Old July 21st, 2017, 01:08 AM   #621
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48

Quote:
Originally Posted by svaerd firemanska View Post
jadi 2 terowongan ya?

iya sepertinya bakal dibikin 2 terowongan ,
radiansyah no está en línea   Reply With Quote

Sponsored Links
Old July 21st, 2017, 01:10 AM   #622
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48



sumber : https://www.instagram.com/p/BOO3eIcj...gged=cisumdawu
__________________
radiansyah no está en línea   Reply With Quote
Old July 25th, 2017, 05:24 AM   #623
jalinsum
Registered User
 
Join Date: Oct 2012
Location: Batam - Pangkalpinang PP
Posts: 10
Likes (Received): 2

Quote:
Originally Posted by radiansyah View Post
Kereen euy, ntar mampir ahhh
__________________

reyan.tm liked this post
jalinsum no está en línea   Reply With Quote
Old July 25th, 2017, 06:35 AM   #624
spetznaz_kdi
Registered User
 
Join Date: Jun 2008
Posts: 1,572
Likes (Received): 154



Awas dibilang alay...
spetznaz_kdi no está en línea   Reply With Quote
Old July 28th, 2017, 01:05 AM   #625
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48

radiansyah no está en línea   Reply With Quote
Old July 28th, 2017, 01:13 AM   #626
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48

__________________

svaerd firemanska liked this post
radiansyah no está en línea   Reply With Quote
Old July 28th, 2017, 06:24 PM   #627
spetznaz_kdi
Registered User
 
Join Date: Jun 2008
Posts: 1,572
Likes (Received): 154

Sekarang kontraktor lokal semakin mahir bikin terowongan, mulai dari MRT, terowongan double track, terowongan Cisumdawu. Ke depan sepertinya bikin infrastruktur transportasi klo ketemu gunung langsung gali, gak perlu lagi muter atau cutting...
__________________

agungsetiawan24, radiansyah liked this post
spetznaz_kdi no está en línea   Reply With Quote
Old July 29th, 2017, 01:15 AM   #628
Cakwan
Registered User
 
Join Date: Jun 2009
Location: Lamongan-Gresik-Surabaya-Sidoarjo
Posts: 735
Likes (Received): 277

Quote:
Originally Posted by spetznaz_kdi View Post
Sekarang kontraktor lokal semakin mahir bikin terowongan, mulai dari MRT, terowongan double track, terowongan Cisumdawu. Ke depan sepertinya bikin infrastruktur transportasi klo ketemu gunung langsung gali, gak perlu lagi muter atau cutting...
Jangan lupa terowongan KA Karangkates yang sudah lama ada
Yang sedang dikerjakan sekarang juga ada Jalur KA Double track Kebasen.

Kalau soal metode yang dipakai seperti cut fill atau terowongan pasti sudah dihitung dulu mana yang lebih menguntungkan.
__________________
Indonesia Maju 2045. 100 Tahun Indonesia Merdeka. Hiduplah Indonesia Raya!
semoga lebih cepat :)
Cakwan no está en línea   Reply With Quote
Old July 29th, 2017, 12:13 PM   #629
ferindo
Registered User
 
ferindo's Avatar
 
Join Date: Nov 2011
Location: unidentified
Posts: 914
Likes (Received): 144

Itu terowongan cisumdawu, semua jalur jdi satu terowongan ya? Tdk sendiri - sendiri?
ferindo no está en línea   Reply With Quote
Old July 29th, 2017, 12:57 PM   #630
BRItama
A.S.A.P
 
BRItama's Avatar
 
Join Date: Jul 2013
Location: Pku - jog - sub - pku
Posts: 441
Likes (Received): 69

ada dua terowongan sepertinya untuk masing-masing jalur
BRItama no está en línea   Reply With Quote
Old July 29th, 2017, 03:10 PM   #631
rilham2new
Obsolete User
 
Join Date: Oct 2006
Location: Jakarta, Pekanbaru, Tangerang
Posts: 32,159
Likes (Received): 1061

Quote:
Originally Posted by spetznaz_kdi View Post
Jangan terlalu prasangka lah. Orang kantoran juga klo ketemu lokasi yg unik seperti itu juga ada yang berenti trus foto2... Gak percaya? Nanti klo dah operasional kita lihat, ada mobil plat D/B yang bertenti gak...
Loh, alay gak boleh punya mobil berplat D/B??? Alay comes in many form haha.
__________________
Been in SSC for 10 years now. I'm old.
rilham2new no está en línea   Reply With Quote
Old August 3rd, 2017, 10:15 PM   #632
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48

radiansyah no está en línea   Reply With Quote
Old August 3rd, 2017, 10:15 PM   #633
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48

radiansyah no está en línea   Reply With Quote
Old August 8th, 2017, 08:21 PM   #634
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48

Update Terowongan Cisumdawu

radiansyah no está en línea   Reply With Quote
Old August 10th, 2017, 05:33 PM   #635
Kenat
Registered User
 
Kenat's Avatar
 
Join Date: Jun 2016
Location: jakarta
Posts: 540
Likes (Received): 301

__________________
Kenat no está en línea   Reply With Quote
Old August 11th, 2017, 04:57 PM   #636
jurig.irian
***** Member
 
jurig.irian's Avatar
 
Join Date: Dec 2015
Location: Nomaden
Posts: 181
Likes (Received): 79

Quote:
Originally Posted by Kenat View Post
jembatan payindangan
__________________
BEKERJALAH SEPERTI TUYUL
GA HARUS KELIATAN, GA BUTUH PUJIAN, GA GILA JABATAN, GA USAH CARI PERHATIAN
TAPI HASILNYA JELAS
jurig.irian no está en línea   Reply With Quote
Old August 16th, 2017, 06:35 PM   #637
radiansyah
Registered User
 
radiansyah's Avatar
 
Join Date: Oct 2016
Location: Bandung
Posts: 160
Likes (Received): 48

Terowongan Jalan Tol Cisumdawu Ditargetkan Rampung 2018
Rabu 16 Agustus 2017, 20:34 WIB

Quote:
BANDUNG, (PRFM) - Pembangunan terowongan Jalan Tol Cileunyi-Sumedang-Dawuan (Cisumdawu) akan didirikan sebanyak dua terowongan (dual tube) dengan masing-masing panjangnya 472 meter dan berdiameter 14 meter.

Kepala Satuan Kerja Tol Cisumdawu, Wida Nurfaida menuturkan, total panjang jalan tersebut sekira 944 meter.

Adapun lokasi tepatnya berada di Dusun Cilangsar, Desa Cigendel, Kecamatan Pamulihan, Kabupaten Sumedang.

"Tunnel project ini memakan biaya sekira Rp 700 Miliar, melalui APBN," ujar Wida seperti dilaporkan wartawan Kabar Priangan, Rabu (16/8/2017).

Sebelumnya pembangunan terowongan baru sepanjang 50 meter ditargetkan rampung September 2019. Namun, sesuai arahan pemerintah pusat maka pembangunan dipercepat dan selesai 2018.


Sumber : http://prfmnews.com/berita.php?detai...n-rampung-2018
radiansyah no está en línea   Reply With Quote
Old August 17th, 2017, 02:03 AM   #638
svaerd firemanska
Registered User
 
svaerd firemanska's Avatar
 
Join Date: Aug 2013
Location: Pekalongan & Jakarta
Posts: 6,748
Likes (Received): 1689

Dari panjang tunnel 472 meter dan memiliki dua tube (terowongan) ada sekitar 1 hektare (ha) lahan warga yang belum terbebaskan tepatnya di Desa Cigendel, Kecamatan Pamulihan.

https://finance.detik.com/berita-eko...ha-belum-bebas
__________________
"Bertanyalah kepadaku dan akan kuceritakan dunia".
"The Book Philosophy"



svaerd firemanska no está en línea   Reply With Quote
Old August 17th, 2017, 03:38 AM   #639
raihanfagi
Registered User
 
raihanfagi's Avatar
 
Join Date: Oct 2015
Location: Pati-Jatinangor
Posts: 56
Likes (Received): 14

Ini tol yang sangat dinantikan bagi mahasiswa di Jatinangor karena adanya tol ini diharapkan bisa mengurai jalur Jatinangor-Tanjungsari-Sumedang yang begitu padat

Semoga ketika selesai masih bisa merasakan manfaat tol ini di Jatinangor...
Quote:
Terowongan Tol Cisumdawu Terkendala Lahan, 1 Ha Belum Bebas
Quote:
Bandung - Pembangunan tunnel atau terowongan tol Cileunyi Sumedang Dawuan (Cisumdawu), Kabupaten Sumedang, Jawa Barat masih terkendala pembebasan lahan. ini dikatakan oleh Kasatker Tol Cisumdawu, Wida Nurfarida, saat melakukan peninjauan lokasi pembangunan tunnel di Proyek Tol Cisumdawu, Sumedang, Jawa Barat, Rabu (16/8/2017).

Dari panjang tunnel 472 meter dan memiliki dua tube (terowongan) ada sekitar 1 hektare (ha) lahan warga yang belum terbebaskan tepatnya di Desa Cigendel, Kecamatan Pamulihan.

"Lahan sulit dibebaskan, yang belum dibebaskan sekitar 1 hektare yang ditempati sembilan KK, kami sudah komunikasi dengan BPN Sumedang, janjinya awal Bulan September sudah terbayar," kata Wida.

Dari dua tube yang akan dibangun untuk melengkapi rangkaian ruas jalan Tol Cisumdawu sepanjang 60,5 kilometer, kini satu tube tunnel yang dibangun pasalnya pembangunan tube tunnel yang kedua terkendala oleh pembebasan lahan.

Tube kedua akan dibangun di sebelah tube tunnel yang sudah terlebih dahulu dibangun. Jika lahan sudah dibebaskan maka pembangunan tunnel tube kedua sudah dapat dilakukan.

"Satu trowongan (tunnel) selesai Februari 2019, tapi kita harus percepatan. Dari pimpinan berharap lebaran tahun depan harus ada yang tembus satu," ucap Wida.

Wida berujar, kesulitan lainnya yang kerap ditemui dalam pembangunan tunnel tersebut yaitu bebatuan yang tertanam di dalam tanah.

"Batu yang berada di dalam tanah tersebut mengganggu pengerukan, harus dipecahkan dulu lalu di keruk lagi. Risikonya tinggi, soalnya pengerjaannya dilakukan manual dahulu," ujarnya.

Wida mengungkapkan, masih banyak bebatuan yang berada di dalam tanah pembangunan tunnel Tol Cisumdawu, meski begitu pembangunan tunnel aman, tidak ada patahan.

"Pembangunan tunnel ini menghemat lahan dan tidak merusak lingkungan. Dalam pengerjaannya selalu didampingi konsultan geologis, karena didalammnya tidak ada yang tahu. Kalau kedalaman sedikit gampang, kalau kedalamanmya semakin dalam risikonya akan semakin tinggi risikonya," jelas Wida.

Konsultan geologis tersebut memiliki tugas pedampingan pembangunan karena jika ada pergerakan tanah saat dilakukan pembangunan, apa yang harus dilakukan pekerja, karena tidak bisa main-main pekerjaannya.

"Selain itu, kami juga memperhatikan kaidah sfesifikasi teknis dalam pembangunan, seperti pentilasi udara, conectting antara dua tunnel takutnya ada kebutuhan emergency, drainase dan penerangan," pungkas Wida.

Progres terowongan

Pembangunan terowongan tersebut dilakukan oleh kontraktor asal China, Metallurgy Corporation of China (MCC) yang berlangsung sejak Desember Tahun 2016 lalu. Panjangnya 472 meter dan memiliki dua tube (trowongan) yang setiap tubenya memiliki diameter 14 meter yang dapat digunakan untuk dua lajur kendaraan melengkapi rangkaian ruas jalan Tol Cisumdawu sepanjang 60,5 kilometer.

"Pengerjaan tunnel dilakukan dari Desember tahun lalu dan kini pengerjaannya baru 40 meter dan sedikut lagi 50 meter," jelas Wida

Wida mengungkapkan, untuk keseluruhan pembangunan proyek Tol Cisumdawu pada kontrak Fase II sudah mencapai 11 persen. "Target sesuai kontrak Bulan September 2019, tapi sesuai arahan pimpinan kami harus mengerjakan lebih cepat sebelum akhir tahun 2019," ungkapnya

Wida menambahkan, hingga saat ini pembangunan tunnel di Proyek Tol Cisumdawu berjalan dengan lancar. Jika dilihat dari kondisi tanah masih baik, diharapkan terus seperti itu agar membantu percepatan pembangunan tunnel.

"Ini terowongan jalan tol pertama di Indonesia yang dibangun dengan metode pengeboran New Austrian Tunneling Method. Metodenya sendiri dengan galian yang menggunakan alat ekskavator," tambahnya.

Proyek tol yang dilakukan peletakan batu pertama oleh Menteri Pekerjaan Umum Djoko Kirmanto dan Gubernur Jawa Barat Ahmad Heryawan akhir tahun 2011 silam itu, menghubungkan Kabupaten Bandung-Sp umedang-Majalengka.

Wida berujar, selain di Tol Cisumdawu, terowongan serupa juga di Cina dan Malaysia. Proyek tol Cisumdawu ini menelan biaya hingga Rp 700 miliar. (hns/hns)

https://finance.detik.com/berita-eko...ha-belum-bebas




raihanfagi no está en línea   Reply With Quote
Old August 17th, 2017, 06:04 AM   #640
ptt76
Registered User
 
Join Date: Jan 2017
Location: Sumpiuh - Kebumen
Posts: 507
Likes (Received): 343

Pembangunan tunnel atau terowongan tol Cileunyi Sumedang Dawuan (Cisumdawu), Kabupaten Sumedang, Jawa Barat masih terkendala pembebasan lahan. Halini dikatakan oleh Kasatker Tol Cisumdawu, Wida Nurfarida, saat melakukan peninjauan lokasi pembangunan tunnel di Proyek Tol Cisumdawu, Sumedang, Jawa Barat, Rabu (16/8/2017).
Foto : Mengintip Proyek Terowongan Tol Cisumdawu












Source : https://m.detik.com/finance/foto-bis...-tol-cisumdawu
__________________

Alarvas liked this post
ptt76 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 12:57 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu