Old June 26th, 2005, 06:05 AM   #1
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

KUALA LUMPUR SMART Tunnel - Stormwater Management And Road Tunnel

KL's SMART Tunnel:


The SMART Project Tunnel is about 9.7 km long and has internal diameter of 11.83 m. The SMART integrates both stormwater management and a motorway in the same tunnel.

The Stormwater Management Component comprises of the diversion structure, a holding basin, a bypass tunnel, a storage resevoir and the twin box culvert and an outlet structure. The total storage capacity for SMART system is 3 million m3. The existing ponds at Kg. Berembang and Taman Desa will be utilized as holding basin and storage reservoir.

The motorway will consist of a 3 km double deck structure within bypass tunnel with ingress and egress connection links at both ends of the structure. The ingress and egress connection to the motorway Tunnel Linking KL - Seremban Highway to Jalan Sultan Ismail and Jalan Tun Razak.

The motorway consist of four ventilation and emergency escape shafts at about 1 km intervals and cross passages at 250 m intervals along the motorway tunnel.

A flood detection system and control and surveillance team will be incorporate in the overall SMART system to effectively integrate and manage both stormwater and traffic.


Teh operation of the SMART system works on three principal mode operation based on the relationship between flood discharge at the Sg. Klang / Sg. Ampang confluence and the operations status of the motorway. The river water stages and river discharge will be monitored via hydrological stations along the rivers.

The flood discharge will only be diverted into the bypass tunnel when it exceeds 70 cumecs. For flood discharge between 70 to 150 cumecs, the motorway will still be open to traffic. The motorway will only be closed when the flood discharge exceeds 150 cumecs for the full stormwater operation of the SMART, which is expected once or twice a year.

The reinstatement from stormwater to motorway operation will be initiated when the flood discharge recedes to 70 cumecs. The reinstatement process will take about 4 days and this involves cleaning up and reinstalling all portable equipment to full operation mode.
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote

Sponsored Links
 
Old June 26th, 2005, 06:06 AM   #2
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

SMART Facts...


WHO: Government of Malaysia – Department of Drainage and Irrigation Malaysia, Malaysian Highway Authority
WHAT: The longest tunnel project in Malaysia. One of its kind dual-purpose tunnel project incorporating stormwater and motorway
WHERE: 9.7 km tunnel spanning across the city centre of Kuala Lumpur
WHEN: Construction began in January 2003, Scheduled completion is December 2006
WHY: First, for flood mitigation, second as a means of reducing traffic congestion between the Southern Gateway and the city centre






__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old June 26th, 2005, 06:07 AM   #3
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

SPECIAL FEATURE









The unique feature of this project is the 3 km double-deck motorway within the stormwater tunnel. The operation of the SMART system works on the three- principle mode of operation based on the flood discharge at the Klang River/ Ampang River confluence and the operation status of the motorway.









The first mode, under normal condition where there is no storm or low rainfall, no flood water will be diverted into the system.Under the second mode, SMART system will be activated and this happens when there is moderate storm.









When the second mode is activated, flood water is diverted into the bypass tunnel in the lower channel of the motorway tunnel and it is important to note, that, up to this stage, the motorway section is still open to traffic.

At the third mode of operation the motorway will be closed to traffic. With extensive and effective monitoring stations, when the third mode of operation is needed, the motorway will be closed to traffic. Sufficient time will be allocated to allow the last vehicle to exit the motorway before the automated water-tight gates are opened to allow flood water to pass through. The motorway will be reopened to traffic within 48 hours after the closure.

Tunnel Safety
Ventilation/ escape shafts at 1km intervals: these powerful air ventilators will constantly renew the air and maintain the air quality within the motorway. To protect the ventilation system during the flooding, the systems consist of a series of shafts each containing an exhaust and fresh air injector. This design enables the fans to be situated outside the SMART tunnel to create a longitudinal flow in the tunnel between the shafts that permits the air in the tunnel to be continuously renewed and to enable extraction of the exhaust fumes. The feature also allows for smoke control in the event of a fire.

Equipped with fire fighting, telecommunication and surveillance equipment at 1 km interval.

SMART SYSTEM

SMART is an acronym for Stormwater Management and Road Tunnel, a project under the Federal Government initiated to alleviate the flooding problem in the city centre of Kuala Lumpur. The project is implemented through a joint venture pact between MMC Berhad and Gamuda Berhad with the Department of Irrigation And Drainage Malaysia and the Malaysian Highway Authority as the executing government agencies.




__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old June 26th, 2005, 06:08 AM   #4
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

GEMILANG ACHIEVES FIRST AND MAJOR MILESTONE…








SMART’S second tunnel boring machine, Gemilang achieved its first milestone at the South Junction box breakthrough on 4 June, 2005

Gemilang which started boring in August has covered a distance of 1822m and 1067 rings with another 2127m to go before the final breakthrough at the storage reservoir in Taman Desa in the South of the alignment.

The machine will be walked through the shaft for about 89m before it resumes boring works early July, 2005.

SMART is primarily a flood mitigation project with a second objection of providing an alternative traffic dispersal system between the Southern gateway and the city centre. Overall construction progress is at 51%.

SMART will see full completion in December 2006
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old June 26th, 2005, 06:11 AM   #5
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429











__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old July 10th, 2005, 06:11 AM   #6
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

| Progress as of 30th June 2005





__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old July 17th, 2005, 03:50 PM   #7
Blue_Sky
Moderator
 
Blue_Sky's Avatar
 
Join Date: Jul 2005
Posts: 9,504
Likes (Received): 357

Great project!!!!

This is really awesome.....
Blue_Sky no está en línea   Reply With Quote
Old July 17th, 2005, 08:27 PM   #8
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old September 23rd, 2005, 09:43 PM   #9
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

Structural works at MS02 U-section completed



Concreting of upper deck panel ending 675m from North Ventilation Shaft in progress on 30/08/05

__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old June 22nd, 2009, 03:31 PM   #10
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 76,831
Likes (Received): 1429

-delete-
nazrey no está en línea   Reply With Quote
Old June 23rd, 2009, 10:12 PM   #11
jklm265
BANNED
 
Join Date: Jun 2009
Posts: 6
Likes (Received): 0

Replica Monogram Denim Handbags

we commits to supplying Replica Monogram Denim Handbags from the highest quality, at the lowest Cheap price,Replica Monogram Denim Handbags Wholesale Cheap Monogram Denim Handbags Fake.providing the greatest service and satisfaction available! Try an order today and feel the replica-louis.com shopping experience!
jklm265 no está en línea   Reply With Quote
Old February 11th, 2013, 09:26 PM   #12
UjaiDidida
Moderator
 
UjaiDidida's Avatar
 
Join Date: Dec 2009
Location: Kuala Lumpur Currently at: Johor Bahru From: Bandar Baru Bangi Favourite Food: Nasi Lemak
Posts: 6,143
Likes (Received): 1316

image hosted on flickr

http://www.flickr.com/photos/13874874@N06/8466229764/
__________________
.
RHAPSODY
UjaiDidida no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:14 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu