Old July 11th, 2016, 08:42 PM   #881
Bitxofo
¡Viva el metro!
 
Bitxofo's Avatar
 
Join Date: Feb 2005
Location: Alderaan BCN BKK ATH PAR LON SYD SFO CPT TYO SCL CHC BUE SCG SVQ AGP BDN
Posts: 37,523
Likes (Received): 3671

Quote:
Originally Posted by arctic_carlos View Post
Some news:

FGC network:

Apparently Barcelona will get a new metro line! Well, I'm sorry to let you down, but it's just that L6 will be split into two different lines once upgrade works at Sarrià station are completed. L6 will be limited to Plaça Catalunya - Sarrià, while new L12 will be established between Sarrià and Reina Elisenda (yes, a one-station shuttle service).

Why? Because platforms at Sarrià are to be widened in order to install lifts and as a result one of the four tracks of the station will have to disappear in order to create the necessary extra space. Leaving the station with just 3 tracks, it could still be perfectly possible to run Plaça Catalunya - Reina Elisenda L6 services, but surprisingly the westernmost track of the station (where the Reina Elisenda branch starts) will only be linked to the southbound mainline track. Therefore, it won't be possible to run direct services between Plaça Catalunya and Reina Elisenda (while it could still be possible in the opposite way). In any case, the change won't take place until later this year or early next year.

TMB network:

Unfortunately, only two stations of L10 sud branch off L9 sud will be opened next year (Foneria and Foc-Cisell). The official reason is that only the city of Barcelona is advancing the necessary funds to the Catalan regional government to complete the works. Conversely, the neighboring city of L'Hospitalet de Llobregat is not willing to pay for the two stations that are located within its boundaries (Provençana and Ildefons Cerdà).

As a consequence, the interchange between L10 sud and FGC L8 in Ildefons Cerdà station won't be opened in the first phase, and we'll have to wait until the regional government can fund the construction of the remaining stations by itself. This issue is somehow ridiculous, as both Barcelona and L'Hospitalet de Llobregat are part of a bigger metropolitan area and municipal borders shouldn't be a key factor when dealing with mobility projects.
Not very good news...

There is no money now to finish the current works and the future projects.
__________________
www.urbanrail.net
Εγώ είμαι ο Νταβόρ!!
David (DavoR for my friends)
川添 Kawazoe (riverside) 海斗 Kaito (big dipper of the ocean), in Japanese.
Yo si la ciudad no tiene metro, como que no es gran ciudad y entonces ya paso de vivir allí. Norreport+12000

arctic_carlos liked this post
Bitxofo está en línea ahora   Reply With Quote

Sponsored Links
Old July 13th, 2016, 06:37 PM   #882
arctic_carlos
Recondita armonia
 
arctic_carlos's Avatar
 
Join Date: Dec 2007
Location: Sitges - Barcelona
Posts: 4,724
Likes (Received): 3945

Even though there's no money and works on the middle section of L9 haven't resumed yet, the Catalan regional government has just tendered the project of the FGC Llobregat-Anoia network extension (including L8) from Plaça Espanya to Gràcia (via Hospital Clínic and Francesc Macià):

However, this announcement only refers to an administrative step necessary to continue with the planning of the extension, construction won't start in the short term due to lack of funding (and the financial burden of the incomplete L9 project).
__________________
Wer kämpft, kann verlieren. Wer nicht kämpft, hat schon verloren.

Bertolt Brecht

dimlys1994 liked this post
arctic_carlos no está en línea   Reply With Quote
Old July 25th, 2016, 09:58 AM   #883
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,342
Likes (Received): 26132

__________________
Для Вас:
Страница в ВК:

For you:
Facebook & Flickr pages
dimlys1994 no está en línea   Reply With Quote
Old August 4th, 2016, 07:55 PM   #884
arctic_carlos
Recondita armonia
 
arctic_carlos's Avatar
 
Join Date: Dec 2007
Location: Sitges - Barcelona
Posts: 4,724
Likes (Received): 3945

A new official map showing the current state of L9 and L10 construction has been released (you can see a bigger image clicking on the link):

Quote:
Originally Posted by davroca5 View Post
Estat de les obres a la L9/10 al juliol. Miraculosament han posat un mapa amb els % d'obra

http://infraestructures.gencat.cat/a...mensual_L9.pdf | Imatge més gran





http://www.skyscrapercity.com/showpo...postcount=9071
Track laying continues in the L10 tunnel:

Quote:
Originally Posted by davroca5 View Post
Seguim... instal·lació de vía al pou de connexió entre túnel i viaducte al Carrer A.



Font: https://www.instagram.com/fertxo_2/

http://www.skyscrapercity.com/showpo...postcount=9078
__________________
Wer kämpft, kann verlieren. Wer nicht kämpft, hat schon verloren.

Bertolt Brecht

dimlys1994, Bitxofo, 437.001, austrian liked this post
arctic_carlos no está en línea   Reply With Quote
Old August 6th, 2016, 03:09 AM   #885
437.001
Sister Greed U
 
437.001's Avatar
 
Join Date: Mar 2009
Location: on the road (Spain)
Posts: 31,994
Likes (Received): 15423

L4 | Summer, tourists, beach... overcrowding.

Front cover of El Periódico de Catalunya newspaper yesterday, rather self-explanatory:





El Periódico de Catalunya (04/August/2016, article in Spanish)

Quote:
A class 9000 at Ciutadella-Vila Olímpica station:


Photo: ELISENDA PONS



An overcrowded class 2100 at Barceloneta station:


Photo: ELISENDA PONS



Map showing the area around Barceloneta and Ciutadella-Vila Olímpica stations, with the overcrowding hotspots:




And another article, but this one is from one year ago. Same story, but this year's more overcrowded...

El Periódico de Catalunya (30/August/2015, article in Spanish)

Quote:
Ciutadella-Vila Olímpica station entrance:


Photo: RICARD CUGAT



Barceloneta station entrance:


Photo: RICARD CUGAT



Inside a class 9000 train on L4:


Photo: RICARD CUGAT

Ciutadella-Vila Olímpica and Barceloneta stations would benefit from becoming double-ended stations.
Particularly the latter.

Two stations on L4 were turned into double-ended stations, those were Selva de Mar and Bogatell, which needed it a bit less.
I guess they ran out of money for the two that needed it most...
__________________
&&& abcde PMR en Cat ImpTgn Cat2017
Everybody got a job to lose (A.E, Vision Thing, WEA, 1990)
437.001 está en línea ahora   Reply With Quote
Old August 6th, 2016, 05:36 PM   #886
Sunfuns
Registered User
 
Join Date: Mar 2012
Location: Basel
Posts: 2,426
Likes (Received): 361

What is a double ended station? One with exits on both ends of the platform?
Sunfuns no está en línea   Reply With Quote
Old August 6th, 2016, 05:50 PM   #887
Bitxofo
¡Viva el metro!
 
Bitxofo's Avatar
 
Join Date: Feb 2005
Location: Alderaan BCN BKK ATH PAR LON SYD SFO CPT TYO SCL CHC BUE SCG SVQ AGP BDN
Posts: 37,523
Likes (Received): 3671

Yes!


And also Jaume I & Urquinaona stations are very overcrowded now at the beach season...
__________________
www.urbanrail.net
Εγώ είμαι ο Νταβόρ!!
David (DavoR for my friends)
川添 Kawazoe (riverside) 海斗 Kaito (big dipper of the ocean), in Japanese.
Yo si la ciudad no tiene metro, como que no es gran ciudad y entonces ya paso de vivir allí. Norreport+12000

Tågälskaren, 437.001, dimlys1994 liked this post
Bitxofo está en línea ahora   Reply With Quote
Old August 6th, 2016, 08:05 PM   #888
437.001
Sister Greed U
 
437.001's Avatar
 
Join Date: Mar 2009
Location: on the road (Spain)
Posts: 31,994
Likes (Received): 15423

L2 | Summer works between La Pau and Badalona Pompeu Fabra.

As usual since many years, L2 has had its summer closure for works between La Pau and Badalona Pompeu Fabra.

This section of L2 used to belong to L4, although it was intended to be a part of L5 then L2 right from the start.

Its construction started much earlier than it entered service, and, wether it was the constructive method used, the quality of materials, or the shallow water table, there have always been problems with infiltrations on this section, which have led to periodic closures, as it seems that the line deteriorates here much faster than on the rest of the network.

Here are some images of the works between Artigues-Sant Adrià and Gorg stations.

Quote:
Originally Posted by DavidVazGuijarro View Post














__________________
&&& abcde PMR en Cat ImpTgn Cat2017
Everybody got a job to lose (A.E, Vision Thing, WEA, 1990)

metr0p0litain, dimlys1994, kbbcn liked this post

Last edited by 437.001; August 6th, 2016 at 08:19 PM.
437.001 está en línea ahora   Reply With Quote
Old August 6th, 2016, 10:17 PM   #889
gincan
Gincan
 
Join Date: Feb 2006
Posts: 888
Likes (Received): 184

Quote:
Originally Posted by 437.001 View Post
As usual since many years, L2 has had its summer closure for works between La Pau and Badalona Pompeu Fabra.

This section of L2 used to belong to L4, although it was intended to be a part of L5 then L2 right from the start.

Its construction started much earlier than it entered service, and, wether it was the constructive method used, the quality of materials, or the shallow water table, there have always been problems with infiltrations on this section, which have led to periodic closures, as it seems that the line deteriorates here much faster than on the rest of the network.
Must be shoddy construction and probably poor engineering, metros around the world are subject to enormous water filtrations without any problems. It can obviously be fixed with proper engineering but that require serious funding.

Stockholm metro for example has over 1100 water pumps installed expelling 47.000 cubic meters of water every single day and they have never needed to close down for renovations because of water damage.
__________________

437.001 liked this post

Last edited by gincan; August 6th, 2016 at 10:32 PM.
gincan no está en línea   Reply With Quote
Old August 6th, 2016, 11:07 PM   #890
437.001
Sister Greed U
 
437.001's Avatar
 
Join Date: Mar 2009
Location: on the road (Spain)
Posts: 31,994
Likes (Received): 15423


And L9 north between Bon Pastor and Can Peixauet, L9 south between Can Tries-Gornal and Aeroport T1, L10 between Bon Pastor and Llefià and between La Salut and Gorg, L4 between Ciutadella and Jaume I, L3 between Liceu and Paral.lel, and... L1 between Bellvitge and Hospital de Bellvitge, and L1 between Trinitat Vella and Santa Coloma, they all also run on humid soils, or even below sea level, and don't have these problems.

The section between La Pau and Pep Ventura was started in the mid-1970's (just the last days of Franco's).
As you say, probably cheap materials and bad engineering, yes.
__________________
&&& abcde PMR en Cat ImpTgn Cat2017
Everybody got a job to lose (A.E, Vision Thing, WEA, 1990)

Bitxofo liked this post

Last edited by 437.001; August 6th, 2016 at 11:15 PM.
437.001 está en línea ahora   Reply With Quote
Old August 8th, 2016, 03:40 AM   #891
gincan
Gincan
 
Join Date: Feb 2006
Posts: 888
Likes (Received): 184

Quote:
Originally Posted by 437.001 View Post
The section between La Pau and Pep Ventura was started in the mid-1970's (just the last days of Franco's).
As you say, probably cheap materials and bad engineering, yes.
L4 had lots of issues during construction so it is not surprising they have to repair the tunnels all the time. Come to think of it, the original L2 between Parallel and Sagrada Familia was built just before (1968-1973) and that was even worse.

They basically had to rebuild the whole line when it was restarted in the 1980s which is why it took 3 years longer than was planned, entire sections of the original tunnel was demolished and rebuilt because of substandard materials.
gincan no está en línea   Reply With Quote
Old September 2nd, 2016, 02:50 AM   #892
437.001
Sister Greed U
 
437.001's Avatar
 
Join Date: Mar 2009
Location: on the road (Spain)
Posts: 31,994
Likes (Received): 15423

L2 | Summer works between La Pau and Badalona Pompeu Fabra.

Quote:
Originally Posted by 437.001 View Post
As usual since many years, L2 has had its summer closure for works between La Pau and Badalona Pompeu Fabra.

This section of L2 used to belong to L4, although it was intended to be a part of L5 then L2 right from the start.

Its construction started much earlier than it entered service, and, wether it was the constructive method used, the quality of materials, or the shallow water table, there have always been problems with infiltrations on this section, which have led to periodic closures, as it seems that the line deteriorates here much faster than on the rest of the network.
Well... so the works are finished, and L2 has reopened between La Pau and Badalona Pompeu Fabra.

According to the regional government, this was the final cut of a series that have lasted for many years, and which were part of a masterplan to improve the tunnels and tracks, to make them less prone to infiltrations.

A sort of small-scale "Paris RER C Travaux Castor" thing, so to speak.

I hope that's true, and L2 won't get any more cuts for a long while.

And I also hope our regional government and TMB will be more transparent in the future (wishful thinking, sadly).
__________________
&&& abcde PMR en Cat ImpTgn Cat2017
Everybody got a job to lose (A.E, Vision Thing, WEA, 1990)

dimlys1994 liked this post

Last edited by 437.001; September 2nd, 2016 at 02:58 AM.
437.001 está en línea ahora   Reply With Quote
Old September 3rd, 2016, 02:47 PM   #893
Anotherme
Registered User
 
Anotherme's Avatar
 
Join Date: Feb 2015
Posts: 1,828
Likes (Received): 4171

Barcelona MA Integrated Railways Network

September 2016 Official New Map


Downloads:

AM Integrated Raiways NetworK : http://doc.atm.cat/ca/xarxa_ferrov_global.pdf
Central Area Railways Network: http://doc.atm.cat/ca/xarxa_ferrov_central.pdf
__________________

C O L · I V L · A V G · F A V · P A T · B A R C I N

Last edited by Anotherme; September 3rd, 2016 at 03:56 PM.
Anotherme no está en línea   Reply With Quote
Old September 3rd, 2016, 07:04 PM   #894
437.001
Sister Greed U
 
437.001's Avatar
 
Join Date: Mar 2009
Location: on the road (Spain)
Posts: 31,994
Likes (Received): 15423

Quote:
Originally Posted by Anotherme View Post
Barcelona MA Integrated Railways Network

September 2016 Official New Map
Can't be possible, the map you show is out of date, there's no L9 south on it, and no Sabadell FGC extension phase 1.

I have a newer ATM map than that.

The links to the maps you posted are correct though.
__________________
&&& abcde PMR en Cat ImpTgn Cat2017
Everybody got a job to lose (A.E, Vision Thing, WEA, 1990)
437.001 está en línea ahora   Reply With Quote
Old September 3rd, 2016, 11:56 PM   #895
arctic_carlos
Recondita armonia
 
arctic_carlos's Avatar
 
Join Date: Dec 2007
Location: Sitges - Barcelona
Posts: 4,724
Likes (Received): 3945

And the new map also shows "new" FGC L12 line.
__________________
Wer kämpft, kann verlieren. Wer nicht kämpft, hat schon verloren.

Bertolt Brecht
arctic_carlos no está en línea   Reply With Quote
Old October 11th, 2016, 08:01 PM   #896
Woonsocket54
PC LOAD LETTER
 
Woonsocket54's Avatar
 
Join Date: May 2005
Location: East Millinocket, Maine
Posts: 5,644
Likes (Received): 5761

is any active work taking place on linking the two ends of L9 through northern Barcelona?
Woonsocket54 no está en línea   Reply With Quote
Old October 11th, 2016, 09:25 PM   #897
arctic_carlos
Recondita armonia
 
arctic_carlos's Avatar
 
Join Date: Dec 2007
Location: Sitges - Barcelona
Posts: 4,724
Likes (Received): 3945

No. Just works on the L10 sud branch off L9 sud.
__________________
Wer kämpft, kann verlieren. Wer nicht kämpft, hat schon verloren.

Bertolt Brecht
arctic_carlos no está en línea   Reply With Quote
Old October 11th, 2016, 11:39 PM   #898
Woonsocket54
PC LOAD LETTER
 
Woonsocket54's Avatar
 
Join Date: May 2005
Location: East Millinocket, Maine
Posts: 5,644
Likes (Received): 5761

Quote:
Originally Posted by arctic_carlos View Post

Unfortunately, only two stations of L10 sud branch off L9 sud will be opened next year (Foneria and Foc-Cisell).
So there will just be a shuttle between the two stations that won't connect to anywhere else?
Woonsocket54 no está en línea   Reply With Quote
Old October 12th, 2016, 12:00 AM   #899
arctic_carlos
Recondita armonia
 
arctic_carlos's Avatar
 
Join Date: Dec 2007
Location: Sitges - Barcelona
Posts: 4,724
Likes (Received): 3945

No.

Presumably there will be through service from Collblanc* station to Foc-Cisell station, meaning that L10 sud services will also call at Torrassa and Can Tries Gornal stations on the shared section with L9 sud, besides Foneria station on L10 sud branch. Consequently L10 sud will have connections with L1, L5 and L9 sud from day one.

*There's only one operational track between Collblanc and Zona Universitària stations, that's why L10 services won't reach that station in this first phase.
__________________
Wer kämpft, kann verlieren. Wer nicht kämpft, hat schon verloren.

Bertolt Brecht
arctic_carlos no está en línea   Reply With Quote
Old October 12th, 2016, 12:35 AM   #900
Woonsocket54
PC LOAD LETTER
 
Woonsocket54's Avatar
 
Join Date: May 2005
Location: East Millinocket, Maine
Posts: 5,644
Likes (Received): 5761

would this be at the expense of L9 service to the airport, or would L9 Sud frequency remain unchanged?
Woonsocket54 no está en línea   Reply With Quote


Reply

Tags
barcelona, spain in the world

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 03:10 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium