daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Euroscrapers > Local discussions > Romania & Moldova > Development Forums > Bucharest–Ilfov



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old August 18th, 2014, 10:08 PM   #1381
adrian rosca
Registered User
 
Join Date: Feb 2013
Location: Bucharest
Posts: 235
Likes (Received): 194

Raport semestru 1 Astaldi la: http://www.astaldi.com/uploads/files...%20_%20v08.pdf

Vezi pagina 14.
__________________

medicu' de garda, cockspert liked this post
adrian rosca no está en línea   Reply With Quote

Sponsored Links
 
Old August 19th, 2014, 09:13 PM   #1382
cockspert
Cockspert
 
cockspert's Avatar
 
Join Date: Aug 2014
Location: Bucharest
Posts: 19
Likes (Received): 13

Quote:
Originally Posted by v_florin View Post
Care ar fi acel nume? I for one am interested in 7 years of wisdom from the **** ekspert...
Florin, ma lupt de 7 ani cu proprietarii forumului sa faca o rubrica dedicata distinct Romaniei,asa cum are Polonia ba chiar si Ucraina!?
cockspert no está en línea   Reply With Quote
Old September 10th, 2014, 02:08 PM   #1383
cornelt
Registered User
 
Join Date: Jul 2013
Location: Bucuresti
Posts: 58
Likes (Received): 35

sa reinviem topicul
http://www.economica.net/metroul-de-...ina_87425.html
nu stiu cat de adevarat e articolul, dar eu sunt convins ca mai avem de asteptat cel putin 10 ani pana sa circulam cu metroul pe aici, daca se va finaliza vreodata.
cornelt no está en línea   Reply With Quote
Old October 2nd, 2014, 09:02 AM   #1384
alexi1982
Registered User
 
alexi1982's Avatar
 
Join Date: Sep 2009
Location: Bucharest
Posts: 318
Likes (Received): 188

La stația Favorit s-a lucrat īn ultimele zile.

Poză făcută de un prieten, Răzvan, ieri, 1 oct. 2014
__________________

feroviar, dnd, RunRun1730, nirolf, Cadīr liked this post
alexi1982 no está en línea   Reply With Quote
Old October 2nd, 2014, 11:45 AM   #1385
nirolf
Registered User
 
Join Date: Jun 2010
Posts: 226
Likes (Received): 145

Metroul de Drumul Taberei, salvat īn ultima clipă. Astaldi reia lucrările, dar cheamă statul īn judecată


Quote:
Lucrările la Magistrala 5 de Metrou Drumul Taberei-Eroilor au fost reluate la capacitate maximă, antreprenorul general Astaldi revenind la sentimente mai bune faţă de clientul Metrorex. Astfel, după ce timp de aproape două luni Astaldi mai mult a stat decāt a lucrat, la o capacitate de doar 35%, īn prezent capacitatea de lucru se apropie de 100%, spune Aurel Radu, directorul Metrorex.

Īn cazul īn care "şomajul" Astaldi se prelungea, Metrorex ar fi fost nevoită să rupă contractul şi să liciteze din nou lucrările. Este extrem de greu de crezut că alegerea unui nou antreprenor general şi finalizarea lucrărilor īntr-un an ar fi fost posibilă, pentru că doar jumătate din acestea sunt realizate acum.
nirolf no está en línea   Reply With Quote
Old October 3rd, 2014, 11:23 AM   #1386
Puss in Boots
Registered User
 
Join Date: Aug 2011
Posts: 877
Likes (Received): 73

E an electoral, sa nu ne mire
Puss in Boots no está en línea   Reply With Quote
Old October 3rd, 2014, 04:47 PM   #1387
alecu26
Registered User
 
Join Date: Sep 2008
Posts: 7,010
Likes (Received): 865

ai un pic de strangere cu usa a constructorului nu strica. El stie foarte bine ca intr-o reziliere Beneficiarul are cel mai mult de tras, asa ca-si permite.

Oricum momentan interesul este sa se prelungeasaca cat mai mult lucrarile pentru a se putea muta direct utilajele de forat la urmatorul proiect de metrou.
alecu26 no está en línea   Reply With Quote
Old October 3rd, 2014, 05:50 PM   #1388
ByOnu
Registered User
 
ByOnu's Avatar
 
Join Date: Dec 2010
Location: Bucharest
Posts: 400
Likes (Received): 451

Nu cred asta. Prelungirea lucrarilor inseamna clar si prelungirea perioadei de salarizare a muncitorilor, adica ii platesc pe o perioada mai lunga (mai multi bani deci) pentru acelasi rezultat.
ByOnu no está en línea   Reply With Quote
Old October 16th, 2014, 07:19 AM   #1389
alecu26
Registered User
 
Join Date: Sep 2008
Posts: 7,010
Likes (Received): 865

si tu crezi ca prelungirea e fara costuri???

e smecherie de cand lumea: la licitatie declari costuri foarte mici directe (cu materia prima sa zic asa) si costuri foarte mari indirecte (cu personalul TESA).

Primesti o prelungire de termen....faci o groaza de profit doar din asta.

Si prelungirile de termen evident ca sunt din cauza beneficiarului: utilitati, proiect, evize...etc. Tot ce cade in sarcina lui.

Toate proiectele publice din Romania ar trebui trecute pe FIDIC Galben, cu proiectare si responsabilitati la executant, si pret fix.
__________________

the old rax liked this post
alecu26 no está en línea   Reply With Quote
Old November 10th, 2014, 10:23 AM   #1390
alexi1982
Registered User
 
alexi1982's Avatar
 
Join Date: Sep 2009
Location: Bucharest
Posts: 318
Likes (Received): 188

Am trecut de dimineață pe la Eroilor și am observat că au tăiat copacii īn zona īmprejmuită pentru construcția stației de metrou.
alexi1982 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:36 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu