The proposal made by Massimo Tadi from University of Milan

The idea of this thread started from the proposal made by Massimo Tadi for the city Timisoara. She refers in particular to the industrial area of the city located near the railway, which will soon be moved to industrial parks outside the city, so the land becomes very attractive for investors.



For ease of viewing these projects, we divided the area into three districts with small modifications to the proposal presented above.

Last edited by Bogdan BMB; April 19th, 2009 at 02:04 AM.
Bogdan BMB no está en línea   Reply With Quote

Sponsored Links
 
Old April 8th, 2009, 01:32 AM   #2
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Central district - Map




Central district - Projects & Proposal

Square 700: "Gate to the center" - Location

There is a proposal for a spatial organization, and functional landscape that will transform the entire area of 700 Market. Market Area 700 visibly suffering numerous problems: the aesthetic low acute lack of parking places, burdensome conditions in which the market operates and the difficulty of drawing attention to the historical monuments in this area. It requires developing an action plan to harmonize market needs 700 people Timişoarei and modern urban landscape. City Timişoara with Investment ModaTim have imagined a modern and integrated project that provides solutions for all problems of the current Market 700. Beyond the purely urban concept, the initiators were anxious to minimize the financial implications of the community. The concept has been prepared by the office of architecture Andreescu & Gaivoronschi

Regain public space
The project proposes to place the current food market and the market of flowers arranged to a modern piaţetă decreased below the street. In fact, an area of promenade linking market 700 old fortress area by underground pedestrian passageways and escalators. In piaţetă can arrange cafes, terraces and other recreation. Against the background of public asaltării projects with private Timişoara has the chance to win a new public space, just downtown. New piaţetă would complement the other three markets of the Old City, especially with the transformation in historical center pedestrian zone. Liberty Union-lane-Victoria will create a pedestrian movement on north-south axis, while the project will create 700 market mobility and vice versa axis: east-west.

700 Market Modernization
Basically, would make such a gate of access to the historical center of Timisoara. The project is not moving the food and flower market. Activities are traditional in this place and necessary for the inhabitants of the neighborhood. But they must be conducted indoors, according to European standards. The project proposes to build near Saiftim a new building, managed by the Town Hall. Floor and basement of the building will house the two markets, in modern, civilized and easy access. To achieve this investment, ADP, and The Market may be associated with a private investor or can offer space for rent to finance the project.

700 new parking places
Project solutions for the current crisis of parking places, which will soon be acute, with the opening in the vicinity of the new headquarters of the Financial Directorate. In the basement of the entire public space of 700 Square will create two levels of parking lot, approximately 700 public parking spaces. They come in filling the 700 parking lot that will enable all City Business Center.

Rehabilitation of Military Hospital in terms of functionality
Courts interior of the Military Hospital will be used to link the new pedestrian area of Old Town. With the Military Hospital building redevelopment project provides the value and other historical monuments of Market 700: Military Bastion and the Church. Traffic does not suffer changes. By arranging piaţetei, creating two different levels, distinguishing pedestrian traffic to total traffic.

Urban train station
The project is designed from the outset in relation to a future Hall of turning the rail line in the urban train line. A potential host is already near Market 700.

Steps taken and steps project
700 Market development is a major project, involving many forces. Along with Hall and Timişoara ModaTim Investment, participated in discussions Directed Market, ADP Timişoara, GTZ and riveranii Market 700. Once approved by the City Council, the project will be done step-by-step.

The first step: realizing piaţetei urban relocation of the market in the new building and creating parcajelor underground. The project will be completed without interruption of the market by temporarily merging the two markets in the Flower Market area. The first step that can autofinanţa investment and is achievable in 2 years.

Second stage: the integration project in Military Hospital, Church and Military Bastion. This step can be done after the Military Hospital, currently held by the Ministry of Defense, the property will pass to local authorities.

Third stage: with the implementation of the concept of urban train. City Investment ModaTim Timişoara and propose a realistic and practicable, of vital importance for present and future Timişoara. The problems in the area 700 may resolve quickly, with minimum expenditure of the local budget. Furthermore, it will be able to connect the historic downtown area, which will increase the attractiveness of a tourist town. The project also represents a positive model for how the local authorities and private investors can work together in community.






City Business Center Timisoara - Location

ModaTim Investment Company will invest around 50 million euros for first class business center in Timisoara. The project, called City Business Center, will include the complete 5 office buildings. The project has been prepared by the office of architecture Andreescu & Gaivoronschi

The first complex of buildings which could be composed of five buildings will be completed in 2007, will rent an area of 7800 square meters, held on a basement floor, mezzanine and six floors of offices. The building is built on a plot of 2300 square meters, the total investment is estimated at 8 million. ModaTim representatives said they have started construction after the building before the strong development of business property in the country and have brought Timisoara and potential land on which they hold in a strategic position of the city. May Company owns a parcel of unused land on which construction takes into account other office buildings, depending on the demand for quality space in Timisoara.

ModaTim Investment SA was founded in 2005 by ModaTim SA, one of the most important players in the textile industry, Project City Business Center.




Fructus - second stage - Location

A futurist proposal






Maybe the last version






Iulius Mall & Saphir - Location

Iulius Group of companies, owned by Iulian Dascalu, one of the most powerful businessmen in the real estate in Romania will double investment in Timisoara, where Iulius Mall register now almost 850,000 visitors per month.
Thus, Iulius Group will invest another 45 million euro expansion in Iulius Mall Timisoara, double compared to initial estimates, work will start this autumn. Following the investment, the area held a mall map of Timisoara will increase by over 90,000 square meters to 173,000 square meters and leased area will reach over 65,000 sqm. Works expansion project in Timisoara will be completed until 2009.






Faculty of Music and Theater - Location

The idea of departure in project design to the Faculty of Music and Drama has been a creation of a complementary volumetrii the two departments, resulting in a unitary and coherent composition of the style. Volumes can be made a positive composition, having to do with something tangible, well defined. Also, another challenge was a turning alveolar space that marks the limits of the two buildings and create a link between them so that they are accessible in parallel with positive composition mentioned above to obtain a composition of open spaces.

Once established composition rules, and functional layout, to have thought the actual buildings, and especially to the possible targeting of the proposed center in the PUZ developed or already exist on the site thus resulting in a correct orientation and a share of volumes justified created in the composition.

New construction located in a site which currently in a social point of view is absent. Their location on the axle of the Castle Mall, pedestrian axis provided in local planning, requires the creation of a building already simbol.Ducand more architectural approach, accepting public open spaces and green areas designed, the building will devein a center for public interest, not only educational, increasing in popularity.

Having to deal with two departments, art, and create green spaces in the complex pietonalele may become rehearsal areas, both as theater and music, leaving room for possibilities of creating links artistic happening.

As corporeity, has imposed an abstract approach, taking into account the theme and context in which the site is located. The possible existence of remains and Austrian fortifications functions justify tectonic final game project and complementary materials. Stone becomes a joint to the ground, treated metallic body, a parallel to abstract bastionare fortifications and last but not least the location of their bodies white, simple linking of the spatial volumes, creating a unitary composition.

With access created pietonalul Unirii Square - Mall becomes a bridge crossing to which access racordeaza complex. Market over which it passes continuous public pedestrian routes on the site for future economic sciences faculties of arts that became an urban exhibition space.





Willbrook Platinum - Garden Plaza - Location





Fructus - first stage - the highest building in Timisoara to Tower Tender - Location

An Italian company is building what will become the highest building in Timisoara. Over the former hale Fructus, Cavanaro builds a building of 14 levels that will include both office space and apartments. The investment amounts to 25 million euros and will materialize in the spring of 2010. Same time, the Italians hope will be the highest building in town, until the Tower Tender.

"The floor will be commercial. Then the first floor up to the fifth floor will be office space. From the first floor and six to 14 will be suites. Area of an apartment is between 38 and 110 square meters, depending on the number of rooms, which is between one and four. but who wants, can buy two apartments and join them. The offices will be open space type. The difference between us and other builders on the market is that the use cutting-edge materials imported from Germany and Italy. Windows, eg clean themselves when it rains, as have a technology that spreads stropii rain. Also, the materials that we use provides a thermal insulation and sound very good. The walls are dividing the Rigips, but masonry. We thought the problem of seating and parking, so the basement, two floors, we built 104 parking spaces plus 60 on the surface. I resolved many problems this building. So, you have a place downtown, close to Unirii Square, a central park and a quality of life better, "said costante Azzalini, regional manager of the company building.

Investment and the Italians will not stop with this building. Early next year, they want to engage a larger investment. Fructus building opposite, on the space known as Timlibris, Cavanaro will invest between 35 and 50 million for construction of similar buildings, but will have 16 floors, plus three underground levels for parking.




AGN Business Centre - Location

New real estate project A.G.N. Business Center In response to demand for office spaces of class "A" market Timisoara, answering the challenge by building offices located in an excellent location in business area of the city, a structure with a great, modern and functional, making this project so-called "turn down town" that is found in major Western cities or americane.Designul art of AGN Business Center intregeste architectural pattern of the city, joining the vast patrimony of the second pole of the cultural country, Timişoara.

With a total area of 7891.37 square meters and a surface useful 5481.87 square meters, the building will bring together under one roof business banking services, a luxury restaurant situated on the first floor and the area offers relaxation terraces located at floor 7.
The building is built at the entrance of the parking Iulius Mall.

Previous versions


Last 2 variations


Continental Hotel Group - Location

The investment budget is scheduled for 2009 included the opening and the construction site in Timisoara, where we will start construction of a Continental Forum, "said Radu Enache, president and majority shareholder of Continental Group, which has run the business last year about 27 million and has around 1,000 employees.

Central district - Update on projects completed or in progress

ITC - Institute Technical Computing timisoara


Alcatel-Lucent Headquarters



Asylum for the elderly - Adam Muller Guttenbrunn


Aquatim Headquarters


Eta-2u - Office Building


Iulius Mall


First building in the complex ModaTim


Second building in the complex ModaTim


Treasury


AGN Business Centre


The first block - Fructus


Iulius Mall Expansion


Saphir - Residential


Third building in the complex ModaTim


Hotel Continental and Ibis

Last edited by Bogdan BMB; October 6th, 2009 at 12:28 AM.
Bogdan BMB no está en línea   Reply With Quote
Old April 8th, 2009, 01:33 AM   #3
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Vest district - Map




Vest district - Projects & Proposal

Timisora High Towers Multi Purpose Shopping Center Complex - Location

Timisora High Towers Multi Purpose Shopping Center Complex is an spectacular 33 storey building in Timosara City in Romania. This Center that it will be enjoyed by next generations includes all necesary social facilities and it covers 65.000 square meters of construction surface.




Bega Grup - commercial center - Location

Short time, the avenue of Timisoara, the Bega group led by Emil and Marius Cristescu started construction works on a new commercial center to be built on the place now is a hall dezafectată.

"There are going to build a small commercial center that will span an area of 5,000 sqm. We have a food operator and an operator of textile materials. Business Center will be built on the site of a disabled halls and rest area will be used for construction of parking lots, "said Emil Cristescu www.banateanul.ro for. Currently, workers employed in "clean" area for later in the light and weather, can move operations to strict construction and redevelopment area. Investment of around two million euros will be completed by the end of next year.

Vest district - Update on projects completed or in progress

Last edited by Bogdan BMB; April 19th, 2009 at 02:26 AM.
Bogdan BMB no está en línea   Reply With Quote
Old April 8th, 2009, 01:33 AM   #4
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Est district - Map




Est district - Projects & Proposal

Est district - Update on projects completed or in progress

Last edited by Bogdan BMB; April 19th, 2009 at 02:28 AM.
Bogdan BMB no está en línea   Reply With Quote
Old April 16th, 2009, 10:49 PM   #5
MHN
Romania
 
MHN's Avatar
 
Join Date: Feb 2009
Location: Timisoara
Posts: 7,757
Likes (Received): 290

Proiectul unei parcări subterane în Piaţa 700 este gata

Piaţa 700 şi zona adiacentă, situată chiar în inima Timişoarei, este, pe zi e trece, sufocată de maşini. Noile clădiri de birouri ale Modatim Investments, chiar dacă au locuri de parcare subterane, atrag în zonă mult mai multe maşini. Situaţia va fi disperată în momentul în care, peste câteva luni, va fi dat în folosinţă noul sediu al Direcţiei Generale a Finanţelor Publice Timiş. Cu atâtea puncte de interes în zonă se va ajunge la o medie de câteva sute de maşini pe zi. În zona Pieţei 700 există de câţiva ani intenţia de a construi o parcare subterană. Încă din 1995, când s-au făcut planurile pentru noua clădire a finanţelor s-a vorbit despre o asemenea parcare, pe care urma să o gestioneze Administraţia Domeniului Public. Totul a rămas însă la stadiul de proiect şi de… negocieri. În 2007, ADP împreună cu societatea Constructim a cerut atribuirea directă prin concesiune a unui teren situat în Piaţa 700 pentru amenajarea unei parcări subterane. Locaţia era actuala parcare, iar proiectul prevedea şi construirea unor galerii comerciale. A urmat apoi, din fericire pentru timişoreni, un proiect amplu de reamenajare a întregii zone, proiect elaborat de Modatim Investment. Intitulat sugestiv „Poartă către centru”,proiectul a fost apreciat de primarul Gheorghe Ciuhandu, de Consiliul Local şi de timişoreni. Primăria a hotărât realizarea acestui proiect, prin parteneriat public privat, şi a demarat, chiar dacă destul de ezitant, demersurile găsirea unor investitori interesaţi. În bugetul din acest an al Primăriei este prevăzută suma necesară angajări unei firme de consultanţă, licitaţia pentru alegerea acesteia urmând să fie demarată în scurt timp.
Proiectul este gata, negocierile nu
Piata 700În planurile de dezvoltare ale pieţei a apărut acum un nou proiect de parcare, cel al arhitectului Vlad Gaivoronschi. Proiectul, care are cele mai mari şanse de a fi realizat în scurt timp, prevede amenajarea unei parcări subterane în zona cuprinsă între cea de a doua clădire a Modatim Investment şi sediul DGFP Timiş, teren aflat în proprietatea oraşului.


Underground parking project in the 700 market is ready

The 700 Market and adjacent area, located right in the heart of Timisoara, is a day's move, stifling car. New buildings for offices Modatim Investments, even if parking spaces underground in the area attract many more cars. The situation will be desperate at the time that, over several months, will be put into service new headquarters of the Directorate General of Public Finance Timiş. With so many points of interest in the area will reach an average of several hundred cars per day. Market in the area are 700 years of its intention to build an underground car park. Since 1995, when there were plans to finance the new building was also talked about a parking lot, which was to manage a public administration. It remained at the stage of project and ... negotiations. In 2007, ADP with the construction required by awarding direct concession of land situated in Square 700 for arranging a parking underground. Current location was parking, and provide project and construction of commercial galleries. What followed then, fortunately for Timişoara, a draft comprehensive redevelopment of the entire area, a project developed by Modatim Investment. Suggestively titled "Gateway to the center, the project was appreciated by mayor Gheorghe Ciuhandu, the Local Council and Timişoara. City decided this project through public private partnership, and began, even if quite reluctant, efforts to find interested investors. In the budget this year the City provided the amount required hiring a consulting firm, the tender for choosing to be launched shortly.
The project is done, negotiations
Market development plans 700În market has now emerged a new draft parking, the architect Vlad Gaivoronschi. The project, which is most likely to be achieved shortly, provides an arrangement in underground parking area between the second building Modatim headquarters and Investment DGFP Timiş, land owned by the city.


http://www.ziuadevest.ro/economic/75...este-gata.html

Last edited by MHN; April 17th, 2009 at 06:45 AM.
MHN no está en línea   Reply With Quote
Old April 18th, 2009, 04:03 AM   #6
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Quote:
Originally Posted by Robi_damian View Post
Doua sali de sport vor fi in campusul UVT din zona Oituz. De altfel, acesta va fi cred cel mai mare proiect de constructii din oras, desi acum e in stadiu incipient (abia s-a inceput lucrul la fundatiile salilor de sport). Se includ, in zona, o facultate completa, centre de cercetare, o cladire de 10 etaje cu scopuri administrative, precum si alte constructii auxiliare.
Exista ceva poze cu acea cladire? M-am uitat mai sus si nu am vazut nimic in proiectul "Facultatea de teatru si muzica" de 10 etaje.
Bogdan BMB no está en línea   Reply With Quote
Old April 18th, 2009, 11:34 AM   #7
Robi_damian
Registered User
 
Robi_damian's Avatar
 
Join Date: Jun 2008
Location: Timisoara/London/Bilbao
Posts: 2,042
Likes (Received): 2108

Am sa incerc sa fac rost. Nu facultatea de teatru si muzica va avea 10 etaje, ci cladirea administrativa care va inlocui rectoratul de pe Vasile Parvan. Aceasta cladire va fi chiar pe coltul dintre Popa Sapca si Oituz, unde exista deja o cladire mai veche de mici dimensiuni.

Facultatea de Arte si Muzica se va face prin extinderea actualei cladiri, in zona fiind construita si o "Piateta a artistilor". Dintre alte cladiri, se creeaza un centru de cercetare multidisciplinar. Acesta este intr-o cladire interbelica din curtea facultatii de arte, si este deja reabilitata in exterior, urmand sa fie executat si interorul in curand.

In alte planuri, mi-a atras atentia planul de a crea o statie de tip S-Bahn pe calea ferata suspendata, in zona de intersectie a CF cu Calea Aradului.

Toate acestea le-am vazut la UVT. A existat o prezentare a planului de dezvoltare a zonei acum vreo 6 luni.
Robi_damian no está en línea   Reply With Quote
Old April 18th, 2009, 08:28 PM   #8
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

WOW !!! Chiar e interesant, de rectoratul UVT am auzit acum 1-2 ani si am crezut ca au abandonat proiectul. De statie nu am auzit nimic pana acum, era vorba doar de cea din p-ta 700, chiar ar fi ok sa se faca mai multe statii. Sa ne ti la curent cu ce afli

Paste Fericit tuturor !
Bogdan BMB no está en línea   Reply With Quote
Old April 24th, 2009, 07:49 PM   #9
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Vest district

Se renoveaza o cladire istorica de pe B-dul Republicii



Central district

Se pare ca cei de la ModaTim au renuntat la acea piateta si vor face cateva locuri de parcare in plus





Iulius Mall - update




Bogdan BMB no está en línea   Reply With Quote
Old April 24th, 2009, 08:23 PM   #10
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

English

Primarul in strada pentru parcarea din Piata 700

Ca sa fie si mai convingator, Gheorghe Ciuhandu a luat ziaristii sa le arate, in teren, ca trebuie ca parcarea subterana din Piata 700 sa fie construita cat mai grabnic. Iar pentru asta, proiectul e musai sa treaca in plenul de marti al Consiliului Local. Asta dupa ce proiectul a cazut luna trecuta. Atunci, consilierii PDL au sustinut ca nu sunt de acord ca lucrarea sa fie incredintata direct firmei Constructim, suspectand ca la mijloc ar fi vorba de niste interese.

Este vorba de parcarea subterana care s-ar construi in Piata 700 vizavi de sediul Aquatim pe un teren de 6000 mp.

Gheorghe Ciuhandu a tinut sa sublinieze ca nu exista niciun interes, asa cum s-a vehiculat si ca dintre cele 18 firme care au cumparat caietul de sarcini, una singura s-a mai prezentat la negocieri. Constructim este dispusa sa investeasca in realizarea parcarii pe 2 nivele 5 milioane de euro. Primarul a mai spus ca la finalizarea investitiei, cheltuielile cu intretinerea parcarii, dar si profitul vor fi impartite astfel: 25 la suta ADP (firma aflata in subordinea Consiliului Local) si 75 la suta investitorul. Potrivit unui studiu, adauga primarul, costurile cu investitia s-ar amortiza in 8-9 ani.

Gheorghe Ciuhandu spune ca spera ca marti, proiectul sa fie votat de consilieri pentru ca astfel s-ar crea si locuri de munca, dar mai ales... 300 de locuri de parcare. Trebuie sa profitam de faptul ca in jur se fac investitii majore, a precizat primarul. El a spus si ca a avut o discutie foarte serioasa cu presedintele CJT Constantin Ostaficiuc si cu prefectul Mircea Bacala pe tema parcarii din 700 si acestia l-au asigurat de toata sustinerea lor.

De altfel, consilierul local PDL, Adrian Pau, spune ca el si colegii sai nu s-au opus realizarii acestei parcari extrem de necesare, ci au fost doar impotriva incredintarii directe a proiectului unei firme.

Seful ADP, Liviu Barbu, spune ca s-a propus un tarif de 3 lei pe ora la parcare, dar ca vor fi si abonamente, iar riveranii vor avea reduceri. Deasupra parcarii vor fi facute si alte locuri unde se vor putea parca masini si se vor amenaja spatii verzi.

Daca proiectul va trece marti, primarul spune ca lucrarile vor demara in regim de urgenta, iar in 10 luni, parcarea din 700 va fi gata.

English

Mayor street for parking in the Square 700

To be more convincing, Gheorghe Ciuhandu took journalists to show them in the ground, we need as underground parking in Square 700 to be built as early. And for this, the e Musa pass in Tuesday's session of the Local Council. This project after a fall last month. Then PDL advisers have claimed that I do not agree that the work be entrusted to direct the company construction, suspectand means that would be of some interest.

If the project will move Tuesday, the mayor said that work will start in an emergency, and in 10 months, the parking lot 700 will be ready.

http://agenda.ro/news/news/18296/pri...piata-700.html
Bogdan BMB no está en línea   Reply With Quote
Old April 25th, 2009, 11:08 AM   #11
MHN
Romania
 
MHN's Avatar
 
Join Date: Feb 2009
Location: Timisoara
Posts: 7,757
Likes (Received): 290

Quote:
Originally Posted by Bogdan BMB View Post
English

Primarul in strada pentru parcarea din Piata 700

Ca sa fie si mai convingator, Gheorghe Ciuhandu a luat ziaristii sa le arate, in teren, ca trebuie ca parcarea subterana din Piata 700 sa fie construita cat mai grabnic. Iar pentru asta, proiectul e musai sa treaca in plenul de marti al Consiliului Local. Asta dupa ce proiectul a cazut luna trecuta. Atunci, consilierii PDL au sustinut ca nu sunt de acord ca lucrarea sa fie incredintata direct firmei Constructim, suspectand ca la mijloc ar fi vorba de niste interese.

Este vorba de parcarea subterana care s-ar construi in Piata 700 vizavi de sediul Aquatim pe un teren de 6000 mp.

Gheorghe Ciuhandu a tinut sa sublinieze ca nu exista niciun interes, asa cum s-a vehiculat si ca dintre cele 18 firme care au cumparat caietul de sarcini, una singura s-a mai prezentat la negocieri. Constructim este dispusa sa investeasca in realizarea parcarii pe 2 nivele 5 milioane de euro. Primarul a mai spus ca la finalizarea investitiei, cheltuielile cu intretinerea parcarii, dar si profitul vor fi impartite astfel: 25 la suta ADP (firma aflata in subordinea Consiliului Local) si 75 la suta investitorul. Potrivit unui studiu, adauga primarul, costurile cu investitia s-ar amortiza in 8-9 ani.

Gheorghe Ciuhandu spune ca spera ca marti, proiectul sa fie votat de consilieri pentru ca astfel s-ar crea si locuri de munca, dar mai ales... 300 de locuri de parcare. Trebuie sa profitam de faptul ca in jur se fac investitii majore, a precizat primarul. El a spus si ca a avut o discutie foarte serioasa cu presedintele CJT Constantin Ostaficiuc si cu prefectul Mircea Bacala pe tema parcarii din 700 si acestia l-au asigurat de toata sustinerea lor.

De altfel, consilierul local PDL, Adrian Pau, spune ca el si colegii sai nu s-au opus realizarii acestei parcari extrem de necesare, ci au fost doar impotriva incredintarii directe a proiectului unei firme.

Seful ADP, Liviu Barbu, spune ca s-a propus un tarif de 3 lei pe ora la parcare, dar ca vor fi si abonamente, iar riveranii vor avea reduceri. Deasupra parcarii vor fi facute si alte locuri unde se vor putea parca masini si se vor amenaja spatii verzi.

Daca proiectul va trece marti, primarul spune ca lucrarile vor demara in regim de urgenta, iar in 10 luni, parcarea din 700 va fi gata.

English

Mayor street for parking in the Square 700

To be more convincing, Gheorghe Ciuhandu took journalists to show them in the ground, we need as underground parking in Square 700 to be built as early. And for this, the e Musa pass in Tuesday's session of the Local Council. This project after a fall last month. Then PDL advisers have claimed that I do not agree that the work be entrusted to direct the company construction, suspectand means that would be of some interest.

If the project will move Tuesday, the mayor said that work will start in an emergency, and in 10 months, the parking lot 700 will be ready.

http://agenda.ro/news/news/18296/pri...piata-700.html
Cei care lucreaza in zona stiu: o parcarea in piata 700 este necesara ca aerul!!!
MHN no está en línea   Reply With Quote
Old April 25th, 2009, 11:25 AM   #12
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Pe langa parcarea care presupun ca vor sa o faca in locul pitetei, am vazut aseara pe tion ca cei de la ModaTim au achizitionat si niste lifturi pentru dublarea locurilor de parcare, cred ca ele sunt numai in corpul B.

Cu tot cu acea investitie, nu se va ajunge la un numar rezonabil de parcari asta deoarece acum e nebunie, dar dupa ce vor deschide si cei de la finante ...

Sper ca vor continua proiectul Piata 700 - Poarta catre centru cu tot cu ridicarea liniei pe estacada, astfel se vor mai crea inca multe alte locuri de parcare

Bogdan BMB no está en línea   Reply With Quote
Old April 28th, 2009, 08:42 PM   #13
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Romana

E sigur: se va face parcare subterana in Piata 700!

A trecut proiectul! Consilierii locali au votat pentru. Dupa ce luna trecuta, in plen, proiectul parcarii subterane din Piata 700 a cazut, deoarece consilierii PDL n-au fost de acord cu modul in care se acorda, direct, lucrarea unei firme, acum s-au adunat 19 voturi si proiectul merge mai departe.

Daca data trecuta cel mai vehement contestatar a fost consilierul PDL Ovidiu ciuhandu, acum locul sau a fost luat de liberalul Ciprian Jichici, presedintele Comisiei de Urbanism. El spune ca nu s-a opus proictului, ci modului in care se realizeaza.

"Sunt neconcordante foarte grave. Anul trecut, in luna septembrie, au semnat procesul verbal 3 persoane care atunci nu mai erau consilieri. De ce nu putem face o licitatie publica deschisa?" i-a intrebat Jichici pe colegii sai.

Primarul Gheorghe Ciuhandu le-a explicat consilierilor ca s-a luptat jumatate de an pentru ca CF-ul terenului pe care se va face parcarea sa fie in regula, deoarece au fost probleme juridice. Insa, a adaugat primarul, decizia le apartine consilierilor si nu vrea sa fie acuzat ca are interese.

La randul sau, viceprimarul Sorin Grindeanu i-a asigurat pe membrii Consiliului Local ca nu se vor face spatii comerciale acolo, ci doar parcari, iar Cristian Anton de la PSD a cerut ca terenul de aproape 6.500 mp sa fie exploatat la maximum si sa se faca mai mult de 300 de locuri, cat prevede studiul de piata.

English

Is sure, will be underground parking in Square 700

A past project! Local councilors voted in favor. After last month, in plenary, the underground parking of 700 market has fallen since PDL advisers were never agree with how you give, directly, a company work, now have gathered 19 votes and the project goes away.

If the last time was bitterly opposing counselor PDL Ovidiu Ciuhandu now place was taken by the Liberal Ciprian Jichici, president of Urban Planning Commission. He says not opposed proictului, but how that is done.

"I am very serious False. Last year, in September, signed the minutes when 3 people were no longer advisers. Why not make a public auction open?" he asked his colleagues on Jichici.

Mayor Gheorghe Ciuhandu he explained advisers struggled to half a year for the railway land on which parking will be okay because they were legal. But, added the mayor, the decision belongs to the counselors and not want to be accused to have interest.

In turn, viceprimarul Sorin Grindeanu take assured members that the Local Council will be commercial spaces there, but parking and Cristian Anton from PSD has requested that land for nearly 6500 square meters to be exploited fully and to make May than 300 seats, but the study provides market.

http://agenda.ro/news/news/18419/e-s...piata-700.html
Bogdan BMB no está en línea   Reply With Quote
Old May 7th, 2009, 03:43 PM   #14
MHN
Romania
 
MHN's Avatar
 
Join Date: Feb 2009
Location: Timisoara
Posts: 7,757
Likes (Received): 290

Status Constructie cladiri in zona Piata 700

Fructus - a ajuns la etajul 9:



City Business Centre - parcare subterana Cladirea C:
MHN no está en línea   Reply With Quote
Old May 8th, 2009, 01:08 AM   #15
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

Am vorbit zilele astea cu cineva care ar urma sa se mute in AGN, spunea ca prin iunie-iulie le-au spus ca va fi gata. Voi mai stiti ceva?
Bogdan BMB no está en línea   Reply With Quote
Old May 8th, 2009, 02:20 AM   #16
MHN
Romania
 
MHN's Avatar
 
Join Date: Feb 2009
Location: Timisoara
Posts: 7,757
Likes (Received): 290

Quote:
Originally Posted by Bogdan BMB View Post
Am vorbit zilele astea cu cineva care ar urma sa se mute in AGN, spunea ca prin iunie-iulie le-au spus ca va fi gata. Voi mai stiti ceva?
nu am informatii dar e exclus sa fie gata atunci.
trec in fiecare zi, cel putin o data, pe linga ea si nu vad prea mare agitatie in jur. deci....
MHN no está en línea   Reply With Quote
Old May 15th, 2009, 11:36 PM   #17
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151



Nu am mai auzit de el pana acum, doar asa vag, ca vor sa se mute, nimic special. Doar din imaginea asta nu ne putem da seama ce va iesi, daca va fi ceva "profi" sau doar un turn cu sticla. Din punctul meu de vedere e bine ca se merge pe cladiri de pana in 20 de etaje si astfel nu se acopera piata de un singur dezvoltator.

Quote:
Originally Posted by Djulwes View Post
Vad ca se remodeleaza Circumvalatiunii. Are cineva idee ce va fi intre noul continental si liceul coanda?
Quote:
Originally Posted by MHN View Post
salut Djulwes si bun venit!

intr-adevar se remodeleaza.
tu la ce te referi cind spui intre Continental/Ibis si Liceul Coanda?
Acolo este Politia Rutiera. Sau te referi la alt lot?
Hotel Ibis si intre Ibis si pol rutiera

cred ca se refera la hala timco

Last edited by Bogdan BMB; May 15th, 2009 at 11:42 PM.
Bogdan BMB no está en línea   Reply With Quote
Old May 16th, 2009, 12:15 AM   #18
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151

IOROM







Bogdan BMB no está en línea   Reply With Quote
Old May 16th, 2009, 01:03 AM   #19
Bogdan BMB
Registered User
 
Bogdan BMB's Avatar
 
Join Date: Sep 2008
Posts: 6,271
Likes (Received): 151







Imi place ca s-au legat de tesutul actual si doresc sa continue strazile infundate dar si sa creeze o legatura cu zona de case din N-V
Bogdan BMB no está en línea   Reply With Quote
Old May 16th, 2009, 01:05 AM   #20
MHN
Romania
 
MHN's Avatar
 
Join Date: Feb 2009
Location: Timisoara
Posts: 7,757
Likes (Received): 290

Quote:
Originally Posted by Djulwes View Post
Salut tuturor si merci de intampinare!

MHN, politia rutiera practic face parte din Liceul H. Coanda, ocupand unul dintre camine. Eu vorbesc din spatiul dintre liceu si hotel, parca iorom sau cum i-o spune. E un spatiu cred ca de doua ori mai mare decat cel pe care se va construi hotelul si e plin de hale dezafectate.
Pai daca proiectul Continental+Ibis nu acopera si portiuni sau integral spatiul IOROM, atunci acolo nu stiu ce se va face.
MHN no está en línea   Reply With Quote


Reply

Tags
romania, ro_banat, timisoara

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 03:37 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu