daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Continental Forums > Africa > North Africa > Algérie > Infrastructures et Transports > Autres Infrastructures

Autres Infrastructures Ponts, barrages, ports, immeubles, infrastructures culturelles et sportives



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old February 8th, 2011, 01:28 AM   #81
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Réctificatif : ces 2 images représentent la même centrale, celle de F'kirina(Oum El Bouaghi)

Quote:
Originally Posted by LYES View Post
Quote:
Originally Posted by LYES View Post


__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote

Sponsored Links
 
Old February 8th, 2011, 01:35 AM   #82
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Relizane Gas-fired Power Plant 465MW

3XGT13E2 gas turbines and 3X air cooled turbo-generators.

Cost : 445 million $

Completed on December 2009

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old February 24th, 2011, 04:10 PM   #83
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Centrale Electrique de Hassi Berkine – 3 turbine à gaz de 120 MW

Client : NUOVO PIGNONE S.p.A. - Italie

Propriètaire
: SONATRACH - Algerie


Localité
: Hassi Berkine - Algerie

Délais d'exécution : 1999-2001

Description : Activité de montage électromécanique

BUT DES TRAVAUX


Activités mécaniques électriques pour installation de la Centrale Electrique de 3 Turbine à gaz de 120 MW .
Les activités comprennent :

Construction du bac;
- Générateur de démarrage;
- Station de pompage gaz huile;
- Bac pour dépôt d’eau et Station de Pompage
- Magasin et usine
- Bâtiment de contrôle.

DONNEES TECHNIQUES

Les activités comprennent l'engineering et fourniture de la Centrale électrique
Les principales activités sont :
- Pose des câbles 280.00 m
- Structures en acier (bac, tuyauterie) 2200 t
- Fondations en béton armé 15.000 m³
- Surface totale des bâtiments 5.800m²

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old June 8th, 2011, 12:04 PM   #84
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old June 8th, 2011, 12:05 PM   #85
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old June 8th, 2011, 12:06 PM   #86
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old June 8th, 2011, 12:07 PM   #87
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old June 8th, 2011, 12:19 PM   #88
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old June 12th, 2011, 01:16 AM   #89
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Réalisation Montages Électromécaniques Centrale Electrique de M'sila
2X215 MW (M'sila)
(cf post 2)

Réalisé par SARPI (JV entre Sonatrach & ABB)
__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old January 23rd, 2012, 01:41 PM   #90
gms
Registered User
 
Join Date: Feb 2010
Posts: 9,330
Likes (Received): 2798

La 1ère station solaire thermique algérienne sera mise en service en 2016 (PDG Sonelgaz)

ALGER - La première station solaire thermique algérienne sera mise en service en 2016 dans la wilaya d’El Oued, a annoncé lundi le PDG du groupe Sonelgaz, Nourredine Boutarfa qui a précisé que les premières stations de ce genre seront construites dans le sud du pays.

"Nous comptons mettre en service les premières stations solaires thermiques en 2016-2017, la première station sera opérationnelle à El Oued avec une capacité de 150 MW", a déclaré M. Boutarfa à la Radio nationale.

Le dirigeant de Sonelgaz précise que l’Algérie a misé essentiellement sur le solaire thermique dans son programme de développement des énergies renouvelables vu l’avantage qu’il offre en matière de stockage de cette énergie.

Dans ce programme, Sonelgaz prévoit la réalisation de 67 projets de production d’électricité à partir des renouvelables, dont 27 centrales photovoltaïques, 27 centrales hybrides, 6 centrales solaires thermiques et 7 centrales éoliennes, selon des détails déjà dévoilés juin 2011 par la commission de régulation de l’électricité et du Gaz (Creg).

Les plus grandes centrales que l’Algérie va réaliser seront de type solaire thermique qu’elle compte notamment installer dans les régions du sud, dans les wilayas d’El Oued et de Bechar. La plus puissante centrale de ce type aura une capacité de 400 MW pour la partie solaire seulement.

L’Algérie compte investir 60 milliards de dollars pour produire à partir des renouvelables 12.000 MW d’électricité à l’horizon 2030, soit 40% de ses besoins à cette date, rappelle à ce propos M. Boutarfa.

Il note que le projet Desertec auquel l’Algérie a adhéré va permettre à Sonelgaz d’identifier les projets de partenariat avec les entreprises initiatrices de cette initiative industrielle pour produire et exporter de l’électricité solaire vers l’Europe.

Mais l’Algérie conditionne l’exportation vers ce continent par la mobilisation d’importants financements que le groupe Sonelgaz n’est pas en mesure de mobiliser à lui seul, et aussi par la réalisation des interconnexions nécessaires au transport de l’électricité.

Actuellement, l’Espagne et l’Italie par lesquels vont transiter les lignes de transport d’électricité, ne sont pas entièrement interconnectées au réseau électrique européen, précise M. Boutarfa.

Le projet d’intégration des réseaux électriques de la Méditerranée (Med-Ring) devra, selon lui, aider à réaliser l’interconnexion entre les pays des deux rives de la Méditerranée.

Source : APS
gms no está en línea   Reply With Quote
Old February 5th, 2012, 12:40 AM   #91
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Centrale du port de Annaba 36MW











__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old March 5th, 2012, 07:59 PM   #92
gms
Registered User
 
Join Date: Feb 2010
Posts: 9,330
Likes (Received): 2798

Réalisation prochaine d’une méga-centrale de production d’électricité à Cap Djinet (Boumerdes)

Quote:
BOUMERDES - Une méga-centrale de production de l’électricité d’une capacité de 1.200 mégawatt (MGW) sera réalisée "prochainement" dans la localité de Cap Djinet (Boumerdes), a-t-on appris auprès du directeur de l’Energie et des mines (DEM) de la wilaya.
Source : APS
gms no está en línea   Reply With Quote
Old March 6th, 2012, 01:20 AM   #93
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Extension of Alrar Power Station 60MW

Lump Sum Turn Key (LSTK) of a Power Generation Plant in the existing Sonatrach Oil Plant in Alrar. The station is equipped by 3 turbogenerators GE Frame 5 of nominal power of 20 MW and includes a medium voltage substation and overhead lines connection. The station is powered by two different fuel gases from the existing oil plants.

The Project include
:

GE Frame 5 Turbogenerator (3) located in two turbogenarator buildings
Fuel gas skids
Auxiliary facilities and fire fighting system
HV/MW switchgear station located in a relevant electrical building
New control room and administration building

Period : 2009 - 2012
Amount : € 115,000,000









__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old March 6th, 2012, 01:21 AM   #94
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Suite




__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old March 7th, 2012, 09:34 AM   #95
gms
Registered User
 
Join Date: Feb 2010
Posts: 9,330
Likes (Received): 2798

Une centrale électrique pour Timimoun


La Société algérienne de production de l’électricité (SAPE) veut construire une centrale de production d’énergie électrique en turbines à gaz d’une capacité de 2x25 MW à Timimoun dans la wilaya d’Adrar. La SAPE a en effet lancé ce mercredi 7 mars un appel d’offres national et international pour la fourniture d’une centrale électrique clés en main pour Timimoun. Les candidats doivent déposer leurs offres le lundi 23 avril. L’ouverture des plis aura lieu le même jour, selon la SAPE. Les offres doivent être accompagnées notamment d’une garantie bancaire de soumission d’un montant de 600 000 euros ou équivalent en dinars, soit 60 millions de dinars, a précisé la SAPE.

Source : TSA
gms no está en línea   Reply With Quote
Old April 11th, 2012, 07:03 PM   #96
LYES
Still Waiting Still
 
LYES's Avatar
 
Join Date: Oct 2010
Posts: 4,728
Likes (Received): 514

Centrale élctrique de M'sila

__________________
Truth is generally the best vindication against slander. Abraham Lincoln

LYES no está en línea   Reply With Quote
Old April 25th, 2012, 10:42 PM   #97
gms
Registered User
 
Join Date: Feb 2010
Posts: 9,330
Likes (Received): 2798


gms no está en línea   Reply With Quote
Old July 17th, 2012, 07:14 PM   #98
gms
Registered User
 
Join Date: Feb 2010
Posts: 9,330
Likes (Received): 2798

L’italien Ansaldo remporte un contrat de plus de 300 millions d'euros en Algérie


Quote:
Le groupe italien Ansaldo remporte un nouveau contrat dans la construction de centrales électriques en Algérie. Il réalisera à Hassi Messaoud une centrale électrique en turbines à gaz d’une puissance globale de 500 à 600 MW, a annoncé, ce mardi 17 juillet, la compagnie de l’engineering de l’électricité et du gaz (CEEG). Montant global du contrat : plus de 300 millions d’euros, dont une partie en dinars (5,3 milliards de dinars).
« L’étendue des prestations comprend notamment : conception, ingénierie, acquisition des équipements et matériaux, supervision des travaux de génie civil, ainsi que la construction, installation, essais et mise en service, formation, démarrage d’une centrale turbines à gaz de Hassi Messaoud d’une puissance de 500 à 600 MW aux conditions de site », précise CEEG dans un communiqué.

Ansaldo a déjà remporté plusieurs contrats dans la réalisation de centrales électriques en Algérie. En juillet 2007, le groupe italien a remporté un appel d’offres pour la réalisation de la centrale électrique de M'Sila. En juillet 2011, il s’est vu confier la réalisation de deux centrales électriques dans les wilayas de Khenchela et de Batna.
Source : TSA
gms no está en línea   Reply With Quote
Old August 13th, 2012, 11:24 PM   #99
soyous_2040
Algerian Citizen
 
soyous_2040's Avatar
 
Join Date: Sep 2009
Location: No where
Posts: 5,039
Likes (Received): 131

D’une puissance de 1 200 MW

Le groupe Daewoo construira une centrale électrique géante à Boumerdès

Quote:
Le groupe sud‑coréen Daewoo E&C a obtenu la réalisation d’une centrale géante de production d'énergie électrique en cycle combiné à Ras Djinet, dans la wilaya de Boumerdès d'une puissance de 1 200 MW pour plus de 753 millions d’euros, a indiqué ce lundi 13 août la Compagnie de l’engineering de l’électricité et du gaz (CEEG). Le groupe sud‑coréen est chargé de la « conception, l'ingénierie, la fabrication des matériels, l'acquisition des équipements et matériaux, la supervision des travaux de génie civil, les travaux de montage, l'installation, les essais, la mise en service des groupes, les garanties et la formation du personnel du client », selon la CEEG, filiale du groupe Sonelgaz. Le délai de réalisation est fixé à 40 mois. « C’est une extension de la centrale actuelle à turbine vapeur d’une puissance de 650 MW », explique un haut responsable de Sonelgaz.

Le marché a été attribué provisoirement à Daewoo E&C sur la base d’une offre financière constituée d’une partie en dinars de 13 003 847 459 DA, d’une partie en euros de 328 465 094 euros et d’une partie en dollars de 361 375 411 dollars US, selon la CEEG.

L’extension de la centrale électrique de Ras Djinet fait partie du projet de Sonelgaz de renforcer ses capacités de production d’électricité de 12 000 MW d’ici à 2016. Les pouvoirs publics ont décidé d’allouer une enveloppe de 2 000 milliards de dinars (environ 20 milliards d’euros) pour renforcer le parc national de production d’électricité en apportant une capacité additionnelle de 12 000 MW à l’horizon 2016, annonçait dimanche le ministre de l’Énergie et des Mines, Youcef Yousfi.

« L’extension de la centrale de Ras Djinet va coûter 40 % moins cher que celles de Koudiat Draouch et de Terga. À l’époque de l’attribution de ces deux centrales, il y avait beaucoup de tensions sur les centrales de production. La demande était très importante sur la réalisation de centrales électriques », explique un haut responsable de Sonelgaz. Le groupe public a également décidé d’ouvrir l’appel d’offres pour Ras Djinet « aux sociétés spécialisées dans l’assemblage et pas uniquement aux constructeurs de turbines à gaz comme c’était le cas pour Terga et Koudiat Draouch ». « Cette fois, l’appel d’offres pour Ras Djinet a été divisé en lots pour permettre aux entreprises algériennes de participer à la réalisation », ajoute le même responsable.
D’une puissance de 1 200 MW, la centrale de Terga, dans la wilaya de Aïn Temouchent, avait été confiée en 2008 au groupe français Alstom pour 1,35 milliard d’euros. Celle de Koudiat Draouch, dans la wilaya d’El Tarf, d’une même capacité, avait été attribuée la même année à l’américain General Electric pour 1.47 milliard d'euros.
Source: TSA
__________________
****Join us on our official facebook page****


Oran*est condamné à être une*métropole*méditerranéenne. C'est la géographie qui le veut, l'histoire qui l'oblige, la logique qui l'exige».
soyous_2040 no está en línea   Reply With Quote
Old August 13th, 2012, 11:41 PM   #100
tomorrowZZbetter
Registered User
 
tomorrowZZbetter's Avatar
 
Join Date: Dec 2010
Posts: 2,279
Likes (Received): 403

Quote:
Le groupe Daewoo construira une centrale électrique géante à Boumerdès
avec les milliards qu'il bouffe en Algerie que fait Daewoo pour le transfert de savoir faire et de technologie.
__________________
À quand la révolution esthétique ?
Savez vous qui sont "كلاب أهل النار"?
tomorrowZZbetter no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:43 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu