SOCHI - Fisht Olympic Stadium (47,659)

770K views 1K replies 227 participants last post by  ElvisBC 
#1 ·
A good reason to back the Sochi 2014 Winter Olympic Games bid.



 
See less See more
3
#46 ·
Olympic infrastructure includes the following major sports venues:

1. Biathlon and Cross-Country Skiing Complex, 20,000 capacity, including courses and a stadium with seats
2. Alpine Skiing Center, 18,000 capacity (10,000 standing), includes 5 subvenues
3. National Sliding Center (Bobsleigh, Skeleton, Luge), 11,000 capacity
4. Sochi Arena (Ice Hockey), capacity of 12,000
5. Imeretinskaya Exhibition Center (figure skating), capacity of 12,000; Figure Skating and Short Track Skating practice center — 60 × 30 m ice skating rink
6. Imeretinskaya Exhibition Center (speed skating arena), capacity of 8,000
7. Ice Hockey 2, capacity of 7,000
8. Sochi Central Stadium, capacity 40,000, consists of three sub-venues with football training pitches and a medical rehabilitation center
9. Imeretinskaya Exhibition Center (Curling), spectatorship capacity of 3,000
10. Olympic Village, capacity of 3,000
11. Mountain Olympic Village, capacity of 2,500
12. K-120, K-90 ski jumps, capacity of 15,000
13. Snowboard park, capacity of 15,000 (10,000 standing)
14. Free-style centre, capacity of 14,000 (10,000 standing)
 
#50 ·
Dont just look at the number of seats, that stadium would have the capability to host a great olympicsevent. Of course infrastructure is important to.

Davidkunz:

Exaggerated? No way, modern, even futuristic. I guess they will use it for track and field events and training after the olympics, which will probably stimulate their athleticsinterest and youthtraining with teh facilities.

Isnt this a summerproposal, oh well i just understood, why a track/field stadium for a winterolympics? (maybe for snowboarding, i reckon the sport will grow til then)
 
#58 ·
Me too.

I've been following major events since 2001 -- have never got it wrong so far (Beijing, Vancouver, London and now Sochi).

Sochi was the best choice.

Salzburg-- amazing city, just not Olympic material. The next Olympics in the Alps will be Munich I think, in either 2018 or 2022.
 
#63 ·
Great looking stadium! It's about bloody time they gave the Winter Olympics to Russia. Looking good Russia, but we're gonna clobber you! :)
 
#66 ·
What would the level of development of the Russian ski industry have to do with Sochi 2014? I hope you're not suggesting that Russia isn't capable of installing a ski lift. Russia may not be as wealthy as some other nations, but this is a nation that puts cosmonauts in orbit. They're a very capable nation.
 
#67 · (Edited)
#68 ·
Sorry, but I can't find official thread of Sochi 2014.

Central Stadium

Site Item # under Program on construction: 9.

Site name: Construction of main building of Central Stadium and intra- ground networks (40 thousand seats) (including design-survey works).

Responsible agent under the Program: «SC Olymstroy».

Source of financing: from Federal budget.

Site location: Adlersky district, Sochi city, Imeretinskaya lowland.

Basic technical characteristics:
Capacity — 40 000 seats;
Area of construction — 50 654 m²;
Total area of the building — 128 480 m²;
Scope of construction works — 916 096 m³.

The environmental effect of the Site, range of measures aimed to minimize these effects: In accordance with Technical Assignment, the sections («Evaluation of environmental effect», «Protection of the environment») have been developed. The public hearings have been conducted in Sochi city to discuss documents concerning evaluation of environmental effect of the Olympic Venues in Sochi city (Minutes No.3g dated 23 July 2008).

Ice Arena.

Site Item # under Program on construction: 6.

Site name: Construction of Ice Sport Palace (12 thousand seats) with 60×30 m ice rink and training rink for figure skating and short-track competitions with 60×30 m ice rink (including design-survey works), Imeretinskaya lowland.

Responsible agent under the Program: «SC Olymstroy».

Source of financing: from Federal budget.

Site location: Adlersky district, Sochi city, Imeretinskaya lowland.

Basic technical characteristics:
Capacity — 12 000 seats;
Area of construction — 20 670 m²;
Total area of the building — 67 830 m²;
Volume of construction works — 535 496 m³.

The environmental effect of the Site, range of measures aimed to minimize these effects: The Sections «Evaluation of environmental effect» and «Protection of the environment» have been prepared in accordance with Assignment for design. The public hearings into environmental effect of Olympic Venues on the environment have been conducted in Sochi city (Minutes No.3g dated 01.08.2008).






Small Ice Hockey Arena

Site Item # under Program on construction: 5.

Site name: Construction of small Ice sport rink for ice hockey (7 thousand seats) and intra- ground networks (including design-survey works), Imeretinskaya lowland.

Responsible agent under the Program: «SC Olymstroy».

Source of financing: from Federal budget.

Site location: Adlersky district, Sochi city, Imeretinskaya lowland.

Basic technical characteristics:
Capacity — 7 000 seats;
Area of construction — 9 710 m²;
Total area of the building — 22 870 m²;
Scope of construction works — 231 780 m³.

The environmental effect of the Site, range of measures aimed to minimize these effects: In accordance with Technical Assignment, the sections («Evaluation of environmental effect», «Protection of the environment») have been developed. The public hearings have been conducted in Sochi city to discuss documents concerning evaluation of environmental effect of the Olympic Venues in Sochi city (Minutes No.3g dated 23 July 2008).







Biathlon Complex.

Site Item # under Program on construction: 1.

Site name: Construction of the Biathlon Sport Complex (20 thousand seats), with tracks and stadium with rows of seats (including design-survey works), Krasnopolyansky poselkovy area.

Responsible agent under the Program: «Traipl» LLC.

Source of financing: Investor funds.

Site location: towards north-west from Mountain Ski Centre (at altitude of 1100 m), Krasnopolyansky poselkovy area, Krasnodarsky area.

Basic technical characteristics: area shall be located in direction towards north-west from Mountain Ski Centre (at altitude of 1100—1170 m) having a length of 1100÷1150 m and width of 300÷350 m, the total area shall be about 33÷40.2 hectares. To comply with requirements of the Olympic Games International Committee, under the project will be constructed: the stadium for holding competitions, the biathlon tracks with length of 2; 2.5; 3.0; 3.3; 4.0 km. The Biathlon Sport Centre will consist of — ski sport stadium (stationery rows of seats with the stand roof for 7000 spectators, temporary rows of seats for 13000 spectators, shouting sport area for 30 units, penalty area, start and finish line), artificial snow-making system. Under the project will be constructed a separation of the areas under the schedule for: spectators, sportsmen, service personnel, news sport readers, VIP.

The environmental effect of the Site, range of measures aimed to minimize these effects: In accordance with requirements under RF statutory documents, the section of environmental arrangements («Evaluation of environmental effect», «Protection of the environment») shall be stipulated and the possible unfavourable conditions and social consequences thereof, the preparation of measures aimed to reduce and/or prevent such unfavourable conditions will be determined within framework of the mentioned sections. In accordance with Regulation No.656 dated 18.06.2008 by Head of Sochi city, the public hearings will be conducted in Sochi city in order to discuss technical assignment for making evaluation of environmental effect and documents related to evaluation of environmental effect of the Olympic Venues. The environmental expertise of the Site will be made in accordance with Federal Law N 174-FZ dated 23.11.1995 «ON ENVIRONMENTAL EXPERTISE».






Alpine Skiing Center

1. Site Item # under Program on construction: 3.

2. Site name: Construction of the Mountain Ski Centre (18 thousand seats), including engineering protection in the territory of Roza Khutor plateau, homologated tracks, start area, finish area with rows of seats, artificial snow-making systems, sets of ski—lifts (including design-survey works), along Aibga mountain ridge, urochische Roza Khutor.

3. Responsible agent under the Program: Limited Liability Company «Company for development of mountain ski resort «Roza Khutor»

4. Source of financing: Investor funds.

5. Site location: Aibga mountain ridge, urochische Roza Khutor Krasnopolyansky poselkovy area, Krasnodarsky area.

6. Basic technical characteristics: The Mountain Ski Centre shall consist of:

Engineering protection around territory of the Roza Khutor plateau;
Start area;
Total finish area has been estimated to be with 18 thousand seats for spectators (8 thousand seats, 10 thousand in stand room)
Total length of homologated tracks is 20.5 km;
Artificial snow-making system for Mountain Ski Centre;
Sets of sky-lifts — 4 items (two sky-lifts with capacity of 2400 person per hour, 1 − 2800 person per hour, 1 − 3000 person per hour).

Homologated tracks shall allow make competitions for whole 10 disciplines:
Men’s downhill skiing (length of the track — 3599 m);
Men’s combined downhill skiing (length of the track — 2885 m);
Men’s super-giant downhill skiing (length of the track — 2275 m);
Men’s giant slalom (length of the track — 1508 m),
Men’s slalom (length of the track — 558 m);
Female’s downhill skiing (length of the track — 2895 m);
Female’s combined downhill skiing (length of the track — 2832 m);
Female’s super-giant downhill skiing (length of the track — 2183 m);
Female’s giant slalom (length of the track — 1363 m);
Female’s slalom (length of the track — 475 m).

At the Ski Sport Complex «Roza Khutor» shall be used the following types of sky-lifts (А, В, С, D):
sky-lift «А», «В», «С» — gondola-type;
sky-lift «D» — with seats (6 seats).

Length of slope (in running meters):
«А» — 2341;
«В» — 1541;
«С» — 2326;
«D» — 1378.

Capacity (person per hour):
«А» — 2800;
«В» — 2400;
«С» — 2400;
«D» — 3000.

Speed (m/sec):
«А» — 6;
«В» — 6;
«С» — 6;
«D» — 5.























Curling Arena

Site Item # under Program on construction: 10.

Site name: Construction of Curling Sport Ice-rink (3 thousand seats) and intra- ground networks (including design-survey works), Imeretinskaya lowland.

Responsible agent under the Program: «SC Olymstroy».

Source of financing: from Federal budget.

Site location: Adlersky district, Sochi city, Imeretinskaya lowland.

Basic technical characteristics:

1. Capacity — 3 000 seats;

2. Area of construction — 11 659 m²;

3. Total area of the building — 24 377 m²;

4. Scope of construction works — 168 820 m³.

The environmental effect of the Site, range of measures aimed to minimize these effects: In accordance with Technical Assignment, the sections («Evaluation of environmental effect», «Protection of the environment») have been developed. The public hearings have been conducted in Sochi city to discuss documents concerning evaluation of environmental effect of the Olympic Venues in Sochi city (Minutes No.3g dated 23 July 2008).






Jumps K-125, K-95

Site Item # under Program on construction: 11.

Site name: Construction of Ski Jump slopes К-125, К-95 (15 thousand seats) (including design-survey works), Krasnopolyansky poselkovy area

Responsible agent under the Program: Open joint-stock company «Krasnaya polyana»

Source of financing: Investor funds.

Site location: northern slope of Aibga ridge, poselok Esto-sadok, Krasnopolyansky poselkovy area, Krasnodarsky area.

Basic technical characteristics: The Ski Jump Complex shall be constructed within sport complex that consist of five ski jumps (К-125, К-95 — for competitions and К-20, К-40, К-60 — for training), rows of seats for spectators, ski-rolling complex and service infrastructure developed. The area shall be located not far from Krasnaya Polyana and near poselok Esto-Sadok. The Ski Jump Complex К-125 and К-95 shall provide 15 thousand seats, among which 5 thousand in standing room.

The environmental effect of the Site, range of measures aimed to minimize these effects: In accordance with requirements under RF statutory documents, the section of environmental arrangements («Evaluation of environmental effect», «Protection of the environment») shall be stipulated and the possible unfavourable conditions and social-environmental consequences thereof, the preparation of measures aimed to reduce and/or prevent such unfavourable conditions will be determined within framework of the mentioned sections.






Big Ice Hockey Arena

Site Item # under Program on construction: 8.

Site name: Construction of big Ice Hockey Rink (12 thousand seats) and intra- ground networks (including design-survey works), Adlersky district.

Responsible agent under the Program: «SC Olymstroy».

Source of financing: from Federal budget.

Site location: Adlersky district, Sochi city, Imeretinskaya lowland.

Basic technical characteristics:
Capacity — 12 000 seats;
Area of construction — 18 534 m²;
Total area of the building — 54 870 m²;
Scope of construction works — 518 952 m³.

The environmental effect of the Site, range of measures aimed to minimize these effects: In accordance with Technical Assignment, the sections («Evaluation of environmental effect», «Protection of the environment») have been developed. The public hearings have been conducted in Sochi city to discuss documents concerning evaluation of environmental effect of the Olympic Venues in Sochi city (Minutes No.3g dated 23 July 2008).

Construction of main Olympic village (Olimpiiskaya derevnaya)

Site Item # under Program on construction: 15.

Site name: Construction of main Olympic village (Olimpiiskaya derevnaya) (3 thousand seats) (including design-survey works), Imeretinskaya lowland.

Responsible agent under the Program: «RogSibAl» LLC.

Source of financing: Private investments.

Site location: Adlersky district, Sochi city, Imeretinskaya lowland.

Basic technical characteristics: Olympic village that provides 3000 seats (1600 rooms) with area of 196990 m2, including temporary support-purpose buildings for Olympic Games. The minimal space required for Paralympics Games shall be for 1800 persons (1200 rooms).

The environmental effect of the Site, range of measures aimed to minimize these effects: the Master-plan for territory-planning shall outline preservation of unique natural environment during construction of the sites located in the territory of Sochinsky National Park, including the environmental areas around existing lakes that shall be preserved.




http://www.sc-olympstroy.ru/en/
 
#69 ·
Russian guys, I heard that Sochi main stadium will be turned into football stadium after the games. Do you have any renderings for the football configuration of the stadium?

And some other questions.
1) Will the football configuration have running tracks?
2) Does Russia have any football clubs based in Sochi to use the stadium? If so, what division are they playing in now and what's the average attendance?
 
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.