SkyscraperCity Forum banner

BAKU | Crescent Bay | 210m | 52 fl | 170m | 35 fl | 166m | 36 fl | T/O

260K views 398 replies 79 participants last post by  DarkLite 
#1 · (Edited)
The Crescent Development Project is a prestigious 450,000 square-metre mixed-used development in the heart of Baku, Azerbaijan.

Designed to be a world-class landmark, the development includes a retail podium, residential and commercial towers and a 33-storey, seven-star hotel on an island in the Caspian Sea.

The construction phase of the development is underway, and the project is expected to be completed in late 2016.

 
See less See more
1
#157 ·
According to recent information The Cresent Place will be ready in January, 2015. The Crescent City - in May of the same year :cheers:
By the way, drillng works in Crescent Hotel are provided with a biggest drilling rig. There are only 4 drilling rigs of this type have been manufactured in the World.
 
#161 · (Edited)
Construction of piles in parking area has been started. There will be 483 piles with 1000 mm diameter:



Piles in western part of hotel building are ready. Pile breaking works started:



Static Axial Compressive Load Testing in hotel site:



http://www.lotos.com.az/
Parking will be totally under the sea between Crescent Hotel and the coast :nuts: There will be 3 subsea levels. 50 % of pile works on the island have been completed ;)
 
Top