The real Kwai killed over 1.50 lakh Tamils Story of enslaved labour in Japanese railway project between 1940 & 1942
Author: B. Kolappan



CHENNAI: It may not be The Bridge on the River Kwai, but this documentary on the tragic death of over 1.5 lakh Tamil workers is more real than the Oscar-winning David Lean film.
What the 1957 film does not tell, this one does: the story of over two lakh Tamil emigrants from Malaysia and Burma, who were forced to labour between 1940 and 1942 on a 415 km.-railway track between Thailand and Burma (Myanmar), including a bridge on the Kwai, as part of Japan’s Greater Asia plan.
A new documentary titled Siam-Burma: Marana Railpathai (Thailand-Burma: The Death Railway) by Puducherry-based academician R. Kurinjivendan sheds light on the dark event. The hour-long film will be screened at R.K.V. Studios in Chennai on Saturday.
“The Japanese estimated that it would take five years to complete the project. If it was over in 15 months, you can imagine how these poor workers toiled to lay the track and a road alongside,” said Mr. Kurinjivendan, an assistant professor at the Arignar Anna Arts and Science College, Karaikal.
Only 35,000 returned, as per a British census after World War II, indicating that over 1.50 lakh Tamils perished. They fell victim to snakes and insects, cholera, malaria and Beriberi. “Some of them committed suicide, unable to bear the burden and the Japanese torture,” says the academician, who began his project in 2002-03. Though many communities, including Mukkulathor and Gounder, migrated, the majority were Dalits from Chengalpattu and North Arcot, he found.
__________________
கன்னியாகுமரி மாவட்டம் : “கடவுளின் செல்லக்குழந்தை!”

metro lover liked this post
edwardjeni no está en línea   Reply With Quote
Old August 27th, 2016, 06:47 AM   #22782
edwardjeni
Edward Jeni
 
Join Date: Aug 2012
Location: Kanyakumari
Posts: 2,987
Likes (Received): 661



Ramps near rail track to reduce elephant deaths
Author: V.S. Palaniappan

COIMBATORE: In a bid to eliminate incidence of elephant deaths on tracks, the Forest Department has started constructing ramps on either side of the track B on the Madukkarai–Walayar section of the Coimbatore–Palakkad line. The facility will be ready in 15 days.
Since 1978, 17 elephants had died in 12 accidents along the 16.25-km-long track A and 18-km-long track B along the stretch of Podanur–Palakkad section. After a couple of elephant deaths in the last two months, a study of the accident-prone spots and the behavioural pattern of the jumbos was taken up through camera trap images.
Elephants were found to be crossing the railway track to reach a water body. In addition, the 25-ft elevation on both sides of the track forced the jumbos to slow down on the track and ascend or descend the gradient, said A. Periasamy, Divisional Forest Officer.
The ramps will provide a gentle slope making it easy for animals to climb and descend from the height, he says. ACC cements at Madukkarai has offered to provide cement waste for forming the base for the ramp which will be constructed at a cost of Rs. 6 lakh.
On completion of the ramps, cameras will be installed to study the behavioural pattern of the elephants. Based on feedback, a decision would be taken on constructing ramps at other vulnerable stretches with improvements and modifications if required, he said.

Water trough near hills

The Forest Department is also creating a water trough near the hills. This will prevent or reduce instances of elephants crossing the track to reach the water body, the DFO said.
Palakkad Division of Southern Railway has already cleared vegetation on the sides of the track at curves to enhance visibility for the loco pilot. A request has been made to clear the vegetation along the tracks for a further distance of 3 km, Mr. Periasamy said. The number of boards alongside the tracks to caution loco pilots to slow down is also being increased, he added.
__________________
கன்னியாகுமரி மாவட்டம் : “கடவுளின் செல்லக்குழந்தை!”

sunder.k liked this post
edwardjeni no está en línea   Reply With Quote
Old August 27th, 2016, 06:52 AM   #22783
vbjagan
Registered User
 
Join Date: Jun 2010
Location: Trichy/Chennai/Bengaluru
Posts: 1,360
Likes (Received): 2383

Quote:
Originally Posted by AIRBUS-A310 View Post
[B]Special Train to VELANKANNI


First LHB coaches train to DELTA
This is the second year (time) LHB spls have been planned to velankanni. Last year around the same month, happened to see a LHB Spl from Mumbai (Bandra i remember) to Velankanni at MS operated by CR.

I think this is the first time LHB spls are operated via Konkan route to Velankanni
__________________

AIRBUS-A310 liked this post
vbjagan no está en línea   Reply With Quote
Old August 27th, 2016, 07:14 AM   #22784
vbjagan
Registered User
 
Join Date: Jun 2010
Location: Trichy/Chennai/Bengaluru
Posts: 1,360
Likes (Received): 2383

Quote:
Originally Posted by selvamssr View Post
3rd and 4th line is in progress between Beech and Attipattu (22 KMS).
3rd line is operational in some sections.
Complete work is planned to be completed and targeted for commissioning in this FY.
There is no work planned for Attippatu - Gummidipoondi (25 KMS).

Don't know whether Thiruvallur-Thiruvalangadu-Arakkonam 3 and 4 line commissioned and put to use for dedicated express/mail/freight operations.
Last week, during my travel in Kovai express, had noticed express/mails taking the usual 1st line towards AJJ. So trains continue to crawl at Thiruvallur.
__________________

selvamssr liked this post
vbjagan no está en línea   Reply With Quote
Old August 27th, 2016, 12:06 PM   #22785
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur/Wilmington(DE)
Posts: 7,807
Likes (Received): 6815

Quote:
Originally Posted by selvamssr View Post
Recently CCEA chaired by Modi cleared 25000+ crores project.



.
Please read on when projects go to CCEA. I have explained already.
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi
krishnaswamy no está en línea   Reply With Quote
Old August 27th, 2016, 01:57 PM   #22786
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur/Wilmington(DE)
Posts: 7,807
Likes (Received): 6815

from SR GM tweet..

__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi

AIRBUS-A310, selvamssr, Kthamburaja liked this post
krishnaswamy no está en línea   Reply With Quote
Old August 27th, 2016, 02:02 PM   #22787
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur/Wilmington(DE)
Posts: 7,807
Likes (Received): 6815

anybody tried wifi at tambaram station?

when we tried to connect, we got the message that password will be sent to your mobile.


similarly i tried to connect wifi at our airport.. since i used my u.s mobile in aeroplane mode, my sim is not active to receive the text....

can somebody tell how to connect to wifi for those who dont have mobile number, but having smart phone?
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi
krishnaswamy no está en línea   Reply With Quote
Old August 27th, 2016, 02:10 PM   #22788
sirlioner
Registered User
 
Join Date: Oct 2012
Posts: 326
Likes (Received): 169

Quote:
Originally Posted by edwardjeni View Post


Ramps near rail track to reduce elephant deaths
Author: V.S. Palaniappan

COIMBATORE: In a bid to eliminate incidence of elephant deaths on tracks, the Forest Department has started constructing ramps on either side of the track B on the Madukkarai–Walayar section of the Coimbatore–Palakkad line. The facility will be ready in 15 days.
Since 1978, 17 elephants had died in 12 accidents along the 16.25-km-long track A and 18-km-long track B along the stretch of Podanur–Palakkad section. After a couple of elephant deaths in the last two months, a study of the accident-prone spots and the behavioural pattern of the jumbos was taken up through camera trap images.
Elephants were found to be crossing the railway track to reach a water body. In addition, the 25-ft elevation on both sides of the track forced the jumbos to slow down on the track and ascend or descend the gradient, said A. Periasamy, Divisional Forest Officer.
The ramps will provide a gentle slope making it easy for animals to climb and descend from the height, he says. ACC cements at Madukkarai has offered to provide cement waste for forming the base for the ramp which will be constructed at a cost of Rs. 6 lakh.
On completion of the ramps, cameras will be installed to study the behavioural pattern of the elephants. Based on feedback, a decision would be taken on constructing ramps at other vulnerable stretches with improvements and modifications if required, he said.

Water trough near hills

The Forest Department is also creating a water trough near the hills. This will prevent or reduce instances of elephants crossing the track to reach the water body, the DFO said.
Palakkad Division of Southern Railway has already cleared vegetation on the sides of the track at curves to enhance visibility for the loco pilot. A request has been made to clear the vegetation along the tracks for a further distance of 3 km, Mr. Periasamy said. The number of boards alongside the tracks to caution loco pilots to slow down is also being increased, he added.

This will not solve the killings..

Better re-route the whole line for 15 Km to avoid the forest/hilly zone.
Lot of plain land are available in the palghat pass.
Spend a 100 crore for the sake to save Elephant and forest habitats.
__________________

sathyagsn, Madras_Fan liked this post
sirlioner no está en línea   Reply With Quote
Old August 27th, 2016, 05:34 PM   #22789
selvamssr
Registered User
 
Join Date: Dec 2009
Posts: 631
Likes (Received): 334

Quote:
Originally Posted by krishnaswamy View Post
Please read on when projects go to CCEA. I have explained already.
Its not on understanding when projects go to CCEA.

What railways told on MDU-MEJ-TN/NCJ and TVC-CAPE projects?

All these projects were announced at the same time and these were taken up by railways exclusively and asking for TN projects JV.

Earlier they said MDU-MEJ-TN will be taken up soon but now changed stance.

You still support RM might be you are pro RM/BJP than a neutral person.

You conveniently leave other states were not requested for JV for 25000+ crores but TN is asked for MDU-MEJ-TN which also has good RoI.

Also in Tweets by Railways on the new project map it was explicitly mentioned MAS-Gudur 136 KMS is not sanctioned for MAS-NDLS section.

Why railways didn't take it when the entire MAS-NDLS section is taken up for 3rd line?

Also as per their map MAS-SBC is high density route but no new additional line projects is planned. Even KPD-JTJ 3rd line section surveyed earlier was not taken up.
selvamssr no está en línea   Reply With Quote
Old August 27th, 2016, 06:12 PM   #22790
Arul Murugan
Registered User
 
Join Date: Jun 2006
Location: Salem/India-Bethlehem/United States
Posts: 17,550
Likes (Received): 8220

Quote:
Originally Posted by vbjagan View Post
Don't know whether Thiruvallur-Thiruvalangadu-Arakkonam 3 and 4 line commissioned and put to use for dedicated express/mail/freight operations.
Last week, during my travel in Kovai express, had noticed express/mails taking the usual 1st line towards AJJ. So trains continue to crawl at Thiruvallur.
That is sad.. So another fake opening?? Salem escalator after inauguration was closed for maintenance for past few weeks..!
__________________
அருள் முருகன்
தமிழ்நாடு/இந்தியா

selvamssr, mvdliki liked this post
Arul Murugan no está en línea   Reply With Quote
Old August 27th, 2016, 07:40 PM   #22791
ilovetrichy
Registered User
 
Join Date: Aug 2013
Posts: 17,963
Likes (Received): 14920

1) Construction of Dual Colour Roofing with LED Lights currently under Progress at TPJ-Platform 1----To be Extended to all 7 Platforms also










2) Construction of Administrative Office of Southern Railways-Trichy at Rs 3.3 Crores is in Full swing at Crawford


__________________
ilovetrichy no está en línea   Reply With Quote
Old August 28th, 2016, 05:17 AM   #22792
kennyshriram1998
Registered User
 
kennyshriram1998's Avatar
 
Join Date: Jan 2015
Location: Coimbatore/Pondicherry
Posts: 4,911
Likes (Received): 1143

Indian Railways' projects & News in Tamil Nadu

Additional coaches added to trains

Madurai: Southern Railways has augmented the number of coaches in various trains on a permanent basis.

Train 16733/16734 Rameswaram-Okha-Rameswaram weekly express trains will get one extra first class AC-cum-AC 2-tier coach from Rameswaram on August 26 and starting from Okha on August 30. Train 16617/16618 Rameswaram-Coimbatore-Rameswaram weekly express trains will be permanently augmented with a sleeper class coach from Coimbatore on August 30 and from Rameswaram on August 31.

Train 22630/22629 Tirunelveli-Dadar-Tirunelveli weekly express will be permanently augmented with one sleeper class coach from Tirunelveli on August 24 and from Dadar on August 26. Train 12641/12642 Kanniyakumari-Hazrat, Nizamuddin-Kanniyakumari Thirukkural bi-weekly express trains will be permanently augmented with one AC 2-tier coach from Kanniyakumari on August 24 and from Hazrat Nizamuddin on August 27.

Train 16353/16354 Kacheguda-Nagercoil Junction-Kacheguda weekly express trains will be permanently augmented by one AC 2-tier coach from Nagercoil junction on August 30 and from Kacheguda on August 31. Train 16181/16182 Chennai Egmore-Manamadurai-Chennai Egmore Silambu bi-weekly express trains will be permanently augmented by one first class AC coach from Chennai Egmore on August 24 and from Manamadurai on August 25.

Train 22621/22622 Rameswaram-Kanniyakumari-Rameswaram tri-weekly express trains will be permanently augmented with one sleeper class coach from Rameswaram on September 3 and from Kanniyakumari on September 4. Train 16780/16779 Rameswaram-Tirupati-Rameswaram tri-weekly express trains will be permanently augmented by one sleeper class coach from Rmeswaram on September 3 and from Tirupati on September 4.

http://timesofindia.indiatimes.com/c...w/53866363.cms
kennyshriram1998 está en línea ahora   Reply With Quote
Old August 28th, 2016, 06:57 AM   #22793
vbjagan
Registered User
 
Join Date: Jun 2010
Location: Trichy/Chennai/Bengaluru
Posts: 1,360
Likes (Received): 2383

Quote:
Originally Posted by Arul Murugan View Post
That is sad.. So another fake opening?? Salem escalator after inauguration was closed for maintenance for past few weeks..!
Noticed that too. It remained non functional at that time. The jn was super clean.

The SA-KRR passenger spl is providing the connection to Kovai express both the ways for the people of rasipuram, namakkal, karur, infact the entire stretch, for the day time travel to chennai. The combo is not known to many it seems.

And my 12675 did 4.45 hrs flat to SA despite the crawlings at thiruvallur, SA outer, stoppages and couple of TSRs enroute.
__________________

krishnaswamy liked this post
vbjagan no está en línea   Reply With Quote
Old August 28th, 2016, 08:30 AM   #22794
hi2aravind
Registered User
 
Join Date: Dec 2008
Location: Madurai-Bangalore
Posts: 392
Likes (Received): 337

Quote:
Originally Posted by edwardjeni View Post
Better to ignore these communists idiots.. they are useless. They have capacity to bring entire country down.
__________________

krishnaswamy, sathyagsn liked this post
hi2aravind no está en línea   Reply With Quote
Old August 28th, 2016, 09:17 AM   #22795
JAYVIJAY
Registered User
 
Join Date: Nov 2013
Location: Madurai-Bengaluru
Posts: 985
Likes (Received): 935

Quote:
Originally Posted by hi2aravind View Post
Better to ignore these communists idiots.. they are useless. They have capacity to bring entire country down.
Yep.What else one can expect from Commies.. One of the main reasons for China becoming a manufacturing hub is their robust railway system in both pax & freight segments with less freight rates.

RM realised that and bringing down the freight fares which has started to show +ve results but still a long way to go..

The below article throws more light why and how IR bleeding ..
http://economictimes.indiatimes.com/...w/53894636.cms

Hope corporatisation of IR follows soon ..
__________________

hi2aravind liked this post
JAYVIJAY no está en línea   Reply With Quote
Old August 28th, 2016, 02:59 PM   #22796
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur/Wilmington(DE)
Posts: 7,807
Likes (Received): 6815

soon LHB rakes for RF..
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi

ilovetrichy, selvamssr, sunder.k liked this post
krishnaswamy no está en línea   Reply With Quote
Old August 28th, 2016, 07:32 PM   #22797
selvamssr
Registered User
 
Join Date: Dec 2009
Posts: 631
Likes (Received): 334

So, most probably Nellai would not get LHB rakes. I would be happy if Nellai too gets LHB rakes.
SR has received 9 LHB SL coaches from ICF alone in August and 1 First AC from RCF. Jun - Till date received 33 LHB SL coaches. SR would have more coaches after any train RF/Nellai is made LHB. Need to wait and watch which train will get LHB rake.
Good that SR started to use lie over LHB rakes for specials.
selvamssr no está en línea   Reply With Quote
Old August 28th, 2016, 08:31 PM   #22798
rskarthik2k3
Registered User
 
Join Date: Apr 2012
Posts: 553
Likes (Received): 613

Quote:
Originally Posted by Arul Murugan View Post
That is sad.. So another fake opening?? Salem escalator after inauguration was closed for maintenance for past few weeks..!
Very true...
I took the MAS-Mysore and Palani trains twice in the last one month after the inauguration of the 3rd and 4th line. But both times, the trains took the 1st/2nd lines and the trains were trailing the suburban trains in front of them.

Some one, please inform the SG that they should sign JV for this 3rd/4th line and pay the money back to IR/SR...Who knows, only if they agree for JV and settle the money, SR/IR will really put to use these lines for passenger train ops....
__________________

selvamssr, karkal, mvdliki liked this post
rskarthik2k3 no está en línea   Reply With Quote
Old August 28th, 2016, 09:02 PM   #22799
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur/Wilmington(DE)
Posts: 7,807
Likes (Received): 6815

Indian Railways' projects & News in Tamil Nadu

Del
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi

Last edited by krishnaswamy; August 29th, 2016 at 12:33 AM.
krishnaswamy no está en línea   Reply With Quote
Old August 28th, 2016, 10:25 PM   #22800
Arul Murugan
Registered User
 
Join Date: Jun 2006
Location: Salem/India-Bethlehem/United States
Posts: 17,550
Likes (Received): 8220

Quote:
Originally Posted by rskarthik2k3 View Post
Very true...
I took the MAS-Mysore and Palani trains twice in the last one month after the inauguration of the 3rd and 4th line. But both times, the trains took the 1st/2nd lines and the trains were trailing the suburban trains in front of them.

Some one, please inform the SG that they should sign JV for this 3rd/4th line and pay the money back to IR/SR...Who knows, only if they agree for JV and settle the money, SR/IR will really put to use these lines for passenger train ops....
__________________
அருள் முருகன்
தமிழ்நாடு/இந்தியா
Arul Murugan no está en línea   Reply With Quote
Reply

Tags
thanjavur

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 07:18 PM. • styleid: 14


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2016, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu