daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old November 18th, 2017, 02:39 PM   #2221
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

Quote:
Originally Posted by nazrey View Post
UPDATE:
Greater Kuala Lumpur Population: 7 million
International Tourist (Kuala Lumpur): 12 million
Operators:
KTMB - Line 1, 2, 10
rapidKL - Line 3, 4, 5, 8, 9, BRT Sunway Line
ERL - Line 6, 7
Ticketing Systems:
Touch'n Go - All lines/rapidKL bus/toll road/retail/hospital/parking
Komuter Link (stored value card) - Line 1, 2
Visa Credit Card/QR Code - Line 6, 7

[1995] Line 1 - KTM Komuter Seremban Line
[1995] Line 2 - KTM Komuter Port Klang Line
[1997] Line 3 - LRT1 Ampang Line
[1998] Line 4 - LRT1 Seri Petaling Line
[1998] Line 5 - LRT2 Kelana Jaya Line
[2002] Line 6 - KLIA Ekspres Line
[2002] Line 7 - KLIA Transit Line
[2003] Line 8 - Monorail Line
[2010] KTM ETS
[2015] BRT Sunway Line
[2016] Line 9 - MRT1 Sungai Buloh-Kajang Line

UNDER CONSTRUCTION/APPROVED
[2018] Line 10 - KTM Komuter Skypark Line
[2021] Line 11 - LRT3 Bandar Utama-Shah Alam-Klang Line
[2022] Line 12 - MRT2 Sungai Buloh-Serdang-Putrajaya
[2025] Line 13 - MRT3 Circle Line
[2026] High Speed Rail by MyHSR Corp/LTA between Kuala Lumpur-Singapore
[2027] East Coast Rail Link by MRL between Gombak-Kota Bharu

ONHOLD
Line 14 - Putrajaya Monorail

MULTIMODAL STATIONS
[2001] KL Sentral - Airport rail link terminated station(Line 6, 7)/Line 1/Line 2/Line 5/KTM ETS
[2001] Masjid Jamek - Line 3/Line 4/Line 5
[2003] Hang Tuah - Line 3/Line 4/Line 8
[2010] Kuala Lumpur - Line 1/Line 2/KTM ETS
[2011] Bandar Tasik Selatan - Line 1/Line 4/Line 7/KTM ETS/ITT South
[2016] Sungai Buloh - Line 2/Line 9/KTM ETS
[2017] Kajang - Line 1/Line 9/KTM ETS
[2018] Subang Jaya - Line 2/Line 5/Line 10
[2022] Kepong Sentral - Line 2/Line 12/ KTM ETS
[2022] Titiwangsa - Line 3/Line 4/Line 8/Line 12
[2022] Chan Sow Lin - Line 3/Line 4/Line 12
[2025] Sentul Timur - Line 3/Line 4/Line 13
[2026] Bandar Malaysia - Line 1/Line 12/Line 13/Airport rail link/High Speed Rail Terminus

Integrated Transport Terminal (ITT for intercity/international busses)
[2011] Bandar Tasik Selatan (for South Peninsular Malaysia inbound busses) - Linked with Line 1/Line 4/Line 7/KTM ETS
[2020] Gombak (for East Peninsular Malaysia inbound busses) - To be link with Line 5/ECRL
[TBA] Kwasa Damansara (for North Peninsular Malaysia inbound busses) - To be link with Line 9
LINE 1 - KTM Komuter Seremban Line
As of Nov 2017

Quote:
Line length: 135 km
Stations: 26
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 6 STATIONS + 1 STATIONS
LINE: 7 LINES + 1 LINES + KTM ETS
[LINE 2] Putra
[LINE 2] Bank Negara
[LINE 2] [KTM ETS] Kuala Lumpur
[LINE 2] [LINE 5] [LINE 6] [LINE 7] [LINE 8] [LINE 9] [KTM ETS] KL Sentral
[LINE 4] [LINE 7] [KTM ETS] Bandar Tasik Selatan
[LINE 9] [KTM ETS] Kajang


UNDER CONSTRUCTION
[LINE 12] Kampung Batu
Kajang 2 station (NEW STATION)
The Klang Valley Double Track Rehabilitation Project



https://upload.wikimedia.org/wikiped...24px-ETS_6.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

muhaimin7, dimlys1994 liked this post

Last edited by nazrey; November 22nd, 2017 at 04:13 AM.
nazrey no está en línea   Reply With Quote

Sponsored Links
Old November 18th, 2017, 02:49 PM   #2222
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 2 - KTM Komuter Port Klang Line
As of Nov 2017

Quote:
Line length: 126 km
Stations: 33
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 7 STATIONS + 3 STATIONS
LINE: 6 LINES + 3 LINES + BRT Sunway Line + KTM ETS
[LINE 1] Putra
[LINE 1] Bank Negara
[LINE 1] [KTM ETS] Kuala Lumpur
[LINE 1] [LINE 5] [LINE 6] [LINE 7] [LINE 8] [LINE 9] [KTM ETS] KL Sentral
[LINE 9] [KTM ETS] Sungai Buloh
[LINE 5] Subang Jaya
[BRT Sunway Line] Setia Jaya


UNDER CONSTRUCTION
[LINE 5] Eco City/Abudullah Hukum
[LINE 5] [LINE 10] Subang Jaya
[LINE 11] Klang
[LINE 12] Kepong Sentral
The Klang Valley Double Track Rehabilitation Project



https://upload.wikimedia.org/wikiped...C_Serendah.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

Munwon, dimlys1994 liked this post

Last edited by nazrey; November 18th, 2017 at 02:54 PM.
nazrey no está en línea   Reply With Quote
Old November 19th, 2017, 07:32 AM   #2223
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 3/LINE 4 - LRT1 Ampang/Sri Petaling Line
As of Nov 2017

Quote:
Line length: 45.1 km
Stations: 43
INTERCHANGE/INTEGRATED STATIONS
LINE 3

Quote:
TOTAL: 12 STATIONS + 1 STATIONS
LINE: 4 LINES + 1 LINES
[LINE 4] Sentul Timur
[LINE 4] Sentul
[LINE 4] [LINE 8] Titiwangsa
[LINE 4] PWTC
[LINE 4] Sultan Ismail
[LINE 4] Bandaraya
[LINE 4] [LINE 5] Masjid Jamek
[LINE 4] Plaza Rakyat
[LINE 4] [LINE 8] Hang Tuah
[LINE 4] Pudu
[LINE 4] Chan Sow Lin
[LINE 9] Maluri

LINE 4

Quote:
TOTAL: 12 STATIONS + 2 STATIONS
LINE: 4 LINES + 1 LINES
[LINE 3] Sentul Timur
[LINE 3] Sentul
[LINE 3] [LINE 8] Titiwangsa
[LINE 3] PWTC
[LINE 3] Sultan Ismail
[LINE 3] Bandaraya
[LINE 3] [LINE 5] Masjid Jamek
[LINE 3] [LINE 9] Plaza Rakyat
[LINE 3] [LINE 8] Hang Tuah
[LINE 3] Pudu
[LINE 3] Chan Sow Lin
[LINE 5] Putra Heights


UNDER CONSTRUCTION
[LINE 3] [LINE 4] [LINE 12] Chan Sow Lin
[LINE 4] [LINE 12] Sungai Besi


https://upload.wikimedia.org/wikiped..._LRT_train.jpg

https://upload.wikimedia.org/wikiped..._LRT_train.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

triple-j, dimlys1994 liked this post

Last edited by nazrey; November 20th, 2017 at 05:42 AM.
nazrey no está en línea   Reply With Quote
Old November 19th, 2017, 06:30 PM   #2224
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 5 - LRT Kelana Jaya Line
As of Nov 2017

Quote:
Line length: 46.4 km
Stations: 37
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 5 STATIONS + 3 STATIONS
LINE: 8 LINES + 3 LINES + BRT Sunway Line + KTM ETS
[LINE 3] [LINE 4] Masjid Jamek
[LINE 9] Pasar Seni
[LINE 1] [LINE 2] [LINE 6] [LINE 7] [LINE 8] [LINE 9] [KTM ETS] KL Sentral
[LINE 4] Putra Heights
[LINE 2] Subang Jaya
[BRT Sunway Line] USJ 7


UNDER CONSTRUCTION
[LINE 2] Eco City/Abudullah Hukum
[LINE 2] [LINE 10] Subang Jaya
[LINE 11] Glenmarrie
[LINE 12] Ampang Park



https://upload.wikimedia.org/wikiped...T_platform.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post

Last edited by nazrey; November 22nd, 2017 at 03:03 AM.
nazrey no está en línea   Reply With Quote
Old November 20th, 2017, 06:04 AM   #2225
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 6/LINE 7 - Express Rail Link Line
As of Nov 2017

Quote:
Line length: 57 km
Stations: 6
INTERCHANGE/INTEGRATED STATIONS
LINE 6 - KLIA Ekspres

Quote:
TOTAL: 3 STATIONS
LINE: 6 LINES
[LINE 1] [LINE 2] [LINE 5] [LINE 7] [LINE 8] [LINE 9] [KTM ETS] KL Sentral
[LINE 7] KLIA
[LINE 7] KLIA2

LINE 7 - KLIA Transit

Quote:
TOTAL: 4 STATIONS + 1 STATIONS
LINE: 7 LINES + 1 LINE + KTM ETS
[LINE 1] [LINE 2] [LINE 5] [LINE 6] [LINE 8] [LINE 9] [KTM ETS] KL Sentral
[LINE 6] KLIA
[LINE 6] KLIA2
[LINE 1] [LINE 4] [KTM ETS] Bandar Tasik Selatan


UNDER CONSTRUCTION
[LINE 12] Putrajaya Sentral



https://upload.wikimedia.org/wikiped...nggi_depot.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post
nazrey no está en línea   Reply With Quote
Old November 20th, 2017, 11:20 AM   #2226
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 8 - Monorail Line
As of Nov 2017

Quote:
Line length: 8.6 km
Stations: 11
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 4 STATIONS
LINE: 8 LINES + 1 LINES + KTM ETS
[LINE 3] [LINE 4] Titiwangsa
[LINE 3] [LINE 4] Hang Tuah
[LINE 1] [LINE 2] [LINE 5] [LINE 6] [LINE 7] [LINE 9] [KTM ETS] KL Sentral
[LINE 9] Bukit Bintang


UNDER CONSTRUCTION
[LINE 3] [LINE 4] [LINE 12] Titiwangsa

PROPOSED EXTENSION
Phase 1: from KL Sentral to Taman Gembira
Phase 2: from Taman Gembira to Sunway
Phase 3: from Titiwangsa to Matrade


https://farm8.staticflickr.com/7546/...0014c119_b.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

SLASH_2, dimlys1994, QalzimCity liked this post
nazrey no está en línea   Reply With Quote
Old November 21st, 2017, 04:39 PM   #2227
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 9 - MRT Sungai Buloh - Kajang Line
As of Nov 2017

Quote:
Line length: 51 km
Stations: 31
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 7 STATIONS + 3 STATIONS
LINE: 8 LINES + 2 LINES + KTM ETS
[LINE 2] [KTM ETS] Sungai Buloh
[LINE 1] [LINE 2] [LINE 5] [LINE 6] [LINE 7] [LINE 8] [KTM ETS] Muzium Negara/KL Sentral
[LINE 5] Pasar Seni
[LINE 8] Bukit Bintang
[LINE 3] Maluri
[LINE 3] [LINE 4] Merdeka/Plaza Rakyat
[LINE 1] [KTM ETS] Kajang


UNDER CONSTRUCTION
[LINE 11] Bandar Utama
[LINE 12] TRX
[LINE 12] Kwasa Damsnsara



https://upload.wikimedia.org/wikiped...oncourse_4.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post
nazrey no está en línea   Reply With Quote
Old November 21st, 2017, 04:57 PM   #2228
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 10 - KTM Komuter Skypark Line
As of Nov 2017 (OPENNING SOON)

Quote:
Line length: 8.16 km
Stations: 2 + 2
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 1 STATION
LINE: 2 LINES
UNDER CONSTRUCTION
[LINE 2] [LINE 5] Subang Jaya

PROPOSED EXTENSION
From Terminal Skypark (Subang airport) to Sungai Buloh
From Subang Jaya to KL Sentral


https://upload.wikimedia.org/wikiped...tation2016.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post

Last edited by nazrey; November 21st, 2017 at 05:03 PM.
nazrey no está en línea   Reply With Quote
Old November 22nd, 2017, 04:00 AM   #2229
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 11 - LRT3 Bandar Utama - Shah Alam - Klang Line
As of Nov 2017 (UNDER CONSTRUCTION)

Quote:
Line length: 37 km
Stations: 26
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 3 STATIONS
LINE: 3 LINES
UNDER CONSTRUCTION
[LINE 5] Glenmarrie
[LINE 9] Bandar Utama
[LINE 2] Klang



https://www.lrt3.com.my
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

QalzimCity, dimlys1994 liked this post
nazrey no está en línea   Reply With Quote
Old November 23rd, 2017, 06:23 PM   #2230
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 12 - MRT2 Sungai Buloh - Serdang - Putrajaya Line
As of Nov 2017 (UNDER CONSTRUCTION)

Quote:
Line length: 52.2 km
Stations: 37
INTERCHANGE/INTEGRATED STATIONS
Quote:
TOTAL: 11 STATIONS
LINE: 8 LINES + KTM ETS
UNDER CONSTRUCTION
[LINE 9] Kwasa Damansara (to be link with ITT North)
[LINE 2] [KTM ETS] Sungai Buloh (to be link with line 10)
[LINE 2] Kepong Sentral
[LINE 1] Kampung Batu
[LINE 5] Ampang Park
[LINE 3] [LINE 4] Chan Sow Lin
[LINE 9] Tun Razak Exchange
[LINE 4] Sungai Besi
[LINE 7] Putrajaya Sentral (to be link with Putrajaya monorail)
[LINE 3] [LINE 4] [LINE 8] Titiwangsa
[LINE 1] [LINE 6] [LINE 7] Bandar Malaysia (to be link with line 13, HSR)



Tun Razak Exchange Station Sungai Buloh–Serdang–Putrajaya line future platform
https://upload.wikimedia.org/wikiped...e_platform.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post

Last edited by nazrey; November 25th, 2017 at 03:58 PM.
nazrey no está en línea   Reply With Quote
Old November 25th, 2017, 04:02 PM   #2231
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

GREATER KUALA LUMPUR HIGH SPEED RAIL STATION

Quote:
Originally Posted by shafiilham View Post
Kuala Lumpur - Singapore High Speed Rail
Date of Completion : December 31, 2026
Number of Stations : 7 in Malaysia and 1 in Singapore

Services provided :
1. Express service from Bandar Malaysia to Jurong East
2. Transit service from Bandar Malaysia to Iskandar Puteri, stopping at each of 7 stations in Malaysia
3. Shuttle service between Iskandar Puteri and Jurong East

Train station concepts source from http://www.myhsr.com.my/kl-sg-hsr/kl...oncept-designs

1. Bandar Malaysia Station

Bandar Malaysia HSR station by shafiilham123, on Flickr

2. Bangi-Putrajaya Station

Bangi-Putrajaya HSR station by shafiilham123, on Flickr

3. Seremban Station

Seremban HSR station by shafiilham123, on Flickr
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote
Old November 26th, 2017, 06:07 AM   #2232
QalzimCity
Registered User
 
Join Date: Jan 2012
Posts: 1,312
Likes (Received): 1124

Quote:
Originally Posted by nazrey View Post
LINE 8 - Monorail Line
As of Nov 2017


INTERCHANGE/INTEGRATED STATIONS

[LINE 3] [LINE 4] Titiwangsa
[LINE 3] [LINE 4] Hang Tuah
[LINE 1] [LINE 2] [LINE 5] [LINE 6] [LINE 7] [LINE 9] [KTM ETS] KL Sentral
[LINE 9] Bukit Bintang


UNDER CONSTRUCTION
[LINE 3] [LINE 4] [LINE 12] Titiwangsa

PROPOSED EXTENSION
Phase 1: from KL Sentral to Taman Gembira
Phase 2: from Taman Gembira to Sunway
Phase 3: from Titiwangsa to Matrade


https://farm8.staticflickr.com/7546/...0014c119_b.jpg
wow soon we can ride monorail from sunway direct to kl...just hope they cange the rolling stock layout... im not a fan of that island seating
QalzimCity no está en línea   Reply With Quote
Old November 26th, 2017, 10:51 AM   #2233
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 12 - MRT SSP Line


http://www.mymrt.com.my/cms/upload_f...mar17/e10a.jpg

http://www.mymrt.com.my/cms/upload_f.../may17/e3b.jpg

http://www.mymrt.com.my/cms/upload_f...apr17/u19b.jpg

http://www.mymrt.com.my/cms/upload_f...apr17/u17b.jpg


http://www.mymrt.com.my/cms/upload_f...may17/e10c.jpg

http://www.mymrt.com.my/cms/upload_f...may17/e10a.jpg

http://www.mymrt.com.my/cms/upload_f...apr17/u18a.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

Munwon, dimlys1994 liked this post
nazrey no está en línea   Reply With Quote
Old November 27th, 2017, 09:39 AM   #2234
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 9: Kwasa Damansara Interchange station
https://www.bigkl.com/mrt/kwasa-damansara-mrt-station/







__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994, Munwon liked this post
nazrey no está en línea   Reply With Quote
Old November 27th, 2017, 10:58 AM   #2235
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 9: Muzium Negara interchange station


https://www.bigkl.com/mrt/muzium-negara-mrt-station/
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post
nazrey no está en línea   Reply With Quote
Old November 27th, 2017, 11:05 AM   #2236
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

Quote:
Originally Posted by nazrey View Post
EV Charger of electric car for tourist in Putrajaya


https://hiveminer.com/Tags/comos,ecoride/Interesting

http://www.utusan.com.my/galeri-foto...rajaya-1.26631


https://comos.com.my/wp-content/uplo...hly-Rental.jpg
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post

Last edited by nazrey; November 28th, 2017 at 09:01 AM.
nazrey no está en línea   Reply With Quote
Old November 27th, 2017, 11:12 AM   #2237
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

PUTRAJAYA
Mean monthly household income 2016: RM11,555

Federal Court of Malaysia by suria kencana, on Flickr

Putrajaya starts using fast-charging system for electric buses
Super Quick Charge-Electric Buses Enter Service in Malaysia


https://twitter.com/imranjaafar/stat...08909568737280

https://www.carsifu.my/news/full-cha...o-malaysia-but

Quote:
PUTRAJAYA will be the pioneer city to test a revolutionary new technology for electric vehicle (EV) buses that will allow the vehicles to fully charge their batteries in only 10 minutes.

This is a tremendous difference from the technology currently used in electric vehicles, where batteries must be left to charge overnight to be fully charged.

This pilot project, dubbed the “Putra NEDO EV Bus Project”, is the result of a collaboration between Putrajaya Corporation (PPj) and Japan’s New Energy and Industrial Technology Development Organisation (NEDO).

Federal Territories Ministry secretary-general Datuk Seri Adnan Md Ikshan was present to officially launch the project at Putrajaya Sentral.

“The ministry believes that the implementation of this demonstration project in Putrajaya will put us on track towards turning Putrajaya into a sustainable, low-carbon, and green city by 2025,” he said.

“We hope the operation of EV buses eventually results in the reduction of carbon dioxide emissions from the transportation sector in the city.”

NEDO executive director Makoto Watanabe said that this was the first ever demonstrative operation of Super Quick Charge (SQC) Large EV Buses in a city, worldwide.

Representing the Japanese Consortium of corporate partners involved in the project, Toshiba Infrastructure Systems and Solutions Corporation director and corporate vice-president Isao Aoki said some of the technology supporting this project was not even deployed in Japan yet.

“It is necessary to promote effective measures with a strong top-down policy to realise a green city, and I hope that Putrajaya can become the first model city in the world with zero-emission buses,” he said.

PPj president Datuk Seri Hasim Ismail said Putrajaya has eight of these single-decker buses, which began commercial operations in June, servicing two 23km routes in Putrajaya and Cyberjaya.

Hasim said they would add another two single-decker buses to the fleet by the end of the year, with an additional two double-decker buses sometime next year to be used mainly for tourism purposes.

The buses can run for up to 30km on a full charge before requiring to stop at an SQC terminal to recharge.

Three SQC terminals are located in Putrajaya Sentral with one more at the Bus Depot in Precinct 14.

While the technology for the battery is imported from Japan, the bus is manufactured, maintained and managed locally.
Read more at https://www.thestar.com.my/metro/com...SyECaLHPp0j.99

Quote:
Super Quick Charge-Electric Buses Enter Service in Malaysia
Routes
1. Circular route in Putrajaya, Malaysia: 23Km
2. Circular route between Putrajaya and Cyberjaya: 23Km




http://www.toshiba.co.jp/cs/en/topic...r/20170828.htm
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post

Last edited by nazrey; November 29th, 2017 at 08:05 AM.
nazrey no está en línea   Reply With Quote
Old November 27th, 2017, 11:26 AM   #2238
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

COMOS – Malaysia’s First EV Car Sharing Program
http://www.rebeccasaw.com/comos-mala...how-to-use-it/

What’s COMOS?
It’s an
1. Electric Vehicles (EV) only
2. Car sharing program

1. It’s not car ownership where you pay a monthly instalment, the car is owned by the bank but leased to you until you settle the debt and you’re responsible for all maintenance and running costs (petrol, road tax, etc)
2. It’s not car rental where you pay a pre-agreed sum to the vehicle owner and return the vehicle back to the owner at the pre-determined time and place in the condition it was given to you (ie, with a full tank of petrol)



How does it work?

1. Register and pay the membership fee at comos.com.my or at COMOS kiosks. Mobile app is currently not available.
2. Go to Menara UOA, Bangsar COMOS office to collect your RFID membership card
3. Go to comos.com.my to log in and book the time and place of pick-up as well as time and place of drop off. There are 10 locations in the Klang Valley at the moment
4. You will receive an SMS and email stating your booking and the vehicle number that has been assigned to you.
5. Locate the vehicle and tap your card on the scanner located on the right side of the windscreen.
Make sure you’re there only at the assigned time otherwise the vehicle would remain locked and you’ll see a red LED flash as you scan your card (see below). Also, if you’re collecting from a charging station, make sure the charger is decoupled.
6. You’ll see green when the car is unlocked.
Upon entering you then have to enter your 6-digit pin number on the console located on the top right of the front windscreen which allows you to start your vehicle (to summarize, the 2-level security system is the card to unlock and pin to drive)


https://comos.com.my/wp-content/uplo...hly-Rental.jpg

How much does it cost you?
You must first register as a member.

Membership fees are RM300 for one year, RM50 for one month and RM25 for one week. There is a promotional rate now where instead of the annual RM300, you pay only RM50. For every 15 minutes of usage, you will be charged RM8. Minimum usage is 30 minutes which means every time you hop in, it’s a minimum of RM16.
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!

dimlys1994 liked this post

Last edited by nazrey; November 28th, 2017 at 08:57 AM.
nazrey no está en línea   Reply With Quote
Old November 30th, 2017, 07:34 AM   #2239
al-numbers
Registered User
 
Join Date: May 2016
Location: Shah Alam
Posts: 824
Likes (Received): 1327

Hooray for corruption! NOT.

Audit: Overdue KTM link to Skypark still incomplete, funds sat idle for five years



KUALA LUMPUR, Nov 27 — The already late extension linking the KTM Komuter line in Subang Jaya to the Subang Skypark Terminal remains unfinished while the previously extended contract also expired in June, according to federal auditors.

The Auditor-General’s Report for 2016 (Series 2) further highlighted that the RM142.75 million transferred in 2012 to the Railways Assets Corporation (RAC) for the extension has not even been touched.

The RM521 million project was commissioned in 2013 for completion last year, before receiving a time extension to June 2017.

In the entry, the Auditor-General urged the Transport Ministry to recall the RM142.75 million with applied interest and for it to impose penalties on the contractor for late delivery, among others.

“Stern action must be taken against the contractor by claiming liquidated and ascertained damages (LAD) for project not being on time, poor management of on-site issues, and not following project specifications,” the report said.

The original cost in planning the project also rose by RM21 million, the audit said.


Read more at http://www.themalaymailonline.com/ma...eIXKrvmBAdZ.99
__________________
“Violence for violence is the rule of beasts” - Barack Obama (in a dream, 2016)
al-numbers no está en línea   Reply With Quote
Old November 30th, 2017, 10:22 AM   #2240
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 91,217
Likes (Received): 11199

LINE 12: MRT SSP LINE
Ampang Park

Ampang Park_12-01-2017_058 by Kvmrt Mmcgamuda, on Flickr
AMPANG PARK STATION - FEB 17 by Kvmrt Mmcgamuda, on Flickr

Titiwangsa

SENTUL WEST STATION - JAN 17 by Kvmrt Mmcgamuda, on Flickr

Conlay

Conlay_12-01-2017_008 by Kvmrt Mmcgamuda, on Flickr

Bandar Malaysia

BDR Malaysia North_13-01-2017_048 by Kvmrt Mmcgamuda, on Flickr
__________________
Malaysia Photo Gallery - Click Here for Malaysia Galleries
City & Town - | Kuala Lumpur | Penang | Malacca | Putrajaya | Cyberjaya | Langkawi
Alor Setar, Ipoh, Johor Bahru, Kangar, Kota Bahru, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Seremban, Shah Alam, etc!
nazrey no está en línea   Reply With Quote


Reply

Tags
kuala lumpur

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 09:48 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium