daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > World Forums > Infrastructure and Mobility > Railways

Railways Heavy rail: Intercity, Commuter and Freight


Reply

 
Thread Tools Display Modes
Old February 8th, 2013, 07:43 PM   #1
1772
Registered User
 
1772's Avatar
 
Join Date: Aug 2009
Posts: 2,233
Likes (Received): 34

MISC | Underground-to-Ground Station question

I guess this is a question for the mathematicly gifted readers on this forum.

On this blueprint of a station, you see the platforms are at street level, but when exiting the station, the trains go into an underground tunnel.

Now, the question is, how long does the climb between platform and tunnel need to be, to make it comfortable/unnoticeable.



Symbols:

S = Station
E = Entrance
P = Platform (about 400 meters long so you get the scale of things).
T = Tunnel
1772 no está en línea   Reply With Quote

Sponsored Links
 
Old February 8th, 2013, 08:04 PM   #2
KingNick
Wiener Blut
 
KingNick's Avatar
 
Join Date: Sep 2010
Posts: 2,949
Likes (Received): 1660

Well I'd say everything under a 25 ‰ is comfortable. So considering the average height of catenaries (5,5 m), plus some earth between the tunnel and the buildings over the tunnel 15 meter altitude difference should be the minimum.

Considering all these assumptions the tunnel has to be 600,19 Meters long.
KingNick no está en línea   Reply With Quote
Old February 8th, 2013, 08:27 PM   #3
1772
Registered User
 
1772's Avatar
 
Join Date: Aug 2009
Posts: 2,233
Likes (Received): 34

Quote:
Originally Posted by KingNick View Post
Well I'd say everything under a 25 ‰ is comfortable. So considering the average height of catenaries (5,5 m), plus some earth between the tunnel and the buildings over the tunnel 15 meter altitude difference should be the minimum.

Considering all these assumptions the tunnel has to be 600,19 Meters long.
You mean, the railway between the platform and the tunnel needs to be 600 meters?
1772 no está en línea   Reply With Quote
Old February 9th, 2013, 11:40 AM   #4
KingNick
Wiener Blut
 
KingNick's Avatar
 
Join Date: Sep 2010
Posts: 2,949
Likes (Received): 1660

The climb as such has to be 600,19 meters long.
KingNick no está en línea   Reply With Quote
Old February 9th, 2013, 04:27 PM   #5
Silver Swordsman
Registered User
 
Join Date: Nov 2011
Posts: 253
Likes (Received): 5

It fully depends on the power/weight ratio of the trainset used on the line. Freight trains can take a 1% grade at maximum, while HSR and light rail can take 3-4%. If we're looking at a 4% grade, and a 19m height difference, 4/100=19/x; 1/25=19/x; x=19*25; x= 475

Since 4% is very steep for a train, it is safe to assume that 500m-600m is probable.
__________________
My Virtual-Model Railroad: High Speed Rail in RCT3
Project Anniversary: Click Here
Silver Swordsman no está en línea   Reply With Quote
Old February 10th, 2013, 04:58 PM   #6
1772
Registered User
 
1772's Avatar
 
Join Date: Aug 2009
Posts: 2,233
Likes (Received): 34

600 semes to be the consensus. Thanks!
1772 no está en línea   Reply With Quote
Old February 10th, 2013, 08:44 PM   #7
chornedsnorkack
Registered User
 
Join Date: Mar 2009
Posts: 2,603
Likes (Received): 25

A consensus pulled out of ass.

Height: depends on what is built over the tunnel.

The tunnel itself needs to be anywhere 5 and 7 m, depending on the loading gauge of the railway. US piggybacking and double stacked containers mean 6 m height of trains themselves, plus a metre for catenary and clearance to ceiling. Many passenger railways elsewhere, however, are limited to about 4 metre height.

Then there is whatever is above. If it is streets restored after railway building by cut and cover, or new buildings designed over the tunnel - less than a metre ceiling thickness. If it is existing buildings... then you have basements, pile foundations, space for works to support basements during excavation, or bedrock roof... a lot.
The ruling gradients of railways vary widely. Many passenger and freight railways demand low ruling gradients to haul long trains by weak locomotives. Whereas many high-speed railways have powerful engines with distributed traction, and therefore also tolerate high gradients.

Finally, on such short slopes, much of the distance will be taken up by transition curves and vertical curvature limits.
chornedsnorkack no está en línea   Reply With Quote
Old February 11th, 2013, 12:19 AM   #8
Tom 958
Registered User
 
Tom 958's Avatar
 
Join Date: Apr 2007
Location: near Atlanta
Posts: 581
Likes (Received): 7

Quote:
Originally Posted by chornedsnorkack View Post
Finally, on such short slopes, much of the distance will be taken up by transition curves and vertical curvature limits.
Indeed. If the maximum grade is 4% and a 15m difference in elevation is required, the vertical curves will push the total length of the grade well beyond 600m. This:



isn't a very accurate depiction. Probably the ends of the vertical curves would be about where the P and T are, equidistant from the midpoint of the grade as drawn.

That said, it might be that agencies sometimes tolerate grades that are nominally in excess of the maximum, since in a situation like this, there'd be only a single, theoretical point at which the maximum grade is reached before the grade flattens out again. Whether that's done or not, I don't know. But it's likely that it is. And it's fun to ponder.
Tom 958 no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 09:37 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 21.43%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu