daily menu » rate the banner | guess the city | one on oneforums map | privacy policy (aug.2, 2013) | DMCA policy | flipboard magazine

Go Back   SkyscraperCity > Continental Forums > Africa > General Forums > Business, Economy and Infrastructure

Business, Economy and Infrastructure Our architecture, infrastructure, transport, economy and other related discussions

Reply
 
Thread Tools
Old August 19th, 2010, 09:00 AM   #1
ufookoro
Registered User
 
ufookoro's Avatar
 
Join Date: Feb 2008
Posts: 662
Likes (Received): 3

West Africa: Gas - West African Project On Stream

West Africa: Gas - West African Project On Stream



The long-awaited plan of the West African Gas Pipeline Company (WAPCO) to supply gas to the Volta River Authority (VRA) through an alternative delivery point in Tema finally came on stream yesterday with the delivery of 60 million British thermal units (mmbtu) of free flow gas to the authority for power generation.

The VRA has concluded arrangement with the NGAS, marketers of WAPCO, to supply 35 million thermal units of gas out of the delivery to the Asogli Power Plant, which was completed a year ago but has remained idle because of lack of gas.



With the gas now flowing, the Asogli Power Plant will be able to generate 180 megawatts of energy to complement that of the VRA.

The acting Head of Public Relations of the VRA, Ms Bellona Gerard, told the Daily Graphic in Accra today that the supply of gas to the VRA generating plants in Tema meant that the authority would now be able to generate energy to meet total local demand and also take care of any technical emergencies and scheduled maintenance operations.



Until the delivery of gas to an alternative point in Tema, gas supplies were channelled directly to the authority's plants in Takoradi, which depend on gas and fuel for combustion and energy generation.

Currently, the national energy demand is 1,500 megawatts but the VRA is generating 1,650 megawatts while the Asogli Power Plant will provide additional 180 megawatts to bring the national total to 1830 megawatts.

The supply of gas to the VRA will be increased to 120 million standard cubit feet of compressed gas by the end of the year.

According to Mrs Harriet Wereko Brobby, Head of Corporate Affairs of the WAPCO, the increase in gas supply to the VRA would be made possible after the completion of the company's compressor station in Nigeria by the end of the year.



She explained that the WAPCO began firing gas to Ghana last year but was suspended because of technical hitches.

She said the company reactivated its supplies to the VRA in March, 2010 and indicated that the supply to an alternative delivery point in Tema, which was accomplished today, meant that the VRA had been able to convert its equipment to use gas and other energy forms.

Meanwhile, the generating unit of the VRA, Aboadze Thermal Plant, which exploded last July, has resumed full operations after the replacement of the burnt transformer at a cost of $2 million.

Relevant Links
Petroleum
Energy
Business
The explosion of the generating plant affected the output of the VRA by 110 megawatts.

Two plants of the generating unit, which depended on crude oil, have now been switched to the use of gas from WAPCO to reduce operational cost.

VRA, Aboadze and its sister company, Takoradi International Company (TICO), contribute a total of 550 megawatts to the country's energy needs.

The Director, Thermal Generation of VRA, Mr Richard Badger, told the Daily Graphic that currently all the units were available and had recovered the 110 megawatts of energy which were lost as a result of the explosion.

He said after the incident last month, officials of the plant conducted thorough examination of the remaining units to ensure that the systems were in perfect condition.
ufookoro no está en línea   Reply With Quote
Old August 19th, 2010, 06:53 PM   #2
popa1980
Registered User
 
Join Date: Apr 2007
Posts: 14,036
Likes (Received): 3406

So Ghana now has a surplus of electricity? Im a bit dubious about that claim but never mind.
popa1980 no está en línea   Reply With Quote
Old August 19th, 2010, 07:00 PM   #3
ufookoro
Registered User
 
ufookoro's Avatar
 
Join Date: Feb 2008
Posts: 662
Likes (Received): 3

Quote:
Originally Posted by popa1980 View Post
So Ghana now has a surplus of electricity? Im a bit dubious about that claim but never mind.
This may be coorect. There have always been issues of distribution and equipement failures to contend with. There is only one way. Up I think.
ufookoro no está en línea   Reply With Quote
Old August 19th, 2010, 09:26 PM   #4
popa1980
Registered User
 
Join Date: Apr 2007
Posts: 14,036
Likes (Received): 3406

I guess now that Ghana has its own gas this project was kind of a waste of time. But it didnt cost that much anyway and I wonder if they coudl extend it all the way up to Senegal, and across land into the Sahel nations. A region-wide gas network fuelled by Ghanaian and Nigerian gas. This would be a great project.
popa1980 no está en línea   Reply With Quote
Old August 20th, 2010, 08:26 AM   #5
ufookoro
Registered User
 
ufookoro's Avatar
 
Join Date: Feb 2008
Posts: 662
Likes (Received): 3

Quote:
Originally Posted by popa1980 View Post
I guess now that Ghana has its own gas this project was kind of a waste of time. But it didnt cost that much anyway and I wonder if they coudl extend it all the way up to Senegal, and across land into the Sahel nations. A region-wide gas network fuelled by Ghanaian and Nigerian gas. This would be a great project.
The project is not a waste. It will take a few years to pipe Ghana's Gas by product to the areas it is needed. The pipeline can be extended to to form an integrate pipeline infrastructure through out the sub-region that currently exist in the Western nations etc.
ufookoro no está en línea   Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:27 AM. • styleid: 14


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium