daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Asian Forums > India > South > South India Projects > Karnataka



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old Yesterday, 03:51 AM   #15421
eralilebby
Registered User
 
eralilebby's Avatar
 
Join Date: Sep 2010
Posts: 462
Likes (Received): 196

I traveled to Bangalore by Chamundi Express yesterday (22-10-2014) and on 16-16-2014 and both times the train was late by an hour. Yesterday it left on time at 6.45, stopped at Naganahalli, Byadarahalli before reaching Mandya @ 8.00, 30 minutes late. Made up time after that it stopped at Hejjalla, Nayandahalli, Binny Mill outer before crawling into Bangalore city @ 10.30, 1 hour late.It took 3.hours 45 minutes to cover the distance which a passenger does in 3.15 minutes. In the reverse direction Tippu left 10 minutes late but arrived at the outer 5 minutes ahead and into Mysore station smack on time.

As regards doubling I think from what I observed, the Railways are planning on single track @ Srirangapatna with signals at either end of the bridges till they can shift the armoury. Work is going on at full swing everywhere and likely hood of completion by 2015 is very high.

As regards electrification, no work beyond Settihalli is seen. Since doubling has been completed beyond Mandya upto Yeliyur and 90 % work is complete in the remaining section and alignment firmed up, work can be started now so it can be completed simultaneously with doubling. Sub Station work is progressing at Bidadi.

Hope our Railway Minister who is from our state will expedite the works and finish it atleast by the revised schedule of March 2015.
__________________

sunder.k liked this post
eralilebby no está en línea   Reply With Quote

Sponsored Links
 
Old Yesterday, 08:38 AM   #15422
sunder.k
Sunder
 
Join Date: Jul 2012
Location: Bengaluru/Puduchery
Posts: 1,006
Likes (Received): 798

New features in 139

II. NEW FEATURES OF INTEGRATED TRAIN ENQUIRY SYSTEM (139)





http://www.sr.indianrailways.gov.in/...3CE8464.web107

The Integrated Train Enquiry System (139), introduced during 2007, is a very useful system providing train related information such as accommodation availability, current status of PNR, etc. to passengers instantly.Passengers have found this system to be very helpful.





In the recent past, new facilities such as ‘Spot your train’, ‘Mobile based destination arrival alerts’ and ‘Mobile based alarm alerts’have been added to this system.





The ‘Mobile based Destination Arrival Alerts’ is now available o­n SMS / IVR / Agent assistance through 139. This facility helps passengers o­n Indian Railways to set an alert / pre-information call before they reach their destination.





‘Spot your train’, yet another helpful facility, is also available through 139.This facility helps o­ne to know the exact location of a train.Passengers can make use of these facilities to get additional information and services.
sunder.k está en línea ahora   Reply With Quote


Reply

Tags
karnataka

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 02:46 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu