search the site
 daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Highways & Autobahns

Highways & Autobahns All about automobility



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old November 13th, 2017, 03:49 PM   #15061
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

A1 Apeldoorn - Hengelo

Some news regarding the A1 expansion;

* 52 kilometers of motorway to be expanded
* 649 people commented on the draft EIA
* construction will begin after the summer of 2018
* tender phase has started
* final EIA will be compiled parallel to the tender phase

Due to a tight budget, the expansion is programmed in two phases: 2018-2020 and 2024-2026. The provinces of Gelderland and Overijssel are pre-financing some of the project cost so it can begin sooner than originally budgeted.

Expansion plan & schedule
ChrisZwolle está en línea ahora   Reply With Quote

Sponsored Links
Old November 13th, 2017, 08:05 PM   #15062
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,297
Likes (Received): 1998

Quote:
Originally Posted by ChrisZwolle View Post
This video was taken just prior to opening the new expressway around Brunssum.
I don't know why I missed the project for my overview but I think I should add it because it seems to fulfill my criteria, doesn't it. (I thought I have asked in the past and was told that it doesn't fulfill the criteria but I cannot find any post about it)
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **

Been/driven: A, AND, B, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, I, L, LV, LT, N, NL, P, PL, RO, S, SLO, USA (My cumulative travel mapping)
MichiH no está en línea   Reply With Quote
Old November 13th, 2017, 08:06 PM   #15063
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

The entire project is a four lane, divided, controlled-access highway with mostly a 100 km/h speed limit once completed, so I think it fulfills your criteria. Only the first and last exit on A76 and N281 are roundabouts. All other interchanges on the 26 kilometer route are grade-separated.
__________________

my clinched highways / travel mapping • highway photography @ Flickr and Youtube

MichiH liked this post
ChrisZwolle está en línea ahora   Reply With Quote
Old November 14th, 2017, 03:30 PM   #15064
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

N391 Emmen - Ter Apel

The Roswinkel grade-separated interchange of N391 in Drenthe province opened to traffic yesterday. It is a diamond interchange where N391 goes over N379. It is part of a safety upgrade of N391 between Emmen and Ter Apel.

__________________

my clinched highways / travel mapping • highway photography @ Flickr and Youtube

8166UY, EPA001 liked this post
ChrisZwolle está en línea ahora   Reply With Quote
Old November 14th, 2017, 04:07 PM   #15065
Slagathor
Gay love is love too
 
Slagathor's Avatar
 
Join Date: Jul 2007
Location: The Hague
Posts: 8,372
Likes (Received): 5888

I will never drive there.
Slagathor no está en línea   Reply With Quote
Old November 14th, 2017, 04:47 PM   #15066
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

N247 Amsterdam - Volendam

There are plans to upgrade provincial road N247 in North Holland province. Several variants have been made for the crossing at the town of Broek in Waterland.

The most extensive variant is a four lane tunnel with an 80 km/h speed limit:
__________________

my clinched highways / travel mapping • highway photography @ Flickr and Youtube

EPA001 liked this post
ChrisZwolle está en línea ahora   Reply With Quote
Old November 16th, 2017, 06:19 PM   #15067
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

A2 expansion

Quote:
Originally Posted by ChrisZwolle View Post
The draft plan approval for the A2 expansion in Limburg province has been signed yesterday.

The plan is to widen A2 from four to six lanes from Het Vonderen (A73) to Kerensheide (A76). This section of A2 has shoulder lanes, the average traffic is approximately 100,000 vehicles per day on most sections.

The expansion is not just a simple outward widening, they will build an asymetric expansion to address 1950s design deficiencies.

The project is budgeted for 2022-2025. There is no urgent need to do this as fast as possible, the shoulder lanes keep traffic moving.

Some news;

* 73 comments were given to the draft EIA
* 1 comment contained 401 signatures from the village of Guttecoven
* final EIA is expected in 2018

Overall this is a low number of comments, given how A2 runs through a densely populated area and the expansion requires some realignment of A2 at some locations, so it's more work than to just add a shoulder.

No specifics were given about Guttecoven, but this village isn't that close to A2, the distance is some 600 meters with a small forest in between. Other towns are closer to A2, such as Born, Urmond, Roosteren and Echt.
__________________

my clinched highways / travel mapping • highway photography @ Flickr and Youtube

EPA001 liked this post
ChrisZwolle está en línea ahora   Reply With Quote
Old November 16th, 2017, 07:55 PM   #15068
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

A7 Afsluitdijk

New lighting at the sluices on either side of the Afsluitdijk dam (A7):



It is an art project by Daan Roosengaarde.
ChrisZwolle está en línea ahora   Reply With Quote
Old November 17th, 2017, 08:23 PM   #15069
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

N300 Buitenring Parkstad Limburg

Another section of the N300 expressway in Southern Limburg opened to traffic today, a 3 km section from the zoo in Kerkrade to the Avantis roundabout with N281. Over half of the route runs directly along the German border.

This video was taken shortly before opening (it was uploaded yesterday). Strangely it doesn't feature any signage at the exits.

__________________

my clinched highways / travel mapping • highway photography @ Flickr and Youtube

EPA001, SRC_100 liked this post
ChrisZwolle está en línea ahora   Reply With Quote
Old November 17th, 2017, 08:44 PM   #15070
Wilhem275
The Transporter
 
Wilhem275's Avatar
 
Join Date: Apr 2006
Location: Genoa & Venice [I]
Posts: 2,691
Likes (Received): 743

I'd like to suggest this channel:



They operate mostly in the Amersfoort/Utrecht area with on board cameras, and they give a lot of advice on how to deal with emergency vehicles on the road.
__________________
I've sold monorails to Brockway, Ogdenville, and North Haverbrooke, and by gum, it put them on the map!
Well, sir, there's nothing on earth like a genuine, bona fide, electrified, six-car monorail!

Marchionne means never having to say you're sorry.

Due to Photobucket f*cking up, most images won't be visibile in my old posts. If you need anything specific, please write me.

Attus, Turf, Alqaszar, Bjψrne liked this post
Wilhem275 no está en línea   Reply With Quote
Old November 18th, 2017, 12:23 PM   #15071
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,297
Likes (Received): 1998

Quote:
Originally Posted by ChrisZwolle View Post
The entire project is a four lane, divided, controlled-access highway with mostly a 100 km/h speed limit once completed, so I think it fulfills your criteria. Only the first and last exit on A76 and N281 are roundabouts. All other interchanges on the 26 kilometer route are grade-separated.
I think the sections are as follows:

N300: Nuth (A2) – Brunssum (N276) 5.5km (? to October 2018) – project – map
N300: Brunssum (N276) – Brunssum (N274) 2.4km (? to 10th November 2017) – project – map
N300: Brunssum (N274) – Brunssum-Rimburgerweg 3.8km (? to April 2018) – project – map
N300: Brunssum-Rimburgerweg – Landgraaf-Gravenweg 5.5km (? to 28th July 2017) – project – map
N300: Landgraaf-Gravenweg – Eygelshoven ~1km (? to April 2018) – project – map
N300: Eygelshoven – Kerkrade-Gaiazoo 2.2km (? to 2nd June 2017) – project – map
N300: Kerkrade-Gaiazoo – Gracht 3.0km (? to 17th November 2017) – project – map
N300: Gracht – Avantis (N281) 0.7km (? to 16th December 2016) – project – map

Correct?

When have construction works on each segment began?
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **

Been/driven: A, AND, B, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, I, L, LV, LT, N, NL, P, PL, RO, S, SLO, USA (My cumulative travel mapping)
MichiH no está en línea   Reply With Quote
Old Today, 05:09 PM   #15072
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

I don't know an exact date when the N300 construction began for each segment.

The whole project was enviromentally cleared in March 2015, but some sections already began construction before that. In the Amstenrade / Brunssum area, construction already began in early 2014, but most of the project didn't start until mid-2015 or so. A portion on the east side of Brunssum didn't start construction until late 2016.
ChrisZwolle está en línea ahora   Reply With Quote
Old Today, 05:11 PM   #15073
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,096
Likes (Received): 18660

N35 Nijverdal - Wierden

In her first notable act as minister of transportation, Cora van Nieuwenhuizen signed the draft EIA for the N35 expansion between Nijverdal and Wierden today. It will be published for comment on 1 December. A final EIA is expected sometime 2018. The project could be completed in 2022 (moved up from '2022-2024' as was stated before).

The new N35 will be a four lane, controlled-access expressway from Nijverdal to Wierden, where it joins the existing A35 motorway. The speed limit will be 100 km/h, with new interchanges near Nijverdal and Wierden. A wildlife crossing will be built over the road and the adjacent railway.

ChrisZwolle está en línea ahora   Reply With Quote


Reply

Tags
congestion, dutch, friesland, highways, motorways, netherlands

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 08:28 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu