017, 10:16 PM   #2046
IsaanUSA
Registered User
 
Join Date: Jan 2013
Posts: 36
Likes (Received): 10

What are those two building sites? Park N Ride?
IsaanUSA no está en línea   Reply With Quote
Old May 18th, 2017, 05:55 AM   #2047
wwc234
Registered User
 
wwc234's Avatar
 
Join Date: Apr 2013
Posts: 21,867
Likes (Received): 4999

Quote:
Originally Posted by IsaanUSA View Post
What are those two building sites? Park N Ride?
yes this is park and ride car
wwc234 no está en línea   Reply With Quote
Old May 18th, 2017, 07:58 AM   #2048
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,375
Likes (Received): 2465

Quote:
Originally Posted by Ashis Mitra View Post
Thanks to both for details explanations.

What do you mean by "the perennial political animosity between BMA vs MRTA"?
BMA and MRTA have their own ideas - after BMA has conceived BTS Skytrain by signing the contract in 1992, BMA has come up with their masterplan in 1995 but OTP and MoT have rejected the BMA plan but coming up with the plan that please MRTA instead - Worse, the government that control MoT (Ministry of Transportation) and the one that control BMA are from the 2 belligerent political party who have mutual hatred with full political animosity - just like 2 rival siblings in Mahabharata that led to Kurukshetra War.
__________________
BKK Mass Transit Expert

In Fra Structure liked this post
Wisarut no está en línea   Reply With Quote
Old May 19th, 2017, 11:24 PM   #2049
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,753
Likes (Received): 15145

Mangmoom Common Ticket Card

From October 1st, Mangmoom card can be used in all four rapid transit routes (BTS sukhumvit and silom line, MRT blue and purple line, ARL Airport rail link) as well as BMTA NGV busses, however at first the card can only be used at interchange train stations such as Chatuchak, Mo Chit, Asoke and Phayathai.

The Office of Transport and Traffic Policy and planning (OTP) is accelerating the installation of a Mangmoom card reader at all 4 main lines at interchange stations first for it to be available on October 1 as determined by the government. Then the installation on the remaining stations will follow, since it is complicated and takes a lot of time. It is expected that the Mangmoom card reader will be fully installed in all rapid transit stations in March 2018.

https://www.khaosod.co.th/economics/news_355443

__________________
-Noblesse Oblige-

dimlys1994 liked this post
Codename B no está en línea   Reply With Quote
Old May 20th, 2017, 02:48 AM   #2050
In Fra Structure
Registered User
 
Join Date: Oct 2015
Posts: 80
Likes (Received): 46

Quote:
Originally Posted by Wisarut View Post
Furthermore, the extension BSR wants to implemented have not passed the EIA clearance yet - so the extension should not be mixed without EIA clearance.
This is the official explanation, the real reason was that they were not happy with the passenger projections given by BSR in their offer. BSR justified the need for the extensions on the basis of being able to reach the passenger projections set in the MRTA tender documents.
In Fra Structure no está en línea   Reply With Quote
Old May 21st, 2017, 06:45 AM   #2051
Ashis Mitra
Registered User
 
Join Date: Jan 2009
Location: Kolkata
Posts: 2,403
Likes (Received): 1078

Quote:
Originally Posted by Wisarut View Post
BMA and MRTA have their own ideas - after BMA has conceived BTS Skytrain by signing the contract in 1992, BMA has come up with their masterplan in 1995 but OTP and MoT have rejected the BMA plan but coming up with the plan that please MRTA instead - Worse, the government that control MoT (Ministry of Transportation) and the one that control BMA are from the 2 belligerent political party who have mutual hatred with full political animosity - just like 2 rival siblings in Mahabharata that led to Kurukshetra War.
Ohho, this is really pathetic.
Ashis Mitra no está en línea   Reply With Quote
Old May 22nd, 2017, 09:37 AM   #2052
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,753
Likes (Received): 15145

Arkom has set the target for the Pink and Yellow line to be approved by the Cabinet by the end of this month. To do so, the proposed extensions for both the Pink and Yellow lines will not be included in the contract.

The acting Governor of MRT will call BTS this week to cut the extensions out of the main contract.

http://www.manager.co.th/iBizChannel...=9600000051650
__________________
-Noblesse Oblige-

In Fra Structure liked this post
Codename B no está en línea   Reply With Quote
Old May 26th, 2017, 05:02 PM   #2053
Appleich
Appleich
 
Appleich's Avatar
 
Join Date: Apr 2011
Location: BKK
Posts: 2,428
Likes (Received): 3457

The delayed MRT Pink and Yellow Line to be pushed forward within June, said Transport Ministry:
Quote:
B358bn rail projects expected to go ahead
Four electric routes to 'kick off this year'


Amornrat Mahitthirook | Bangkok Post | 26 May 2017 at 06:00

Construction of four electric rail routes in the capital at a cost of 358 billion baht will kick off this year, said Peraphon Thawornsupacharoen, deputy permanent secretary for transport.

The four lines are:
- the 34.5-km Pink Line (Khae Rai - Min Buri) worth 54 billion baht
- the 30.4-km Yellow Line (Lat Phrao - Samrong) valued at 52 billion baht
- the 16.4-km western Orange Line (Thailand Cultural Centre - Taling Chan) costing 121 billion baht and
- the 23.6-km southern Purple Line (Tao Poon - Rat Burana) worth 131 billion baht.

Mr Peraphon said the ministry was waiting for a conclusion on the Pink and Yellow lines' contracts detailing railway extensions from the Office of the Attorney-General and a committee set up under Section 35 of the Public Private Partnership (PPP) Act. The two projects will be forwarded to the cabinet for approval this month in order to sign the contracts in June, and start construction in July. The construction of both lines will take about three years, Mr Peraphon said.

As for the western Orange and the southern Purple lines, the ministry will seek cabinet approval for both projects in June, he said.

More details: http://www.bangkokpost.com/news/gene...ed-to-go-ahead
MRT Blue Line extension:









Source: https://www.facebook.com/pg/MRTA.PR/photos/
__________________
Do Not Go Gentle Into That Goodnight.

Codename B, wwc234, EasySeven, dimlys1994 liked this post

Last edited by Appleich; May 26th, 2017 at 05:30 PM.
Appleich no está en línea   Reply With Quote
Old May 26th, 2017, 10:39 PM   #2054
nasle
BANNED
 
Join Date: Sep 2016
Posts: 1,822
Likes (Received): 1394

BANGKOK


Sitthavit Kulv
__________________

EasySeven, Munwon, dimlys1994 liked this post
nasle no está en línea   Reply With Quote
Old May 28th, 2017, 01:35 PM   #2055
fwiarda
Registered User
 
Join Date: Sep 2016
Posts: 3
Likes (Received): 0

Any news?

Quote:
Originally Posted by In Fra Structure View Post
BTS Thaksin was always a temporary structure ................... The fact is that the BMA needs a cash injection to fund all their projects. I will know more after our meeting on 18th May.
fwiarda no está en línea   Reply With Quote
Old May 29th, 2017, 10:06 AM   #2056
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,375
Likes (Received): 2465

74.77 % done for the electromechanic installation to allow Bangsue - Tao Poon extension to be opened on Mother day of 2017
http://www.ryt9.com/s/iq03/2655547
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 29th, 2017, 11:33 AM   #2057
Appleich
Appleich
 
Appleich's Avatar
 
Join Date: Apr 2011
Location: BKK
Posts: 2,428
Likes (Received): 3457

MRT Orange Line: Contractor started to clear the land off, making way for depot construction.

Photograph by Render Thailand



Source: https://www.facebook.com/RenderThail...313946/?type=3

SRT Dark Red Line: Roof structure of Bang Sue Central Station will soon be installed.

Photographs by Render Thailand and Noppadech Gesgomol
Quote:
Originally Posted by CNXWORLD View Post


Source: https://www.facebook.com/RenderThail...474159/?type=3, https://www.facebook.com/RenderThail...649712/?type=3
__________________
Do Not Go Gentle Into That Goodnight.
Appleich no está en línea   Reply With Quote
Old May 30th, 2017, 02:52 AM   #2058
In Fra Structure
Registered User
 
Join Date: Oct 2015
Posts: 80
Likes (Received): 46

BTS/BSR update May 29th 2017: We expect to imminently conclude negotiations and sign contracts for both the Pink and Yellow Lines. Once the MRTA has handed over the required land, construction of the main lines can begin immediately, taking up to 39 months to complete. We estimate that full operation for both lines to be in 2020. The BSR JV proposed extensions to the Pink and Yellow Lines (under “the third envelope”) that should feed additional ridership. These extensions will require further legal processes such as EIA and Cabinet approvals, which may take at least 1 year to conclude.
In FY 2017/18 we expect additional lines to be open for bidding, such as the 16.3km Grey (Phase 1) Line, the 18.3km LRT Line and the 39.6km Orange Line. As a result of BSR JV being awarded the best bid for Pink and Yellow Lines, we believe we are in a much stronger position to win the Grey Line. This is because the Grey Line connects with both the Pink, the Yellow and the Green Line, allowing us to offer more seamless connections between these lines. The LRT Line is expected to be awarded to BTS as it connects with the Green Line and its depot is proposed to be situated on BTS Group land at Thana City that we have earmarked to the BMA without charge. We expect to participate in the bidding process for O&M services for the Orange line. No news on Thaksin station yet.
__________________

lio415 liked this post
In Fra Structure no está en línea   Reply With Quote
Old May 30th, 2017, 10:12 AM   #2059
In Fra Structure
Registered User
 
Join Date: Oct 2015
Posts: 80
Likes (Received): 46

Quote:
Originally Posted by In Fra Structure View Post
BTS/BSR update May 29th 2017: We expect to imminently conclude negotiations and sign contracts for both the Pink and Yellow Lines. Once the MRTA has handed over the required land, construction of the main lines can begin immediately, taking up to 39 months to complete. We estimate that full operation for both lines to be in 2020. The BSR JV proposed extensions to the Pink and Yellow Lines (under “the third envelope”) that should feed additional ridership. These extensions will require further legal processes such as EIA and Cabinet approvals, which may take at least 1 year to conclude.
In FY 2017/18 we expect additional lines to be open for bidding, such as the 16.3km Grey (Phase 1) Line, the 18.3km LRT Line and the 39.6km Orange Line. As a result of BSR JV being awarded the best bid for Pink and Yellow Lines, we believe we are in a much stronger position to win the Grey Line. This is because the Grey Line connects with both the Pink, the Yellow and the Green Line, allowing us to offer more seamless connections between these lines. The LRT Line is expected to be awarded to BTS as it connects with the Green Line and its depot is proposed to be situated on BTS Group land at Thana City that we have earmarked to the BMA without charge. We expect to participate in the bidding process for O&M services for the Orange line. No news on Thaksin station yet.

Good news - BSR just confirmed to me that the cabinet has approved the Pink and Yellow lines this morning 30th May 2017.
__________________

Appleich, wwc234, Codename B, CNXWORLD liked this post
In Fra Structure no está en línea   Reply With Quote
Old May 30th, 2017, 11:50 PM   #2060
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,753
Likes (Received): 15145

Cabinet nod for BTS Joint Venture concession to construct Pink and Yellow Line rail routes
May 30, 2017 19:53
By The Nation

The Cabinet on Tuesday approved the awarding of a concession to BTS Joint Venture group to build the Pink Line rail route from Kai Rai to Min Buri district and the Yellow Line route from Lat Phrao to Sam Rong, at a combined cost of Bt100 billion.

The group comprises three listed companies: BTS Group Holdings, Sino-Thai Engineering and Construction, and Ratchaburi Electricity Generation Holding.

Under the concession, the government will invest Bt50 billion in the two projects by laying out an annual average of Bt5 billion over 10 years, with the remainder to be invested by BTS Joint Venture.

http://www.nationmultimedia.com/news...urism/30316778
__________________
-Noblesse Oblige-

wwc234, Appleich liked this post
Codename B no está en línea   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 07:13 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu