daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old February 19th, 2015, 08:32 AM   #141
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

KunMing South Railway Station is located in the Chenggong Metro East Longtan mountain, belonging to Wu Jia Ying District administrative center of Kunming City, a distance of about 3 kilometers, about 7 kilometers away from the KunMing Railway Station to Dianchi, about 28 kilometers, is an important part of railway passenger transport system in Kunming hub, is one of the large Kunming area comprehensive transportation hub planning.
As an important hub node in Yunnan "eight into Yunnan, four exit" international railway channel, and the construction scale of the southwest region's largest a train passenger station, South Station to start construction in November 15, 2013, plans to vote in June 30, 2016. After completion, mainly to undertake the Yun Gui, Shanghai Kunming, Yu Kun, Cheng Kun, brother and other railway passenger dedicated line. At the same time, the introduction of Rail Transit Line 1 and line 4 of Chenggong branch, with bus and taxi station and other public traffic function facilities, the formation of large-scale comprehensive transportation hub, on the construction of city group in Central Yunnan, the construction of modern new Kunming has important significance.
KunMing South Railway Station design 16 to send the platform, a total of 30 line, a north-south. The railway line on both sides, both on passengers platform. Among them, the basic platform of a (450 meters long x width 18 metres x 1.25 metres high), intermediate 15 platforms (450 meters long x width 12 metres x 1.25 metres high). The total construction area of KunMing South Railway Station building project of 312836 square meters, of which the station building area of 120000 square meters, 77148 square meters of no station pole canopy, related area of 115689 square meters.
The station is completed, days for passenger cars will reach 303, of daily sending passengers will amount to 128000 person time, year send passengers up to 46930000 passengers, passenger traffic will exceed the current Kunming Changshui International Airport passenger flow.
Three layers of ground floor underground
KunMing South Railway Station with regional cultural characteristics of Kunming's unique, "peacock dance in spring city, beautiful bloom" as the theme, "peacock, flowers bloom" image meaning of the city of Kunming to open the spirit and hospitality. At the same time, using a variety of details and components such as language of architecture construction, express Kunming "ethnic blending, international exchange", "Southwest hub, South Gate" the Pearl of the plateau characteristics of the city.
South station has a total of 4 floors, three floors on the ground, the underground layer. Third on the ground floor is elevated layer, for the passenger waiting area off the main, there are 5 lane elevated, is arranged between the 1 spot Ma, is for safety on passengers prepared; elevated and tall towering passenger waiting hall, the middle hall filled with tens of thousands of Zhang Kaoyi, both sides of the seat is the 16 opening, which is entering the platform layer escalator export; on the escalator is on both sides of channel, visitors can through two channels on the side, to any one want to go to the mouth of the pit.
Level second is the main track layer and the platform layer; on the first layer (ground floor) to exchange hall, equipment space station channel and taxi hospitality area, spacious, here to have 70000 square meters of building area, in addition to some out of the station hall, is also planning a 1025 parking spaces.
Underground layer of the subway 1, 4 lines platform layer. This also means that, depending on where the subway line 1, line 4, will put the old train station and the new train station connected in series. The new train built, two train station will be through a clear division of labor after the operators at the same time, the train station south kiln mainly to meet existing lines of rail transport services, related services station is mainly responsible for the Yun Gui, Shanghai Kunming, Yu Kun, Cheng Kun, brother and other railway passenger dedicated line.
Waiting building has now to take shape
How to progress in construction of KunMing South Railway Station? At the end of last month, this reporter walked into the New South Station construction site field see, North elevated entered the main structure of the construction, the South viaduct has entered the stage of completion, B3 zone out of the station, a rail bearing layer and a cap layer overhead waiting layer steel structure hoisting construction basically completed, B4 zone out of the station layer construction completed. From afar in the waiting outside the building, the embryonic form of the peacock taking.
"Civil structural engineering has been completed 3/5, expected first half of this year to achieve civil ending, the second half of this year will enter the stage decoration." China Railway Construction Group KunMing South Railway Station project department secretary Huang Baosu, KunMing South Railway Station to complete 3 key node of steel structure at the end of this year: 7 Overall ascension is completed, the end of 10 metal roof sealing plate finish, curtain wall construction completed before 31 December. In 2016, the project will enter the equipment installation stage, opened for operation on June 30th.
"The waiting floor there is a feature to note." Huang Baosu introduced, in order to save land, KunMing South Railway Station uses bridge station room, bridge under the transfer traffic, bridge and the structure of new building mode, steel roof structure of the largest span of 66 meters.
Article two the end of next year and put into operation High-speed Rail synchronization
The first is the Shanghai Kunming passenger dedicated line. The Shanghai Kunming passenger line is the "long-term railway network planning" in the "four vertical and four horizontal" rapid passenger transport channel one, is a Shanghai East, West to Kunming east-west trunk railway. The Shanghai Kunming high-speed railway design speed of 250-350 km / h (Shanghai to Guiyang segments of 350 km / h, Guiyang Kunming section of 250 km / h, reserved to further speed conditions) high-speed railway passenger dedicated line level.
The three section construction of Shanghai Kunming passenger dedicated line, the "Shanghai Hangzhou section" opened in October 26, 2010; "Hangzhou section of" Hangzhou to Nanchang Nanchang to Changsha opened in December 10, 2014, opened in September 16, 2014; "long
双语对照
kunming tiger no está en línea   Reply With Quote

Sponsored Links
Old February 19th, 2015, 08:34 AM   #142
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

Line four should connect to the new HSR Kunming South Station.
kunming tiger no está en línea   Reply With Quote
Old February 27th, 2015, 10:59 AM   #143
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

Kunming plans to have 7 rail transit lines in operation with a total length of 225.9 km by 2020, 158.9 km of which is scheduled to be completed in the next five years.
There are three rail transit lines (No.1-3) to cover the downtown areas of Kunming. The No. 4 and 5, as the auxiliary rail transit lines, are expected to connect the downtown Kunming, Chenggong New Area, Dianchi Tourism Resort Area and the High-Tech Industrial Development Zone. The Line 6 will be the airport dedicated line. Moreover, the Line 7 will extend to cover the west and south of Kunming.
Here is a tentative list of the extended lines in the next five years:
Line 1 (the west extended line): starting from south Huancheng Lu(环城南路) to Xichang Lu(西昌路), with a total length of 4.2 km. It includes 4 subway stops.
Line 1 (tributary line): starting from Northern Chenggong Subway Station (呈贡北站) to Kunming Train Station (昆明火车站), with a total length of 5.2 km. It also includes 4 stops.
Line 1 (the north extended line): starting from Xichang Lu (西昌路) to North Jiaochang Lu (教场北路), with a total length of 3.7 km. It includes 3 stops.
Line 1 (the south extended line): starting from Kunming Radio and Television University (昆明广播电视大学) to North Gongyuan Lu (公园北路), with a total length of 7.3 km. It includes 3 elevated stops.
Line 2 (the second phase): starting from south Huancheng Lu (环城南路) to Suyu Cun (苏王村), with a total length of 1.1 km. It includes 5 subway stations and 3 elevated stations.
Line 3 (the second phase): starting from Shiju (石咀) to Xishan Park (西山公园), with a total length of 4 km. It includes 1 subway stations and 2 elevated stations. (Editor: Ryan Li)
Line 4: Dapuji to Bailongtan
Dapuji, Chenjiaying, Datangzi, Huangtu Po, Jinxiushan Zhuang, Bainishan, Xiaocaiyuan, Kunming North Train Station (Interchanges with Lines 2 and 5), Donghua, Dashuying (Line 3 interchange), Juhua East (Line 6 interchange), Kunming East Train Station, Economic Development Zone, Niujie Zhuang, Xiaoxi Cun, Chenggong (Line 1 interchange), Dounan, Chenggong South, Paomashan, Sports Center, Central Train Station (Line 1 interchange), Bailongtan...
__________________

VECTROTALENZIS liked this post
kunming tiger no está en línea   Reply With Quote
Old March 4th, 2015, 09:13 AM   #144
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

__________________

dimlys1994, geometarkv liked this post
kunming tiger no está en línea   Reply With Quote
Old March 4th, 2015, 09:18 AM   #145
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665



__________________

dimlys1994, dewlin07 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 4th, 2015, 09:24 AM   #146
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

Construction has started on Metro Line 6 terminus on Beijing Lu. Expected date of completion 2017 tbc. The interchange with Tang Zi Xiang station.
__________________

dimlys1994 liked this post

Last edited by kunming tiger; March 4th, 2015 at 09:31 AM.
kunming tiger no está en línea   Reply With Quote
Old March 7th, 2015, 06:42 PM   #147
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665




__________________

dimlys1994, dewlin07 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 7th, 2015, 06:46 PM   #148
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

tuo dong ti yu guan
kunming tiger no está en línea   Reply With Quote
Old March 7th, 2015, 06:57 PM   #149
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665



mg]http://i.imgur.com/BLbFFwA.jpg[/img]
__________________

dimlys1994 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 7th, 2015, 07:00 PM   #150
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

wuyi lu
kunming tiger no está en línea   Reply With Quote
Old March 7th, 2015, 07:05 PM   #151
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665



__________________

dimlys1994, dewlin07 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 7th, 2015, 07:07 PM   #152
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

dong feng guang chang
kunming tiger no está en línea   Reply With Quote
Old March 8th, 2015, 08:48 PM   #153
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

__________________

Zaz965 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 8th, 2015, 08:51 PM   #154
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

__________________

dimlys1994 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 9th, 2015, 02:40 PM   #155
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

__________________

dimlys1994 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 9th, 2015, 02:45 PM   #156
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

__________________

dimlys1994 liked this post
kunming tiger no está en línea   Reply With Quote
Old March 10th, 2015, 07:09 PM   #157
kunming tiger
Registered User
 
Join Date: Jun 2011
Location: kunming
Posts: 7,029
Likes (Received): 1665

__________________

dimlys1994 liked this post
kunming tiger no está en línea   Reply With Quote
Old October 22nd, 2015, 11:18 AM   #158
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,340
Likes (Received): 26131

kunming tiger, could you help me with one thing? Is Kunming North metro station open and if it yes, then when it was inagurated?
__________________

Zaz965 liked this post
dimlys1994 no está en línea   Reply With Quote
Old October 22nd, 2015, 08:59 PM   #159
CNGL
Leudimin
 
CNGL's Avatar
 
Join Date: Jun 2010
Location: Huesca
Posts: 7,457
Likes (Received): 1932

Huoche Beizhan appears to have been open for some time now. It is marked in Baidu Maps, and if any metro line is not there, is not open yet.

I'm more interested to know if any new lines have started construction recently, especially the last phases of lines 1 and 2.
__________________
Neque porro quisquam est qui dolorem ipsum, quia dolor sit amet, consectetur, adipisci velit, sed quia non nunquam eius modi tempora incidunt ut labore et dolore magnam aliquam quaerat voluptatem - Cicero, De finibus bonorum et malorum, from which placeholder text is derived.

dimlys1994, Zaz965 liked this post
CNGL no está en línea   Reply With Quote
Old October 22nd, 2015, 09:13 PM   #160
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,340
Likes (Received): 26131

Quote:
Originally Posted by CNGL View Post
Huoche Beizhan appears to have been open for some time now. It is marked in Baidu Maps, and if any metro line is not there, is not open yet.

I'm more interested to know if any new lines have started construction recently, especially the last phases of lines 1 and 2.
Don't worry, I found the answer:
http://www.gokunming.com/en/blog/ite...s_metro_line_2

Quote:
http://www.gokunming.com/en/blog/ite...s_metro_line_2

Reply on comment:

When this article was originally published, the North Railway Station was not open. It officially went in to operation September 1, 2014. Details have been added above
dimlys1994 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 07:18 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium