Old April 25th, 2015, 05:41 PM   #261
00Zy99
Registered User
 
Join Date: Mar 2013
Posts: 2,980
Likes (Received): 1507

Quote:
Originally Posted by Nexis View Post
SEPTA 2016-2027 Capital Plan

Not as much as Id hoped...no restored of Urban Trolleys or Regional Rail to West Chester or Newtown...

http://septa.org/strategic-plan/repo...6-proposal.pdf
23 and 56 have a place holder, just as they have for the last twenty years. I suspect that that's a sop to the Philadelphia government.

I was at a Montgomery County Planning Commission hearing and brought up the Newtown line. They basically said that they've given up on it.

On the other hand, they were talking about fully double-tracking the Warminster line and the Doylestown line, and re-opening Quakertown and Reading. All of the lines would have massive service expansions.
__________________

ChuckScraperMiami#1 liked this post
00Zy99 no está en línea   Reply With Quote

Sponsored Links
Old April 27th, 2015, 01:06 PM   #262
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Route 101 Trolley in Media,PA


SEPTA Kawasaki Trolley - Media, PA
by FlyingJ31, on Flickr
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section
Nexis no está en línea   Reply With Quote
Old April 27th, 2015, 11:53 PM   #263
towerpower123
Let's Revive our Cities
 
Join Date: Feb 2013
Location: Howell/Newark, NJ
Posts: 2,254
Likes (Received): 4188

Quote:
Originally Posted by Nexis View Post
The two stops are just under 1 mile apart. I do believe that they are far enough apart to keep both.
__________________
If I don't say otherwise, all of my images are on my blog,
http://urbanismvsmodernism.blogspot.com/?view=sidebar

186 Newark, NJ Development projects MAPPED
http://www.skyscrapercity.com/showthread.php?t=1874870
http://urbanismvsmodernism.blogspot....l?view=sidebar

See my DeviantArt account at http://towerpower123.deviantart.com/

ChuckScraperMiami#1 liked this post
towerpower123 no está en línea   Reply With Quote
Old April 28th, 2015, 12:07 AM   #264
towerpower123
Let's Revive our Cities
 
Join Date: Feb 2013
Location: Howell/Newark, NJ
Posts: 2,254
Likes (Received): 4188

Sound like very little new stuff in the master plan other than the extension of the Norristown High-speed to King of Prussia, which could use the transit. Septa needs to buy some multi-modal trains like NJ Transit bought. They could run on diesel in the suburbs and change to electric in the tunnels. It would allow them to reopen the diesel routes that were closed when they built the tunnel.
__________________
If I don't say otherwise, all of my images are on my blog,
http://urbanismvsmodernism.blogspot.com/?view=sidebar

186 Newark, NJ Development projects MAPPED
http://www.skyscrapercity.com/showthread.php?t=1874870
http://urbanismvsmodernism.blogspot....l?view=sidebar

See my DeviantArt account at http://towerpower123.deviantart.com/

ChuckScraperMiami#1 liked this post
towerpower123 no está en línea   Reply With Quote
Old April 28th, 2015, 05:31 AM   #265
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Quote:
Originally Posted by towerpower123 View Post
The two stops are just under 1 mile apart. I do believe that they are far enough apart to keep both.
The Station is only used by 60 people a day....and its a low level platform. So I can see why SEPTA wants to close it and others like it.
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old April 28th, 2015, 05:33 AM   #266
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Quote:
Originally Posted by towerpower123 View Post
Sound like very little new stuff in the master plan other than the extension of the Norristown High-speed to King of Prussia, which could use the transit. Septa needs to buy some multi-modal trains like NJ Transit bought. They could run on diesel in the suburbs and change to electric in the tunnels. It would allow them to reopen the diesel routes that were closed when they built the tunnel.
SEPTA is all Electrification or nothing...they hate diesel which is more costly to operate.
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old May 1st, 2015, 06:45 AM   #267
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Quote:
Claymont project could add 5,000 jobs

Jeff Mordock, The News Journal 8:16 p.m. EDT April 30, 2015


An artist’s rendering shows the First State Transit Center, part of the First State Crossing project proposed for Claymont.

CDC also will construct a new transit center on a 12-acre site roughly half a mile east of the existing Claymont Train Station. The transit center will include 600-foot passenger platforms, bus connections, 650 parking spaces, bike and pedestrian access and a ride dropoff area.

The First State Transit Center is expected to replace Claymont's current train station. Collins said the Delaware Department of Transportation expressed concern about the train station because of the lack of parking and that it sits on a section of curved track that could create a safety hazard.
Read More Here : http://www.delawareonline.com/story/...jobs/26663983/
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old May 1st, 2015, 07:28 AM   #268
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Photo by Exacto Creation

SEPTA Regional meets Amtrak Regional


septaamtkmeet
by ExactoCreation, on Flickr
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section
Nexis no está en línea   Reply With Quote
Old May 5th, 2015, 02:07 PM   #269
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Quote:
Record riders on Broad Street Line for Broad Street Run

Emily Babay, Philly.com
Posted: Monday, May 4, 2015, 2:09 PM

If it seemed like the subway was packed before and after Sunday's Broad Street Run - it was.

SEPTA said Monday that there were 88,510 trips on the Broad Street Line on Sunday, a record for the day of the annual 10-mile race.

Sunday's trips surpassed the previous record for race day, set last year, when there were 72,678 rides on the subway line.

.
Read more at http://www.philly.com/philly/busines...EoSJiC1llr8.99
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

dimlys1994, ChuckScraperMiami#1 liked this post

Last edited by Nexis; June 12th, 2015 at 04:27 AM.
Nexis no está en línea   Reply With Quote
Old May 28th, 2015, 02:17 AM   #270
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

SEPTA plans to spend $154 million on new locomotives

http://www.philly.com/philly/busines...comotives.html
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

dimlys1994, ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 12th, 2015, 04:25 AM   #271
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Planned SEPTA Regional Rail Station upgrades over the next 5 yrs


9th Street / New Station
Quote:
( Lansdale/Doylestown Line ) Work includes construction of a new ADA Accessible Regional Rail Station with high level platforms, passenger shelters, bicycle amenities, and parking lot.

- Number of Tracks : 1

- Budget: $3.8M

- Design Complete

- Construction Start: Spring 2015

- Construction Complete: Fall 2015
Ardmore Station
Quote:
(Thorndale Line) SEPTA is proposing several improvements to Ardmore Station, including a new station building, high level platforms, modifications to the existing pedestrian tunnel, new canopies and passenger shelters, and site and circulation improvements.

- Number of Tracks : 4

- Budget: $29.9M

- Design Ongoing

- Construction Start: Spring 2016

- Construction Complete: Fall 2019
Secane Station
Quote:
(Media/Elwyn Regional Rail Line)

Work includes a complete renewal of station facilities including a new station building with canopy, new high level platforms, pedestrian tunnel and significant parking facility expansion. Project also includes ADA enhancements.

- Number of Tracks : 2

- Budget: $21.3 M

- Design Ongoing

- Construction Start: Summer 2015

- Construction Complete: Spring 2017
Levittown
Quote:
(Trenton Regional Rail Line)

Work includes station improvements construction of high level platforms, elevators, pedestrian overpass, improved inter-modal service connections and parking expansion. Project also includes ADA enhancements.

Number of Tracks : 4

- Budget: $35.5 M

- Design Complete

- Construction Start: Summer 2015

- Construction Complete: Spring 2018

East Falls Station
Quote:
(Manayunk/Norristown Regional Rail Line)

Work includes modernization of station facilities and ADA accessibility improvements. Project also includes ADA enhancements.

- Number of Tracks : 2

- Budget: $19.5 M

- Design Start: Winter 2017

- Construction Start: Winter 2019

- Construction Complete: Winter 2021

Exton Station and Inter-Modal Improvements
Quote:
(Paoli/Thorndale Regional Rail Line)

SEPTA and Amtrak are partnering to implement overall station improvements to Exton Station. The project improvements will include the construction of high-level boarding platforms, ramps and stairs, a new station building, new canopies, and open air shelters. Upon completion of the improvements, Exton Station will be fully upgraded and ADA complaint. The new high-level platforms will also allow for more efficient operations.

- Number of Tracks : 3

- Budget: $23.4 M

- Design Complete

- Construction Start: Summer 2015

- Construction Complete: Spring 2017

Conshohocken Station
Quote:
(Manayunk/Norristown Regional Rail Line)

Work includes accessibility improvements. Project Budget $15M. Project also includes ADA enhancements.

- Number of Tracks : 2

- Budget: $15.0 M

- Design Start: Winter 2017

- Construction Start: Winter 2019
Yardley Station
Quote:
(West Trenton Line)

Work includes a complete renewal of station facilities including high level boarding platform, ADA compliant ramp and stairs, two open air shelters and a complete signage, site accessory and lighting upgrade.

- Number of Tracks : 3

- Budget: $5.5M

- Design: Complete

- Construction Start: Summer 2016

- Construction Complete: Fall 2017


- Construction Complete: Fall 2020
Source : http://septa.org/rebuilding/station/overview.html
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

dimlys1994, ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 14th, 2015, 05:40 AM   #272
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Trolley Routes 101 & 102 Modernization Project

Quote:
WHAT'S HAPPENING DURING THE PROJECT
  • Track: Street track renewal, grade crossing, track and surface replacement and replacement of wood bridge ties/timbers and walkway

  • Building & Bridges: General bridge structure repairs and maintenance; Whiskey Run Bridge (between Springfield Mall and Paper Mill Rd. Stations), superstructure replacement and substructure repairs

  • Power: Replacement of overhead trolley wire, vegetation clearing, tree trimming and installation of new trolley wire support structures in select locations

  • Communications & Signals: Completion of grade crossing warning device improvements (in Collingdale), and start of construction for new Communications-based train control (CBTC)

  • This project is part of Rebuilding for the Future, our infrastructure, investment and revitalization program that tackles a $5 billion backlog of projects, including bridge replacements, substation overhauls, and station improvements.
Source : http://www.septa.org/rebuilding/101-...rnization.html
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 14th, 2015, 05:45 AM   #273
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Catenary Replacements

Media/Elwyn Regional Rail Line Catenary Replacement

Quote:
Work includes replacing 17 miles of 80+ year old overhead catenary wire. Also includes construction of new catenary support poles.
  • Budget: $10.7 M

  • Design Complete

  • Construction Start: Spring 2014

  • Construction Complete: Winter 2017

30th St. West Catenary Replacement

Quote:
This project will replace and modernize the SEPTA overhead contact (catenary) system from 30th Street Station westbound to K and Zoo interlockings, an area that includes SEPTA's Powelton Yard. The work being performed also includes repairs to aging catenary support structures, foundations, retaining walls, tunnels, and site drainage.
  • Budget: $77.0 M
  • Design Start: Winter 2015
  • Construction Start: Winter 2018
  • Construction Complete: Fall 2020
Source : http://septa.org/rebuilding/power-in.../overview.html
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 14th, 2015, 06:03 AM   #274
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

SEPTA Bridge replacements / Overhauls

Media/Elwyn Regional Rail Line Crum Creek Viaduct (M.P 11.87)

Quote:
Work will replace this 925-foot-long, 100-foot-high bridge, which was originally constructed in 1895 and repaired in 1983.
  • Budget: $89.9M
  • Design Complete
  • Construction Start: Winter 2015
  • Construction Complete: Summer 2017
Construction Update: The contractor continues to construct the access road and stream crossings for the project.

Media/Elwyn Regional Rail Line Bridge Repairs

Quote:
Work will replace the timbers, complete superstructure and substructure steel repairs and reinforcement, and painting for the Cobbs Creek, Darby Creek, and Ridley Creek Viaducts. Work will be progressed in 2 phases. Phase 1 construction at Cobbs Creek and Darby Creek Viaducts included the replacement of existing timber ties, trackwork, and walkways with new materials and new safety railings. The top flange of the steel girders were also repaired and painted during the tie replacement process.

Phase 2 construction will include the same work as in Phase 1, for the Ridley Creek Viaduct, as well as structural repairs, painting, retaining walls, embankment stabilization and stream scour protection for all three Viaducts.
  • Budget: $35 M
  • Design Complete
  • Construction Start, Phase 2: Summer 2015
  • Construction Complete: Fall 2016
Construction Update: The construction contact has been awarded. Notice to proceed was issued on May 7, 2015.

Chestnut Hill West Regional Rail Line Bridge Repair

Quote:
Work will rehabilitate Bridge 0.35, constructed in 1916, spanning over the four track Main Line.
  • Budget: $10.3 M
  • Design Complete
  • Construction Start: Winter 2015
  • Construction Complete: Winter 2016

Construction Update: The contractor has begun demolishing concrete on the underside of the bridge. This will allow the contractor to repair the deteriorating gusset plates.

Regional Rail Stone Arch Bridge Rehabilitation Program
Quote:
Package No. 1: Bridge restoration and repair work will continue through the fall. The contractor is active at Bridge 16.88 (Norristown Transportation Center) on the Manayunk/Norristown Line and Bridge 13.10 (North Hills) on the Lansdale/Doylestown Line. The contractor recently mobilized to Bridge 22.93 (North Wales Station), also on the Lansdale/Doylestown Line. Work includes the stabilization, repair, and rebuilding of existing stone masonry.

Package No. 2: Bridge restoration and repair work will continue through the fall. The contractor is active at Bridge 12.38 (Rydal Station) and 20.21 (Trevose Station) on the West Trenton Line. The contractor is preparing to mobilize to Bridge 12.12 (Wallingford Station) on the Media/Elwyn Line. Work includes the stabilization, repair, and rebuilding of existing stone masonry and installation of steel arch liners.

Package No. 3: Bridge restoration and repair work will continue through the fall. The contractor is active at Bridge 9.41 (Ivy Ridge Station) and 9.93 (Miquon Station) on the Manayunk/Norristown Line. The contractor is preparing to mobilize to Bridge 4.61 (Allegheny Station) on the Manayunk/Norristown Line later this summer. Work includes the stabilization, repair, and rebuilding of existing stone masonry and installation of steel arch liners.
  • Budget: $8.3 M
  • Design Complete
  • Construction Start: Fall 2014
  • Construction Complete: Winter 2016

Construction Update: Work continues on bridges on the Manayunk/Norristown, Lansdale/Doylestown and West Trenton Lines. The Contractors have been active repairing brick and stone masonry and clearing debris from the waterway. Moving forward, the work shall include further masonry restoration and the installation of steel arch liners to reinforce the existing stone arches.
Source : http://septa.org/rebuilding/bridge-rehab/overview.html
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 14th, 2015, 06:23 AM   #275
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Substation Program | Regional Rail & Transit

The Substation Program will replace the major power components of the Regional Rail and Transit Traction Power Substations such as transformers, transformer breakers, trolley breakers, feeder switches, substation switchgears and protective relaying. The Regional Rail program work will focus on many substations originally built 80+ years ago. These projects will take place over the first 5 years of the Rebuilding for the Future Program, with budgets ranging from $3.4-50 million.

Lenni Substation (Media/Elwyn Regional Rail Line)

Quote:
Work includes new transformers, transformer breakers, trolley breakers, feeder switches, substation switchgear and protective relaying. This project will replace the major power components of the substation originally built in the 1920's.
  • Budget: $9.1 M
  • Design in Progress
  • Physical Construction Start: Winter 2015
  • Construction Complete: Summer 2016

Woodbourne Substation (West Trenton Line)

Quote:
This substation facility does not presently exist and will be a completely new design that will be located in/near the existing Woodbourne passenger station.
  • Budget: $27.5 M
  • Design Start: Winter/Spring 2017
  • Construction Start: Spring/Summer 2019
  • Construction Complete: Fall 2020

Morton Substation (Media/Elwyn Regional Rail Line)

Quote:
Work includes new transformers, transformer breakers, trolley breakers, trolley and feeder switches, substation switchgear and protective relaying. This project will replace the major power components of the substation originally built in the 1920's.
  • Budget: $9 M
  • Design in Progress
  • Physical construction start Fall 2015
  • Construction Complete: Fall 2016

Jenkintown Substation (Main Regional Rail Line)
Quote:
Work includes construction of a new Traction Power Substation with new transformers, indoor switchgear, state-of-the-art industry standard safety, protective relaying, and communications systems. In addition to the substation work, a new road will be constructed for improved access to the site.
  • Budget: $34 M
  • Design: Complete
  • Construction Start: Summer 2014
  • Construction Complete: Fall 2016

Current Update: Utilities, including PECO and stormwater lines, are being relocated. Site clearing is complete.

Ambler Substation (Lansdale/Doylestown Regional Rail Line)

Quote:
Work includes new transformers, trolley breakers, feeder breakers, substation switchgear and protective relaying. This project will replace the major power components of an 80+ year old substation.
  • Budget: $10.87 M
  • Design Complete
  • Phsyical construction start Fall 2015
  • Construction Complete: Fall 2016

Lansdale Substation (Lansdale/Doylestown Regional Rail Line)

Quote:
Work includes new transformers, trolley breakers, feeder breakers, substation switchgear and protective relaying. This project will replace the major power components of an 80+ year old substation.
  • Budget: $10.1 M
  • Design Start: Winter 2015
  • Construction Start: Winter 2016
  • Construction Complete: Summer 2017

Wayne Junction Static Frequency Converters (Main Regional Rail Line)
Quote:
This project is rehabilitating the existing three cycloconverter type static frequency converters that are located in a facility adjacent to SEPTA's Wayne Junction Substation. It is also adding a fourth frequency converter to the facility. The frequency converters change the 60 Hz power provided by PECO to the 25 Hz power used by the Regional Rail lines. The first phase of the project, currently underway, involves a condition assessment of the existing facilities, an evaluation of available converter upgrade technologies, and a cost benefit analysis of the rehabilitation alternatives. Subsequent phases will include final design and construction.
  • Budget: $55.8 M
  • Design Start: Winter 2015
  • Construction Start: Winter 2016
  • Construction Complete: Fall 2021


Bethayres Substation (West Trenton Regional Rail Line)

Quote:
Work includes new transformers, trolley breakers, feeder breakers, substation switchgear and protective relaying. This project will replace the major power components of an 80+ year old substation.
  • Budget: $11.5 M
  • Design Start: Winter 2016
  • Construction Start: Spring 2017
  • Construction Complete: Spring 2018

Chestnut Hill East Substation (Chestnut Hill East Regional Rail Line)

Quote:
Work includes new transformer, trolley breakers, feeder breakers, substation switchgear and protective relaying. This project will replace the major power components of an 80+ year old substation.
  • Budget: $7.2 M
  • Design Start: Winter 2016
  • Construction Start: Winter 2018
  • Construction Complete: Summer 2018

Hatboro Substation (Warminster Regional Rail Line)

Quote:
Work includes a new transformer, a new transformer breaker, and protective relaying. This project will replace the major power components of an 80+ year old substation.
  • Budget: $7.2 M
  • Design Start: Winter 2016
  • Construction Start: Summer 2019
  • Construction Complete: Winter 2020

Neshaminy Substation (West Trenton Regional Rail Line)

Quote:
Work includes new transformers, trolley breakers, feeder breakers, substation switchgear and protective relaying. This project will replace the major power components of an 80+ year old substation.
  • Budget: $9.8 M
  • Design Start: Winter 2016
  • Construction Start: Summer 2018
  • Construction Complete: Summer 2019

Yardley Substation (West Trenton Regional Rail Line)

Quote:
Work includes new transformers, trolley breakers, feeder breakers, substation switchgear and protective relaying. This project will replace the major power components of an 80+ year old substation.
  • Budget: $9.8 M
  • Design Start: Winter 2016
  • Construction Start: Fall 2019
  • Construction Complete: Fall 2020

Clifton Substation (Route 102 Sharon Hill Trolley)
Quote:
Project will replace 3 existing single phase rectifier-transformers and rectifier with a single new 3-phase rectifier-transformer and solid state diode rectifier with DC output of 650 Volts. Work includes new DC & AC switchgear, relay protection, new batteries and battery charging system.
  • Budget: $1.96 M
  • Design Complete
  • Physical construction start Summer 2015
  • Construction Complete: Winter 2016

City Transit Substations (Market-Frankford Line and Broad Street Subway)
Quote:
Work includes replacing and upgrading existing breakers, rectifiers, transformers, relays and switchgears at city transit substations:

(Market, Ranstead, Ellen, Park, Broad, Louden, Castor, and Center City Commuter Connection Switching Stations)
  • Budget: $40.6 M
  • Design Start: Winter 2016
  • Construction Start: Fall 2017
  • Construction Complete: Fall 2020
Source : http://septa.org/rebuilding/substation/overview.html
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 14th, 2015, 06:35 AM   #276
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Right of Way & Track

Quote:
The Right-Of-Way & Track Program will focus on the stabilization of soil and rock slopes, storm water control, erosion control, soil compaction, earth-bridge construction, sink holes in the right of way and track areas for Regional Rail and Transit as well as continuous welded rail, street track, and yard track work to ensure a state of good repair and improved travel conditions. Budgets will range from $3.9- 26 million.

Norristown High Speed Line Tie Replacement and Continuous Welded Rail

Quote:
Work includes tie and timber renewal, surfacing, subgrading, new third rail coverboard, and new special work including purchase of special equipment.
  • Budget: $26.0 M
  • Design Complete
  • Construction Start: Summer 2014
  • Construction Complete: Winter 2021

Construction Update: One element of the project is the replacement of a switch near Bryn Mawr Station. The entire turnout has been prefabricated at the 69th St. Yard. The turnout will be broken down and delivered to the installation location and installed at the end of April.

Route 11 Trolley - Main St. Track Reconstruction

Quote:
Work includes renewal of street track along Main St. between Island Ave. and Darby Loop.
  • Budget: $3.2 M
  • Design Complete
  • Construction completed in Summer 2014

Trolley Tunnel Track Improvements

Quote:
Work includes replacing continuous welded rail (CWR) in Center City Trolley tunnel. Work is concentrated in summer outages.
  • Budget: $7.5 M
  • Design Complete
  • Construction Start: Summer 2014
  • Construction Complete: Summer 2017

Rt. 15 Trolley Street Track Renewal

Quote:
This project includes the reconstruction of the Eastbound and Westbound tracks on Girard Avenue from the intersection of 3rd Street through the intersection of 7th Street and from just East of Frankford Avenue through the intersection of Susquehanna Avenue.
  • Budget: $3.5 M
  • Design Status: Ongoing
  • Construction Start: Spring 2015
  • Construction Complete: Fall 2015

Route 102 Sharon Hill Line Street Track

Quote:
Work includes renewal of street track along Woodlawn Ave and Springfield Rd, between North St. and West Madison Ave.
  • Budget: $5.5 M
  • In Construction
  • Construction Start: Summer 2015
  • Construction Complete: Spring 2016
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

mrsmartman, ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 14th, 2015, 06:44 AM   #277
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Communications & Signals
Quote:
The Communication & Signals Program involves the modernization and installment of emergency signals and systems, upgrades to computer aided radio dispatch systems, train control systems, as well as advancing upgrades to the systems used to enhance operational and customer communications including real time arrival information and AVPA. Project budgets range from $3.4-33 million.

Rt. 102 Trolley Grade Crossing Improvements

Quote:
Work includes safety improvements at 7 grade crossing locations: MacDade Blvd., Andrews Ave., Bartram Ave., Chestnut St., Walnut St., Broad St., Spruce St.,
  • Budget: $5.9 M
  • Design Complete
  • Construction Start: Winter 2015

Broad Street Line -Broad-Ridge Spur Signals

Quote:
Work includes signal upgrades and modernization to improve operational reliability for the train control systems on the portion of Spur track between Fairmount Interlocking and the 8th and Ridge Terminal Interlocking.
  • Budget: $6.5 M
  • Design Start: Winter 2015
  • Construction Start: Winter 2016
  • Construction Complete: Fall 2017

Real-Time Info/AVPA

Quote:
Work includes upgrades to communication systems that provide real-time arrival information to customers and deployment of new AVPA equipment at all Regional Rail and Transit Stations.
  • Budget: $26.5 M
  • Design Start: Spring 2015
  • Construction Start: Summer 2016
  • Construction Complete: Summer 2019

Computer Aided Radio Dispatch (CARD) System Replacement

Quote:
Work includes replacing the existing CARD System and retiring the existing 502Mhz radio system and replacing with a new state of the art CAD and communication network. Project Budget $32.5M.
  • Budget: $32.5 M
  • Design Start: Winter 2016
  • Construction Start: Winter 2018

Routes 101/102 Trolley Signal/Interlocking Improvements

Quote:
Work includes installation of a new state-of-the art Communications Based Train Control (CBTC) system that will provide include automatic enforcement of safe trolley separation and overspeed, and roadway worker protection. New power switching will be installed to facilitate operational flexibility to address planned maintenance, construction, and emergency conditions. Project Budget $33.0M.
  • Budget: $63.4 M
  • Design Complete
  • Construction Start: Summer 2015
  • Construction Complete: Summer 2018
Source : http://septa.org/rebuilding/communic.../overview.html
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

dimlys1994, ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 16th, 2015, 03:13 AM   #278
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

SEPTA announces Fortuna rail station will stay open, as talks slated on nearby housing project

http://www.thereporteronline.com/gen...medium=twitter
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 16th, 2015, 08:43 PM   #279
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Quote:
30th Street Station District Plan to reveal 3 bold diagrams for capping rail yards; seeks public feedback



Monday, June 15, 2015 By Jim Saksa

On Wednesday, the 17-member organization team led by Amtrak, Brandywine Realty Trust, Drexel University, PennDOT and SEPTA that is developing a comprehensive plan for the 30th Street Station District will unveil three diagrams to the public presenting differing ideas and concepts for the long-dreamt about area surrounding the train station.

PlanPhilly got a chance to preview the diagrams last week with Amtrak spokesman Craig Schulz and Natalie Shieh, Project Director for the 30th Street Station District Plan. Along with representatives from the rest of the team, Amtrak will host an open house at 30th Street Station Wednesday June 17, from 4:00 P.M to 7:00 P.M., and is looking for lots of public feedback.
Read More Here : http://planphilly.com/articles/2015/...ublic-feedback
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

dimlys1994, ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote
Old June 16th, 2015, 11:06 PM   #280
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17037

Quote:
Papal gridlock means bring your walking shoes [map]



By Tom MacDonald

"Only 31 of our systemwide 280 rail stations will be open for service," Casey said. "This will allow us to speed up service, recycle the trains to increase our system capacity." (See list of stations below).

Casey says special regional rail passes costing $10 per day will be sold in limited quantities beginning July 15. Each pass will only be valid for specific stations.

The Market Frankford El will only have two stops operating on each end. The Frankford Transportation Center, and Girard Avenue from the Northeast, and 69th and 52nd street from the west. They also have a special $10, three-day pass but tokens and transpasses can also be used on subways, trolleys and buses.
Read More Here :http://www.newsworks.org/index.php/l...king-shoes-map

SEPTA has lost its marbles , they should ask for neighboring agencies to provide extra rolling stock and run higher frequencies...
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

ChuckScraperMiami#1 liked this post
Nexis no está en línea   Reply With Quote


Reply

Tags
delaware, dilworth plaza, frankford, philadelphia, septa, union station

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 05:53 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium