Old December 27th, 2010, 09:51 AM   #41
vudu_ekb
Registered User
 
vudu_ekb's Avatar
 
Join Date: Oct 2007
Location: Yekaterinburg
Posts: 3,183
Likes (Received): 1607

Just to give some idea about Bogota's Transmilenio BRT system:

http://www.streetfilms.org/bus-rapid-transit-bogota/

And its initial prototype in Curitiba, Brazil:

http://www.streetfilms.org/curitibas-brt/
vudu_ekb no está en línea   Reply With Quote

Sponsored Links
Old September 13th, 2012, 07:05 AM   #42
Jim856796
Registered User
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 8,955
Likes (Received): 849

If there were a metro system to be constructed in Bogota, it would complement the already-extensive TransMilenio BRT System.
__________________
I honestly think all development projects must be sustainable and futureproof.

You support the good projects... and oppose the bad.
Jim856796 está en línea ahora   Reply With Quote
Old September 14th, 2012, 01:41 AM   #43
Dale
Registered User
 
Join Date: Sep 2002
Location: Charlotte, NC
Posts: 9,212
Likes (Received): 5511

Whatever happened to plans for a metro ?
Dale no está en línea   Reply With Quote
Old September 21st, 2012, 02:14 AM   #44
Dale
Registered User
 
Join Date: Sep 2002
Location: Charlotte, NC
Posts: 9,212
Likes (Received): 5511

Hello ?
Dale no está en línea   Reply With Quote
Old September 21st, 2012, 10:53 PM   #45
tampasteve
Registered User
 
tampasteve's Avatar
 
Join Date: Aug 2007
Location: Tampa
Posts: 2,395
Likes (Received): 258

Quote:
Originally Posted by Dale View Post
Hello ?
According to the website below the Bogota Metro said that in 2011 they committed to start work soon...maybe 2013. But that year is suspect:
http://mikesbogotablog.blogspot.com/...dchildren.html

Steve
__________________
There are only two days in the year that nothing can be done. One is called Yesterday and the other is called Tomorrow. Today is the right day.
tampasteve no está en línea   Reply With Quote
Old February 12th, 2013, 10:54 PM   #46
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

Quote:
Originally Posted by Dale View Post
Hello ?
No advances till today
TopWatch no está en línea   Reply With Quote
Old May 10th, 2013, 06:39 AM   #47
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

Mayor Gustavo Petro will stand with President Juan Manuel Santos
All set for the underground research firm

The contract will run for 15 months, after which there will finally be a design detail for management to stop the construction of the project contracted.



De: From: Elespecatdor.com




--------------------



From Twitter:
MovilidadBogotá @SectorMovilidad

It is the first time since spoken of subway construction in Bogota, you get to this level of advancement in the underground heavy.

Saludos!!!
TopWatch no está en línea   Reply With Quote
Old May 10th, 2013, 06:44 AM   #48
Dale
Registered User
 
Join Date: Sep 2002
Location: Charlotte, NC
Posts: 9,212
Likes (Received): 5511

edit
Dale no está en línea   Reply With Quote
Old May 10th, 2013, 06:46 AM   #49
Woonsocket54
PC LOAD LETTER
 
Woonsocket54's Avatar
 
Join Date: May 2005
Location: East Millinocket, Maine
Posts: 5,659
Likes (Received): 5778

Quote:
Originally Posted by TopWatch View Post
The contract will run for 15 months, after which there will finally be a design detail for management to stop the construction of the project contracted.

Bad news. Hope they change their minds.
__________________

Chilenofuturista liked this post
Woonsocket54 no está en línea   Reply With Quote
Old May 10th, 2013, 07:02 AM   #50
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

Quote:
Originally Posted by Woonsocket54 View Post
Bad news. Hope they change their minds.
I think those are good news. First was an study of passenger demand, that shows where the metro line will pass. Now this contract will look closely at these places and will do soil or "ground" studies, landscaping, design, etc. to at the end of these studies, it can start the work of engineering.

Saludos!
TopWatch no está en línea   Reply With Quote
Old June 27th, 2013, 07:05 AM   #51
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

.

Quote:
The 'Day Zero' for the construction of the Metro de Bogotá

June 24, 2013.


Today Monday is the 'Day Zero' for initiation Bogotá metro when signed the minutes of initiation of basic engineering studies for the construction of the mega-project that the city has waited for 60 years.

At noon on June 24 Mayor Mayor Gustavo Petro, will witness the initiation certificate, signed by the legal representative of the Consortium L1, Jose Maria Villarroel, and the IDU Juan Francisco Rios, project coordinator, Giovanni Gonzalez, director Technical Designs and Libardo Yaruro Celis, deputy director of Infrastructure.

On May 9 when the contract was signed, it was announced that six weeks would be made full legalization, which refers to the approval of policies, which he is serving the city within the timelines provided.

This means that today June 24 is the Day Zero to account for 15 months of the contract's designs.

The first product to deliver the consultant is studying alternatives to variant Station Savannah, which will be defined if the path takes 1st Street or Avenue May 1st, product to be delivered on day 90 consulting, ie September 24, 2013.

The surveying field activities begin in the second week of July 2013.

Preliminary geotechnical activities are already reviewing office to define Drilling and boring campaign that will classify the soil and tunnel design.

The geotechnical field activities begin in mid August 2013.


The studies will be three stages, as follows:

Step 1: Civil Works - Infrastructure. Tunnel design, structure design, design of stations, network interference.

Step 2: Design of landscaping, architectural design, urban design, design workshops and patios, control system design, power design, communication system, signage.

Step 3: Design of rolling stock, investment costs of the civil works, plant, equipment, rolling stock, maintenance and operating costs.

The period referred to is 15 months and its value is estimated at 71 billion pesos.

--

PRESS OFFICE

Mayor of Bogotá



Saludos!
TopWatch no está en línea   Reply With Quote
Old August 15th, 2013, 03:45 AM   #52
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

More Great News!

Quote:
Originally Posted by Fenix_2007 View Post
Wednesday Agust 14, 2013



Works to improve and maintain mobility systems of the city development. “Bogotá Humana”.

IDU starts on Wednesday August 14 at street 127 with Ninth Avenue through Colombo Spanish Consortium L1, the first campaign activities surveying required for the development of advanced basic engineering studies of the first underground subway line heavy, which have a length of 26.5 kilometers.

This route starts from the Tintal in the south-west of the city, passing through San Victorino, 13 Avenue, Lourdes Park and the eastern edge ninth-career until 127th Street.


Plates will be installed in the field and with GPS accurate information will be located (north-east and height or elevation) relative to the location of poles, utility boxes, buildings, existing in the layout of the corridor where the line will be built metro.


These jobs start tomorrow with two surveying fees are intended to detail the location surveys, among other things, of curbs, poles, camera phones, sewage wells, construction of retaining walls fences, tree planting, energy and network boxes in general.

It is estimated that as the work progresses will be added other surveyors fees to a total of 7 or 8, each consisting of 3 people. According to the schedule of activities this task will require a whole 4.5 months, during which they covered the 26.5 miles of total distance of the first metro line heavy

In principle commissions installed on ground surveying the "plates or vertices" and the GPS accurate information will be located (north-east and height or elevation) relative to the location of poles, utility boxes, buildings, etc. located on the route of the corridor through which the line will be built underground.

For the upcoming August 21 is scheduled to begin geotechnical work, or ground studies, for which it will make holes with special equipment.

These are some of the stages that cover the realization of advanced basic engineering studies of underground heavy.

- Topography and Service Networks
- Construction Procedures
- Risks in Buildings and Auscultation
- Hydrology and Conditions to groundwater
- Geometric Design
- Line tunnel
- Structures
- Urbanism and Architecture
- Patios and Workshops
- Railway Facilities
- RAMS Management
- Investment costs

Saludos!
TopWatch no está en línea   Reply With Quote
Old August 15th, 2013, 07:49 AM   #53
Woonsocket54
PC LOAD LETTER
 
Woonsocket54's Avatar
 
Join Date: May 2005
Location: East Millinocket, Maine
Posts: 5,659
Likes (Received): 5778

Well, that's excellent news.

Colombia borders 5 countries. Each of Brazil, Peru and Venezuela has a metro in its capital city, while Panama and Ecuador are currently building metros in their capital cities. So it's time Bogota got onboard as well.
__________________

Chilenofuturista, geometarkv liked this post
Woonsocket54 no está en línea   Reply With Quote
Old August 16th, 2013, 04:35 PM   #54
tunnel owl
Registered User
 
Join Date: May 2013
Posts: 751
Likes (Received): 440

Quote:
Originally Posted by Woonsocket54 View Post
So it's time Bogota got onboard as well.
Montevideo should join this club. Studies for metro there are at least as old as the Bogota ones.

Kind regards
__________________

Chilenofuturista liked this post
tunnel owl no está en línea   Reply With Quote
Old August 17th, 2013, 08:06 AM   #55
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

More Pics and Videos! (in Spanish)

Quote:
Originally Posted by Feleru* View Post
La nota del IDU

Quote:
Originally Posted by Feleru* View Post
Quote:
Originally Posted by Fenix_2007 View Post




...

+


Estas sí son de la 127 .[/SIZE]

[/FONT]

Saludos!
TopWatch no está en línea   Reply With Quote
Old August 22nd, 2013, 03:30 AM   #56
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

First Studies!!

Quote:
Originally Posted by Fenix_2007 View Post
The Bogota Subway is ticking: morning, first drilling


The IDU starts at noon on Wednesday August 21 at Primero de Mayo Avenue, between 35A st and 35B st south, through the Universidad Nacional, Universidad Javeriana, Universidad La Salle and the Universidad de los Andes, the first geotechnical activities (soil study) required for the development of advanced basic engineering of the first underground subway line, which have a length of 26.5 kilometers.

Geotechnical activities are the second task being performed within the timeframe stipulated by the IDU and the consortium L1, after starting with the topography on 14 August, work that aims to detail the location surveys, among other things, of curbs, poles, camera phones, sewage wells, construction of walls, fences, tree planting, energy boxes and networking in general.

For geotechnical studies are plans of special equipment to make 300 boreholes over 50 meters deep to collect soil samples and to design the tunnel and underground stations of the first subway line. In total there will be 16,000 meters drilling linear, comparable to a soil survey more than 80 buildings. [...]

From: http://voxpopuli.net/el-metro-de-bog...a-perforacion/

+


"Today we begin drilling for soil studies, which define the tunnel designs #MetrodeBogotá"



"#AhoraSíElMetro There will be 3 or 4 holes per station stipulated in this Metro @idubogota @petrogustavo"



"Mayor @petrogustavo kicks off drilling for soil survey of Bogota, to design the #Metro"








https://twitter.com/idubogota / https://twitter.com/petrogustavo

> Red dot shows the drilling place:


Saludos!!
TopWatch no está en línea   Reply With Quote
Old November 5th, 2013, 01:42 AM   #57
Spam King
Make America Great Again!
 
Spam King's Avatar
 
Join Date: May 2008
Location: Polanco, Distrito Federal
Posts: 879
Likes (Received): 569

Along Carrera 9 north of Calle 100, will the line run underground or at grade along the existing railway right-of-way? If so, why not extend it all the way to Calle 170, if it's running at grade, with a right of way already existing, it wouldn't be very expensive.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God


MAKE AMERICA GREAT AGAIN!
Spam King no está en línea   Reply With Quote
Old November 10th, 2013, 04:15 PM   #58
TopWatch
Roloncho!
 
TopWatch's Avatar
 
Join Date: Jun 2008
Location: Bogotá D.C.
Posts: 4,659
Likes (Received): 3139

^ Along Carrera 9 will remain underground , including the railway line over the Metro layout.

The reason for this is that the railway has awarded a light rail project that would connect small municipalities that are in the metropolitan area, so Metro can't run over this lane.

Instead the subway, ended its journey just a few kilometers north of 100 Street (About 3 km North on the 127 Street) and is expected to turn to the West side of the city, to another location, that in my personal opinion is better because most people needs it.

Long time ago, it was project to 170th Street , but with the amount of studies and projects (Transmilenio, Train Tram, SITP, etc.) Loses this idea increasingly harder.


--------------


Some interesting facts about the project :


Total lenght : 26.5 km


Stations in Total: 28
Simple Stations 19
BRT stations inegration: 7
Special stations (headers ): 2
Approximate dimensions of the stations : 200m long x 26m wide

100% Underground (Suddenly some small trail sections are zeroed), Electric Traction (?), Average depth between 20-25 meters and 40 trains with 7 wagons (?) With capacity between 1600-1800 passengers.


Saludos!
TopWatch no está en línea   Reply With Quote
Old December 23rd, 2013, 06:06 AM   #59
Tom 958
Registered User
 
Tom 958's Avatar
 
Join Date: Apr 2007
Location: near Atlanta
Posts: 786
Likes (Received): 163

Way too many photos for one post, but this post has Google map plan and current streetview for every proposed metro station:

http://www.skyscrapercity.com/showpo...postcount=8662
Tom 958 no está en línea   Reply With Quote
Old March 29th, 2014, 04:20 PM   #60
Tom 958
Registered User
 
Tom 958's Avatar
 
Join Date: Apr 2007
Location: near Atlanta
Posts: 786
Likes (Received): 163

Quote:
Originally Posted by Tom 958 View Post
Way too many photos for one post, but this post has Google map plan and current streetview for every proposed metro station:

http://www.skyscrapercity.com/showpo...postcount=8662
And here's a map that matches it.

c/o http://www.caracol.com.co/multimedia...o/2039855.aspx


Oh, wow: JACKPOT!

c/o deywibkiss http://www.skyscrapercity.com/showpo...postcount=9023, where a larger version can be found
__________________

Last edited by Tom 958; March 29th, 2014 at 04:47 PM. Reason: added deywibkiss' map
Tom 958 no está en línea   Reply With Quote


Reply

Tags
bogota, metro, metro de bogota

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:33 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium