Old March 15th, 2016, 03:38 PM   #1501
luccian
Registered User
 
Join Date: Mar 2016
Posts: 78
Likes (Received): 29

Da...dar asta inseamna ca ratb-ul sa poata acoperi fluxul de calatori din zona prin a infiinta alte linii si de a le suplimenta pe cele existente(acolo unde este cerere).E adevarat ca se descurca bine liniile din zona si vin oarecum cum trebuie si aici vb in special de liniile 102 si 104.

Last edited by luccian; March 15th, 2016 at 03:50 PM.
luccian no está en línea   Reply With Quote

Sponsored Links
Old March 15th, 2016, 05:11 PM   #1502
Oprescu
Belgravistan
 
Oprescu's Avatar
 
Join Date: Oct 2012
Posts: 570
Likes (Received): 325

Quote:
Originally Posted by ByOnu View Post
In niciun caz, aia este M7.
nu este obligatoriu.
Colentina are prioritate fața de Rahova sau Pantelimon .
dupa ce se termina dr taberii-colentina se poate incepe Rahova-Pantelimon.
de fapt giurgiu-gara de nord ar avea prioritate cred si fața de Rahova-Pantelimon.
Oprescu no está en línea   Reply With Quote
Old March 15th, 2016, 05:14 PM   #1503
MelcToxic
Registered User
 
Join Date: Aug 2008
Location: Bucuresti-Brasov, mai mult Bucuresti
Posts: 568
Likes (Received): 1310

Si aia din Pantelimon? Ghinion. Haha, castig pariul cu ajuns omul pe Marte inainte de M5 in Pantelimon. Yey.
__________________

Adrian Fulga, MSirbu liked this post
MelcToxic no está en línea   Reply With Quote
Old June 7th, 2016, 03:25 PM   #1504
ByOnu
Registered User
 
ByOnu's Avatar
 
Join Date: Dec 2010
Location: Bucharest
Posts: 937
Likes (Received): 1432

Yupii, se lucreaza la finisaje deja!

ORIZONT






Tudor Vladimirescu (DT 34)

























https://www.facebook.com/MinisterulTransporturilor
Sursa Pagina oficiala de facebook a Ministerului Transporturilor
__________________
ByOnu no está en línea   Reply With Quote
Old June 7th, 2016, 10:05 PM   #1505
alexbur
Registered User
 
Join Date: Nov 2015
Location: Manchester/Reading/Galati
Posts: 76
Likes (Received): 116

Sa postam si rezumatul lucrarilor in momentul de fata:

De pe site-ul MT: http://mt.gov.ro/web14/spatiul-media...210-07-06-2016

Pe secțiunea Râul Doamnei – Eroilor, din punct de vedere structural, stadiul fizic de execuție al stațiilor este de 90%, iar al tunelurilor și galeriilor de 95%. Termenul fixat de Ministerul Transporturilor și constructorii proiectului este mijlocul anului 2017 pentru deschiderea circulației pe Magistrala 5.

Stadiul lucrărilor la toate stațiile M5 de pe secțiunea Râul Doamnei – Eroilor:

1. Eroilor 2

Execuția structurii este realizată în proporție de 68%. În acest moment se lucrează la legătura dintre M5 și M1 și se efectuează excavații pentru stația de pompare. De asemenea se lucrează la soluţii pentru diminuarea perioadei aferente devierii traficului auto.

2. Academia Militară

Execuția structurii este realizată în proporție de 85%. Aceasta este ultima statie care va fi definitivată deoarece la finalul proiectului va servi la evacuarea tuturor instalaţiilor tehnologice utilizate la execuţia tunelurilor (benzi transportoare pentru materialul rezultat din excavaţia acestora pe întreaga secţiune aflată în execuţie) precum şi pentru introducerea materialelor pentru finalizarea tunelurilor (bolţari prefabricaţi pentru zona finală a a secţiunii, respectiv Eroilor 2 – Puţ de scoatere TBM situat în parcul Operei şi legătura Eroilor 2 – Magistrala 1)

3. Orizont

Execuția structurii este realizată în proporție de 98%. Traficul auto va fi reluat în totalitate în zona stației până la data de 15 iunie 2016, iar centrala de ventilaţie de pe interstația Orizont - Academia Militară (Stație PETROM), se va realiza până la sfârșitul acestui an.

4. Favorit

Execuția structurii este realizată în proporție de 97%. În această zona se va putea circula, la suprafață, fără restricții înainte de finalul anului 2016.

5. Drumul Taberei 34

Execuția structurii este realizată în proporție de 94%. De asemenea, în zona acestei stații, traficul rutier va putea fi reluat până la finele lui 2016.

6. Parc Drumul Taberei

Execuția structurii este realizată în proporție de 62%.

7. Romancierilor

Execuția structurii este realizată în proporție de 95%. Traficul autoturismelor în zonă va fi permis în totalitale în Trimestrul IV din 2016.

8. Brâncuși

Execuția structurii este realizată în proporție de 94%. Și aici traficul rutier va fi reluat fără restricții până în decembrie 2016.

9. Râul Doamnei

Execuția structurii este realizată în proporție de 51%. În prezent, se lucrează la devieri ale rețelei de canalizare, însă este nevoie de avizul Primăriei Sectorului 6.

10. Stația și Depoul Valea Ialomiței

Execuția structurii este realizată în proporție de 98%, iar finisajele în proporție de 24%. Traficul auto va fi redeschis după achiziția lucrărilor de iluminat public, estimată la începutul Trimestrului IV din 2016.

În acest moment, la toate stațiile se execută finisaje.
__________________
Don’t ever let the place you start dictate where you finish.

unomzapacit, AlexisMD, RunRun1730 liked this post
alexbur no está en línea   Reply With Quote
Old June 7th, 2016, 11:07 PM   #1506
Quaternar
Registered User
 
Quaternar's Avatar
 
Join Date: Mar 2015
Posts: 482
Likes (Received): 2001

Quote:
Originally Posted by ByOnu View Post
Yupii, se lucreaza la finisaje deja!
__________________

Le Clerk, Saint666, Robi_damian, .andy. liked this post
Quaternar no está en línea   Reply With Quote
Old June 8th, 2016, 11:56 AM   #1507
adrian rosca
Registered User
 
adrian rosca's Avatar
 
Join Date: Feb 2013
Location: Bucharest
Posts: 437
Likes (Received): 416

Quote:
6. Parc Drumul Taberei
Execuția structurii este realizată în proporție de 62%.

9. Râul Doamnei
Execuția structurii este realizată în proporție de 51%.

În acest moment, la toate stațiile se execută finisaje.
__________________

steli89 liked this post
adrian rosca no está en línea   Reply With Quote
Old June 9th, 2016, 09:37 AM   #1508
Randaal
Registered User
 
Randaal's Avatar
 
Join Date: Jan 2015
Posts: 1,078
Likes (Received): 953

Se intampla si la case mai mari:

O stradă s-a prăbușit, spectaculos, în centrul capitalei Canadei.
Randaal no está en línea   Reply With Quote
Old June 10th, 2016, 08:27 AM   #1509
BogdanStan
Registered User
 
Join Date: Jul 2013
Location: Bucuresti
Posts: 199
Likes (Received): 252



Toate se intampla la altii inainte sa se intample la noi...uitati-va cate trenuri se pupa bot in bot prin alte tari (gen Franta, Belgia, Germania)...cad macarale pe stadioane (SUA), se rastoarna excavatoare, se surpa drumuri intr-o veselie prin China si America de Sud...amatorism din asta gasim peste tot, cat e lumea de mare...

Dar asa suntem noi romanii, mai fatalisti...daca se intampla la noi e rusine nationala, la aia sunt doar accidente...eu cred ca e firesc sa apara probleme la executia unor lucrari realizate oarecum in premiera la noi in tara...daca nu se intampla nimic, sunt curios cate osanale le ridicam inginerilor si constructorilor pentru impecabila desfasurare a evenimentelor...
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

lovalova liked this post
BogdanStan no está en línea   Reply With Quote
Old June 12th, 2016, 08:05 AM   #1510
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 33,790
Likes (Received): 7855

Metrorex scoate de la "naftalină" proiectul liniei de metrou Gara de Nord – Gara Progresu





Quote:
Proiectul de 950 de milioane de euro al liniei de metrou Gara de Nord – Gara Progresu ar putea prinde în sfârşit contur anul acesta, după aproape patru ani de când Metrorex a anunţat că a obţinut finanţare elveţiană pentru studiile necesare extinderii Magistralei 4 cu acest tronson şi după şapte ani de când a anunţat prima dată că va organiza licitaţie pentru aceste studii.
__________________
Rebuilding Bucharest's History:
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Best picture collection of
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


alexd4u2, alexbur liked this post
Le Clerk no está en línea   Reply With Quote
Old June 12th, 2016, 09:40 AM   #1511
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 33,790
Likes (Received): 7855

Proiectarea metroului Iancului-Pantelimon și expertizarea terenurilor au costat 9 mil. euro. Proiectarea Eroilor-Iancului, contractată până la finele anului
__________________
Rebuilding Bucharest's History:
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Best picture collection of
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


lovalova, alexbur liked this post
Le Clerk no está en línea   Reply With Quote
Old July 12th, 2016, 02:19 PM   #1512
Randaal
Registered User
 
Randaal's Avatar
 
Join Date: Jan 2015
Posts: 1,078
Likes (Received): 953


Linia 5 de metrou, secţiunea Râul Doamnei — Eroilor, primeşte 170 de milioane de euro de la UE
__________________

Le Clerk, Dubreu, MSirbu liked this post
Randaal no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:46 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2016, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu