Old June 3rd, 2011, 07:16 PM   #1121
Yagya
ecrasez l'infame
 
Yagya's Avatar
 
Join Date: Oct 2010
Posts: 5,417

Getting pictures isn't your birthright you know. The so called lazy fourmers don't have obligations to provide pictures. In any case come to Mumbai and then realise that it isn't as easy to go around the city. Some of them live far away and majority of their day would be wasted just going to the site and coming back not to forget that they have to earn a living.
__________________
Rajasthan|पधारो म्हारे देस...

In Realm Of The Senses
Yagya no está en línea   Reply With Quote

Sponsored Links
Old June 3rd, 2011, 07:43 PM   #1122
patrykus
Registered User
 
patrykus's Avatar
 
Join Date: May 2008
Location: Poland
Posts: 3,778
Likes (Received): 1794

Let sums it up.

You bash me because I drawn some conclusions based on the information I got. You say these informations are not enough. And those informations were press article about this tower construction stop, and picture showing equipments being taken back from the site. If those informations are really not enough to express just even opinions (not stating facts), then just simply bring me more information. It's simple as that.

As for your last post, well this seems to be the case only in mumbai. Anywhere else in the world large projects like this gets always continues coverage.

Last edited by patrykus; June 3rd, 2011 at 07:49 PM.
patrykus no está en línea   Reply With Quote
Old June 4th, 2011, 04:51 AM   #1123
aksstar
Epic
 
aksstar's Avatar
 
Join Date: May 2008
Posts: 152
Likes (Received): 1

The pictures or lack thereof speaks for itself. There is no point trying to argue with someone who is in denial. My 2 cents.
__________________
Demand Jan Lokpal Bill

It is time to bring transparency and accountability to the system and install effective mechanisms to fight corruption.
aksstar no está en línea   Reply With Quote
Old June 4th, 2011, 04:52 AM   #1124
Yagya
ecrasez l'infame
 
Yagya's Avatar
 
Join Date: Oct 2010
Posts: 5,417

Quote:
Originally Posted by patrykus View Post
Let sums it up.

You bash me because I drawn some conclusions based on the information I got. You say these informations are not enough. And those informations were press article about this tower construction stop, and picture showing equipments being taken back from the site. If those informations are really not enough to express just even opinions (not stating facts), then just simply bring me more information. It's simple as that.

As for your last post, well this seems to be the case only in mumbai. Anywhere else in the world large projects like this gets always continues coverage.


Bash you up? lulz that was the nice way of saying stop being an annoying prick. If pics have to come they will. End of. There isn't an official confirmation that the work has stopped.

Yes It's Mumbai. It's different. That's why it's Mumbai. Deal with it.
__________________
Rajasthan|पधारो म्हारे देस...

In Realm Of The Senses
Yagya no está en línea   Reply With Quote
Old June 4th, 2011, 10:08 AM   #1125
patrykus
Registered User
 
patrykus's Avatar
 
Join Date: May 2008
Location: Poland
Posts: 3,778
Likes (Received): 1794

Ok, when emotions goes in, I guess its time to end the discussion.
patrykus no está en línea   Reply With Quote
Old June 4th, 2011, 04:51 PM   #1126
Jim856796
Registered User
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 8,943
Likes (Received): 843

Will the India Tower have either concrete or steel frame, or both?
__________________
I honestly think all development projects must be sustainable and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote
Old June 4th, 2011, 05:01 PM   #1127
sathya_226
DIPLOMAT
 
sathya_226's Avatar
 
Join Date: Mar 2006
Location: Maximum City!
Posts: 2,788
Likes (Received): 44

i guess it will be steel..........
sathya_226 no está en línea   Reply With Quote
Old June 4th, 2011, 05:20 PM   #1128
patrykus
Registered User
 
patrykus's Avatar
 
Join Date: May 2008
Location: Poland
Posts: 3,778
Likes (Received): 1794

This tower is very unique. I think the three cores will be concrete since it would be easiest to construct them with jumping forms, but floors itself changes its shape dramatically all the way up so I wouldn't be surprised if everything outside of the cores would be steel frame.
patrykus no está en línea   Reply With Quote
Old June 4th, 2011, 05:27 PM   #1129
Jim856796
Registered User
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 8,943
Likes (Received): 843

Though the underground floors have a concrete frame and what will they be used for?
__________________
I honestly think all development projects must be sustainable and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote
Old June 4th, 2011, 07:36 PM   #1130
IU
->
 
IU's Avatar
 
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,545

Some info on the tower's concrete and steel work + a better render of the tower from Doka's website

India Tower, Mumbai - 130 completely different casting sections


The India Tower in Mumbai will rank among the world’s tallest buildings. As on the Burj Khalifa before it, Doka’s high-performing SKE automatic climbing technology will set the pace on this project as well

Doka is underlining its strong market position in the high-rise sector with a slew of exceptional new projects that are all destined to join the list of the world’s tallest buildings. Among the next supertowers to rise with the aid of Doka climbing technology are the India Tower in Mumbai, the Lotte Super Tower in Seoul, the CMA Tower in Riyadh and the Lamar Towers in Jeddah. Join Doka on a trip that truly “reaches for the sky”: every week, a different project in this high-rise series will be presented exclusively on the Doka website.

With well over 100 storeys, the India Tower will rank among the tallest buildings anywhere in the world. Developer DB Hospitality has around 42 months in which to complete the hotel storeys, luxury apartments and retail space of this mixed-use development. To be sure of keeping to this tight timetable, the contractors hired only the world’s best – because in terms of the formwork-engineering challenge involved, the three CIP concrete cores of the India Tower will put even Burj Khalifa in the shade. Whereas the formwork on Burj Khalifa ‘only’ had to be readjusted every 30 storeys, on the India Tower the three cores taper continually and change their inclination four times in all – meaning that the formwork will need to be readjusted in every single storey. The over 130 casting sections in the vertical, all of them with different dimensions, thus mark a new formwork-technology world record – and an unprecedented challenge that will take some ‘rising to’. A further difficulty results from the need to incorporate massive steelwork for the slab floors and the exterior facade: these ‘superdiagonals’ (colossal steel-girder constructions of up to 2 m in diameter) have to be integrated into the CIP concrete cores in five different locations. However, the hard-won knowledge Doka gained on the Burj Khalifa helped it to devise an optimum solution for this building as well.

2785 m² of formwork and three concrete placing booms in a single lift

No fewer than 2785 m² of Large-area formwork Top 50 will have to climb hydraulically from one casting section to the next, with no crane assistance. To make the ‘CIPC core forming machine’ independent of the progress of work on the floor-slabs, the 3 concrete placing booms will also be directly integrated in the system. By the time the final climbing sections are reached, the formwork will comprise only a few hundred square metres. To adapt the formwork with no need for time-consuming modifications, telescoping platforms will be used. These can be pushed into one another (‘telescoped’) in a few simple steps, while any projecting formwork can be shortened by pre-planned segmentation of the elements in question.

173 automatic climbers SKE will serve as the lifting mechanism for the formwork, platforms and concrete placing booms. Some key details of the Doka formwork solution, such as the Shaft profile SKE100 (a combination of a rising scaffold and a bracket) and the steel-reinforced inside corners of the Large-area formwork Top 50, were developed during the 30-month forming assignment on Burj Khalifa. This optimised system has been designed to carry out the extraordinarily high number of casting steps reliably and in top quality.

The Doka project manager responsible here, Martin Hörlesberger, was in charge of the climbing formwork on the Burj Khalifa: “The entire progress of work on the building depends upon our ‘machine’ functioning smoothly. The decision to use the Doka SKE system means that the longest possible time will be left for that most labour-intensive of all jobs – installing the rebar.”
IU no está en línea   Reply With Quote
Old June 4th, 2011, 08:19 PM   #1131
deekshith
DELETED
 
deekshith's Avatar
 
Join Date: Oct 2010
Posts: 3,801
Likes (Received): 1764

Nice find Indiansunite
deekshith no está en línea   Reply With Quote
Old June 6th, 2011, 09:05 AM   #1132
Savz
Registered User
 
Join Date: Sep 2010
Posts: 1,334
Likes (Received): 121

awesome indianunite.....does that mean that the construction has not been stalled or is it?
Savz no está en línea   Reply With Quote
Old June 6th, 2011, 11:03 AM   #1133
Nishanth honnavalli
Joker
 
Join Date: Apr 2011
Posts: 42
Likes (Received): 0

Guys whateva there has been a big mess about this project...when you dont have balls y do you wanna build such a gigantic project and cancel it....so disappointing guys...
Nishanth honnavalli no está en línea   Reply With Quote
Old June 6th, 2011, 11:07 AM   #1134
sathya_226
DIPLOMAT
 
sathya_226's Avatar
 
Join Date: Mar 2006
Location: Maximum City!
Posts: 2,788
Likes (Received): 44

dont be get disappointed.... Almost all projects of this magnitude will always have hurdles in their way to completion.... Take any bigticket projects in the world, in all of them you will find atleast twice or thrice the news like projects on hold due to this and that will be heard....

Atleast this is U/C and there is no way can let it go as it is...

Dont worry this will be a reality and the thing is we all need to a bit more patient enough to see the end result...

Cheers...
sathya_226 no está en línea   Reply With Quote
Old June 8th, 2011, 01:54 PM   #1135
Nishanth honnavalli
Joker
 
Join Date: Apr 2011
Posts: 42
Likes (Received): 0

Yes hope your words become a reality...
Nishanth honnavalli no está en línea   Reply With Quote
Old June 8th, 2011, 02:20 PM   #1136
Coolguyz
Registered User
 
Coolguyz's Avatar
 
Join Date: Feb 2009
Posts: 10,121
Likes (Received): 14996

[IMG]

Uploaded with ImageShack.us
Coolguyz no está en línea   Reply With Quote
Old June 8th, 2011, 02:53 PM   #1137
sathya_226
DIPLOMAT
 
sathya_226's Avatar
 
Join Date: Mar 2006
Location: Maximum City!
Posts: 2,788
Likes (Received): 44

btw wots happening with the third wing of this buildiing?
sathya_226 no está en línea   Reply With Quote
Old June 8th, 2011, 03:05 PM   #1138
India101
Registered User
 
India101's Avatar
 
Join Date: Jul 2008
Posts: 10,689
Likes (Received): 2632

Thank you very much Coolguyz, what else did you see at the site? Much less activity seems to going on. Work looks to be going at a snails pace, hopefully it will pick up speed.

Also some positive news about DB Realty for once -

DB Realty FY11 cons net profit at Rs 299 cr, stock up 6%
DB Realty Net Profit Rises 19%
India101 no está en línea   Reply With Quote
Old June 8th, 2011, 03:25 PM   #1139
deekshith
DELETED
 
deekshith's Avatar
 
Join Date: Oct 2010
Posts: 3,801
Likes (Received): 1764

Thank you very much coolguyz. From next time onwards please upload/post pictures in 1024 by 768 pixel resolution.
deekshith no está en línea   Reply With Quote
Old June 8th, 2011, 03:51 PM   #1140
KuwarOnline
kuwaronline
 
KuwarOnline's Avatar
 
Join Date: Nov 2009
Location: Mumbai/Delhi
Posts: 4,221
Likes (Received): 890

great update as always
KuwarOnline no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:15 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu