Old Yesterday, 06:10 AM   #15721
sunder.k
KA-MH-TN-PDY
 
Join Date: Jul 2012
Location: Bengaluru/Puduchery
Posts: 1,162
Likes (Received): 947

Quote:
Originally Posted by eralilebby View Post
Made a road trip to Srirangapatna station. Walked on the old MG bridge from Railway Level gate to Tippu's Armoury. Full work is going on the Paschimavahini River bed with an excavator digging two more pits on the bed alongside the newly constructed bridge. Also work was going on in full swing on the Cauvery South Bridge and the supervisor said it will be completed in 5 to 8 months. He said North bridge will be taken up by the same company shortly. Shifting Tippu's Armoury according to the same man is taken up by another company. What is heartening is that Bridge work is going on in full swing and we can derive from that the Armoury will be shifted shortly !

This demonstrates the decision making ability of the current Central Government. We had a real policy paralysis in the last 10 years before this govt came in. Heartening to note the developments.

Thanks eralilebby
__________________
Proud to be a Bharatiya
sunder.k no está en línea   Reply With Quote

Sponsored Links
 
Old Yesterday, 06:25 AM   #15722
sunil.kulkarni
Registered User
 
Join Date: Jan 2012
Posts: 4,609
Likes (Received): 2078

Quote:
Originally Posted by venkatreddy View Post
The Rayadurga-Tumkur line is already laid 40Km from Rayadurg and also another 20-30km land acquisition is completed in AP. So i do not think this line will be scrapped. But as there is no progress in Karnataka, this line might get changed as Rayadurga-Hindupur/Rayadurga-Penukonda.
This also proves SCR is more efficient in laying new tracks... SWR is worst here also :-(
__________________
Gulbarga/Kalaburagi Fourth Largest City Corporation in Karnataka
Gulbarga/Kalaburagi New Eduction Hub for North Karnataka
Gulbarga/Kalaburagi Mall City of North Karnataka
Gulbarga/Kalaburagi Land of Sufis, Sharanas
Gulbarga/Kalaburagi Land of Communal Harmony
Gulbarga/Kalaburagi Fastest Growing City in North Karnataka

venkatreddy liked this post
sunil.kulkarni no está en línea   Reply With Quote
Old Yesterday, 07:27 AM   #15723
Sunil.Biradar
Registered User
 
Join Date: Feb 2014
Location: Bangalore
Posts: 44
Likes (Received): 36

High-speed train: Chinese delegation to visit Mysuru


The team will study the feasibility of raising the speed limit on the Mysuru-Bengaluru-Chennai section.— PHOTO: M.A. SRIRAM


A high-level delegation of China Railway Eryuan Engineering Group Co. Ltd (CREEC) will visit Mysuru on November 27 to study the feasibility of raising the speed limit on the Mysuru-Bengaluru-Chennai section.
The technical team will carryout track inspection and collect data on November 28, for which the Mysore Railway Division has been directed to extend cooperation.
Sources in the South Western Railway told The Hindu over phone that the section has been identified as a high-speed corridor and High Speed Rail Corporation of India Ltd. has already signed an MoU with CREEC. The CREEC has been assigned the task of conducting field study, including survey and design work for raising the speed to 160 kmph along the corridor. The local authorities have been directed to provide technical details, apart from arranging a rear-window inspection car to the visiting delegation. Sources in the Railways said things have begun moving fast on the issue of increasing speed on the Mysuru-Bengaluru-Chennai section ever since the MoU was signed in September 2014.
Though members of HSRC conducted a preliminary inspection of the stretch between Mysuru and Bengaluru last month, there was scepticism that speeds of 160 kmph could be achieved on the section in view of track geometry and curvature.
With 135 curves of more than 5 degrees, the Railway officials had pointed out that a top speed of 160 kmph could be achieved only on an 8-km stretch in the entire corridor. Hence, it was mooted that using conventional technology with a little investment on tracks to reduce the curvature at 37 places, a speed of 130 kmph could be achieved to cover the 139-km distance in 75 minutes or less.


Source: http://www.thehindu.com/todays-paper...cle6634734.ece
Sunil.Biradar no está en línea   Reply With Quote
Old Yesterday, 07:48 AM   #15724
KPRAVEEN
Registered User
 
Join Date: Aug 2012
Location: Bangalore
Posts: 33
Likes (Received): 23

Quote:
Originally Posted by sunil.kulkarni View Post
This also proves SCR is more efficient in laying new tracks... SWR is worst here also :-(
SCR is efficient for sure. But this has nothing to do with that as the complete RDG-TK line falls under SWR. This is only because of AP local leaders efforts.

http://www.newindianexpress.com/stat...cle1287772.ece
__________________

sunil.kulkarni liked this post
KPRAVEEN no está en línea   Reply With Quote
Old Yesterday, 07:57 AM   #15725
KMFS
KMFS
 
Join Date: Nov 2011
Location: Shimoga
Posts: 408
Likes (Received): 77

Tippu's Armoury

In Bangalore-Mysore Doubling Project. This project is not designed honestly. No need to remove Tippu's Armoury.

Railways' are building Bridge near Tippu's Armoury that is totally wrong, they should build bridge (Left Side) other side of current bridge.

Some people want to remove Tippu's Armoury in any cost.


see in Google Earth if I am wrong.
KMFS no está en línea   Reply With Quote
Old Yesterday, 10:50 AM   #15726
eralilebby
Registered User
 
eralilebby's Avatar
 
Join Date: Sep 2010
Posts: 469
Likes (Received): 200

Quote:
Originally Posted by KMFS View Post
Tippu's Armoury

In Bangalore-Mysore Doubling Project. This project is not designed honestly. No need to remove Tippu's Armoury.

Railways' are building Bridge near Tippu's Armoury that is totally wrong, they should build bridge (Left Side) other side of current bridge.

Some people want to remove Tippu's Armoury in any cost.


see in Google Earth if I am wrong.
Too late to realign. The pillars of all bridges areover long time back and paschimavahini completed.The options at srirangapatana is limited. Please Google map the station and see. I don't see a political angle in everything. 70% of the tracks were completed in the previous regime. Its logical to complete balance 30% of which most of it is already completed.
__________________

Maitravaruna liked this post
eralilebby no está en línea   Reply With Quote
Old Yesterday, 01:57 PM   #15727
venkatreddy
Registered User
 
Join Date: Jan 2014
Location: Bellary / Houston
Posts: 130
Likes (Received): 68

Quote:
Originally Posted by sunil.kulkarni View Post
This also proves SCR is more efficient in laying new tracks... SWR is worst here also :-(
Sunil along with SWR even Karnataka govt is not taking any initiative for land acquisition. In AP almost 40% of the work is completed and another 20-30% of land acquisition is completed. This was due to the effort of former revenue minister of AP who took lot of interest.

But in Karnataka there is no land acquisition for this project. If Karnataka Govt had also shown the same interest, nearly 40-50 km work have been completed in Karnatak also.
__________________

sunil.kulkarni, gururaja liked this post
venkatreddy no está en línea   Reply With Quote
Old Yesterday, 03:11 PM   #15728
KMFS
KMFS
 
Join Date: Nov 2011
Location: Shimoga
Posts: 408
Likes (Received): 77

Quote:
Originally Posted by eralilebby View Post
Too late to realign. The pillars of all bridges areover long time back and paschimavahini completed.The options at srirangapatana is limited. Please Google map the station and see. I don't see a political angle in everything. 70% of the tracks were completed in the previous regime. Its logical to complete balance 30% of which most of it is already completed.
If you need 160KM per hour speed Train run via Srirangapatna you should built New bridge backside of Fort as straight. you cant run 160KM per hour speed train in current curve.


see in Google Earth if I am wrong.

whoever design this doubling project they are not Engineers, they are like Plumbers. I am SURE.

Last edited by KMFS; Yesterday at 03:17 PM.
KMFS no está en línea   Reply With Quote
Old Yesterday, 05:20 PM   #15729
engineer.akash
Citizen of the milky way
 
engineer.akash's Avatar
 
Join Date: Oct 2008
Location: Antriksh Nivasi
Posts: 31,316
Likes (Received): 3195

Mysuru-chennai needs to be covered in less than 5 hours!
__________________
LOVE INDIA SERVE INDIA

Fact of the week:
CFTRI Mysuru one of a kind institute will prepare food packets for India's manned space missions

TIER TWO CITIES RAKSHAK
engineer.akash no está en línea   Reply With Quote
Old Yesterday, 06:55 PM   #15730
sfs
Registered User
 
Join Date: May 2010
Location: Bangalore
Posts: 1,180
Likes (Received): 1115

Shivani station new platform and new building

Look at the 0:11 sec. The road cutting through the railway platform. Wondering how I missed it all these days..



RUB work at Hosadurga road station

__________________

MysoreOne, sunil.kulkarni liked this post
sfs no está en línea   Reply With Quote
Old Yesterday, 07:01 PM   #15731
sfs
Registered User
 
Join Date: May 2010
Location: Bangalore
Posts: 1,180
Likes (Received): 1115

Hosadurga - Chikkajajuru doubling

Looking at the progress, it may get completed by March 2015, although initial deadline was March 2016. Track laying of entire stretch is progressing well except some short patches.





__________________

sunil.kulkarni liked this post

Last edited by sfs; Yesterday at 07:08 PM.
sfs no está en línea   Reply With Quote
Old Yesterday, 07:05 PM   #15732
sfs
Registered User
 
Join Date: May 2010
Location: Bangalore
Posts: 1,180
Likes (Received): 1115

contd...........



__________________

sunil.kulkarni, sunder.k liked this post
sfs no está en línea   Reply With Quote
Old Today, 06:28 AM   #15733
gentem
────✩
 
gentem's Avatar
 
Join Date: Apr 2010
Posts: 8,098

Quote:
Originally Posted by KMFS View Post
Tippu's Armoury

In Bangalore-Mysore Doubling Project. This project is not designed honestly. No need to remove Tippu's Armoury.

Railways' are building Bridge near Tippu's Armoury that is totally wrong, they should build bridge (Left Side) other side of current bridge.

Some people want to remove Tippu's Armoury in any cost.


see in Google Earth if I am wrong.
but that would have required demolition of existing railway station and rebuilding.. as track would come on other side
gentem no está en línea   Reply With Quote
Old Today, 08:51 AM   #15734
KMFS
KMFS
 
Join Date: Nov 2011
Location: Shimoga
Posts: 408
Likes (Received): 77

Quote:
Originally Posted by sunil.kulkarni View Post
Good question even i had this in mind... based on newspaper only one can guess which are those... may be as below (still not confirmed)

- Bangalore-Satyamangalam ??
- Kottipalli-Narsapur ??
-

Issues of Land acquistions projects
- Tumkur-Rayadurga ( I had thought this was going at good speed) :-(
- Tumkur- Durga-Davangere ??
- Harihari-Shimoga ??

Rest the newspaper do not talk much of other projects...
SWR Zonal Manager should write letter to CM requesting of Land, also he should send reminder every month. but he is sleepy, in same time our CM should take action for Land acquiring or replying to SWR.

They should wake up.
KMFS no está en línea   Reply With Quote
Old Today, 09:52 AM   #15735
eralilebby
Registered User
 
eralilebby's Avatar
 
Join Date: Sep 2010
Posts: 469
Likes (Received): 200

Quote:
Originally Posted by gentem View Post
but that would have required demolition of existing railway station and rebuilding.. as track would come on other side
And Ranganathaswamy Temple will also come in the way. Even with the current alignment ASI had a lot of objections since no railway track should come 100 meters near a heritage building since the vibration from the trains would harm it. Obviously there must have been a compulsion for the current alignment or maybe railways underestimated the ego of people at the helm of ASI and went ahead with the bridge construction even before approval from them.
eralilebby no está en línea   Reply With Quote
Old Today, 09:56 AM   #15736
gururaja
Registered User
 
Join Date: Mar 2014
Posts: 45
Likes (Received): 38

Western Railway on Friday will mark 150 years of its rail line entering Mumbai. It was on November 28, 1864, when the first Bombay Baroda and Central India (BB&CI) train on the western coastal lines of Bombay (now Mumbai) chugged into Grant Road station from Ahmedabad in Gujarat.WR archives show that for its return journey, the train left Grant Road at 7am and reached Ahmedabad at 5pm the next day. In the Up direction on its way to Bombay, the train left Ahmedabad at 7am and arrived at Grant Road station at 5.30pm the next day.The long journey is attributed to the trains in both directions running only up to Surat on the first day. The train would reach Surat around 5pm and leave for the next leg of the journey around 7am the next day. There was a refreshment room and Traveller's Bungalow at Surat for passengers who needed to go beyond the city.An interesting anecdote from WR archives shows that because during those days the Narmada bridge was not built, there was a boat which ferried passengers across the river. First-class passengers had to pay six annas, second-class three annas, and third-class one anna for the boat ride. On either side of the river, there were palkees or shigrams for first- and second-class passengers for an extra Rs2 per passenger.
WR now runs about 60 trains between these two centres of trade and business, with some of its prestigious trains, including Shatabdi Express, Duronto Express, and AC Double Decker Express running on the Mumbai-Ahmedabad route.
WR, in its present form, came into existence on November 5, 1951, with the merger of its forerunner, the BB&CI, with other state railways — Saurashtra, Rajputana and Jaipur.
__________________

sunder.k liked this post
gururaja no está en línea   Reply With Quote
Old Today, 04:02 PM   #15737
suryan
Registered User
 
Join Date: Aug 2014
Location: Deccan Queen
Posts: 148
Likes (Received): 26

Xposting

Any news regarding the renovation of Ernakulam terminus station? Kochi badly needs a 8 - 10 platform international standard station. Once the station is upgraded, few trains from Coimbatore & Mangalore can be extended till Kochi.

http://www.skyscrapercity.com/showth...05946&page=521
suryan no está en línea   Reply With Quote
Old Today, 04:54 PM   #15738
avi mangalore
Registered User
 
Join Date: Nov 2009
Posts: 12,171
Likes (Received): 4988

Quote:
Originally Posted by suryan View Post
Xposting

Any news regarding the renovation of Ernakulam terminus station? Kochi badly needs a 8 - 10 platform international standard station. Once the station is upgraded, few trains from Coimbatore & Mangalore can be extended till Kochi.

http://www.skyscrapercity.com/showth...05946&page=521
The above news is not related to this thread..
avi mangalore no está en línea   Reply With Quote
Old Today, 06:08 PM   #15739
sfs
Registered User
 
Join Date: May 2010
Location: Bangalore
Posts: 1,180
Likes (Received): 1115





Source: Udayavani, Davanagere edition
sfs no está en línea   Reply With Quote


Reply

Tags
karnataka

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:45 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu