daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old July 31st, 2005, 01:36 AM   #1
Xing500
Registered User
 
Xing500's Avatar
 
Join Date: Sep 2002
Location: O'Fallon IL(ST LOUIS)/ CHICAGO IL
Posts: 177
Likes (Received): 0

St. Louis Metrolink - Plans for Downtown Loop, North, South, and West Line Advance

METROLINK



Planning for new MetroLink extensions advances
By Phil Sutin
Of the Post-Dispatch
07/30/2005


The federal highway bill includes $410 million for two expansions, including one from downtown to points north, west and south.

Plans for expanding MetroLink took two steps forward this week, but money to build future projects still is not in sight.

Congress authorized spending $410 million for two expansions in a six-year, $286.5 billion transportation bill. The House passed the measure, and the Senate followed suit.

The East-West Gateway Council of Governments hired a team of consultants on Wednesday to plan part of an expansion north, south and west from downtown St. Louis.

The projects in the transportation bill call for spending:

$275 million for 28 miles of an expansion north, south and west of downtown St. Louis. If fully developed, the expansion would extend MetroLink from a loop in downtown St. Louis north to St. Louis Community College at Florissant Valley, south to Interstate 55 near the South County shopping mall and west to West Port Plaza.

$135 million for 11 miles of an extension of MetroLink south of Shrewsbury. That expansion would go along either the Burlington Northern Railroad right of way or the River Des Peres to Interstate 55, ending at Butler Hill Road. Metro is building an extension to Shrewsbury from Forest Park that it expects to open by Oct. 31 next year.

The importance of Congress' action is not the money, but putting the projects on the bureaucratic and political table for future action. Before construction begins, lawmakers have to appropriate the federal share and regional officials have to come up with the local one.

However, the money in the federal authorizations may not be close to the cost of the two expansions. The highest cost estimate of the extension south of Shrewsbury is $700 million, and engineers have yet to determine the cost of the north-south-west extension.

Money from a quarter-cent transit sales tax in St. Louis and St. Louis County, the main source for local financing of MetroLink expansion, is tied up retiring bonds for an expansion now under construction.

Reporter Phil Sutin
E-mail: [email protected]
Phone: 314-863-2812

__________________
XING
Xing500 no está en línea   Reply With Quote

Sponsored Links
Old July 31st, 2005, 11:22 PM   #2
samsonyuen
SSLL
 
samsonyuen's Avatar
 
Join Date: Sep 2003
Location: Canary Wharf > CityPlace
Posts: 8,350
Likes (Received): 314

Wow, that'd be great!
samsonyuen no está en línea   Reply With Quote
Old August 1st, 2005, 12:56 AM   #3
cjfjapan
Registered User
 
cjfjapan's Avatar
 
Join Date: Oct 2004
Posts: 1,276
Likes (Received): 140

Very good news for St. Louis--it will definitely aid the rebuilding of the center city. now I just wonder if the rest of the money will be forthcoming in the future, to actually finish the projects. It seems like many cities around the US hit the jackpot with transit funding in this bill...
cjfjapan no está en línea   Reply With Quote
Old August 2nd, 2005, 12:41 AM   #4
samsonyuen
SSLL
 
samsonyuen's Avatar
 
Join Date: Sep 2003
Location: Canary Wharf > CityPlace
Posts: 8,350
Likes (Received): 314

Are MO (or IL) chipping in any?
samsonyuen no está en línea   Reply With Quote
Old August 4th, 2005, 11:48 PM   #5
Xing500
Registered User
 
Xing500's Avatar
 
Join Date: Sep 2002
Location: O'Fallon IL(ST LOUIS)/ CHICAGO IL
Posts: 177
Likes (Received): 0

St. Louis (USA) MetroLink LightRail Images

Here are a few images I took of MetroLink, put together over the months.



__________________
XING
Xing500 no está en línea   Reply With Quote
Old August 4th, 2005, 11:52 PM   #6
HighSpeedTrain
BANNED
 
Join Date: Jul 2005
Location: Mexico City, North America
Posts: 188
Likes (Received): 0

looks really cool the metrolink, btw nice to see you on this forum Xing500
HighSpeedTrain no está en línea   Reply With Quote
Old June 25th, 2007, 12:33 PM   #7
hkskyline
Hong Kong
 
hkskyline's Avatar
 
Join Date: Sep 2002
Posts: 86,962
Likes (Received): 18223

St. Louis' light rail system gaining popularity with developers
24 June 2007

ST. LOUIS (AP) - Ridership in the St. Louis region's light rail system is rising steadily, and developers are capitalizing on mass transit's popularity.

Developers of a 550-acre office, industrial and retail development in St. Louis County are only half a mile from a MetroLink station.

And they've pledged $3 million toward a new station planned for the project site.

"I enjoy telling people we will be served by two MetroLink stations," said Chris McKee, president of McEagle Properties. "I really see it as a competitive advantage."

Other developers are pitching proximity to the St. Louis region's light-rail system as a bonus for tenants. Projects worth about $750 million are being built or planned near MetroLink stations, as developers capitalize on heightened interest in mass transit.

The MetroLink system opened its first line in July 1993.

In April, almost 81,000 people rode the light-rail system every day, up from 65,663 in April 2006. Ridership was projected to exceed 86,000 daily passengers by 2020, but that should happen by 2010, Larry Salci, Metro's president and chief executive, told the St. Louis Post-Dispatch.

Nearly 21.9 million riders are expected to use MetroLink this year, a 32 percent increase over the almost 16.6 million last year.

The addition last August of the 8.2-mile cross county extension, along with realigning the bus routes that feed MetroLink, has helped to increase ridership, Salci said.

"Connectivity is what was missing before," he said.

As a result, Salci said, more developers are working with MetroLink to create mixed-use developments -- those that include offices, retail and residential components -- with access to public transportation.

"MetroLink is becoming a marketing tool," Salci said.

It was for NorthPark, as developers tried to attract the national headquarters and main campus of Vatterott College, whose students rely on public transportation. They succeeded, and construction has started.

The light-rail system also is getting attention from people such as Ryan Wachter, a professional who finds it a convenient alternative to cars.

Wachter, 27, is buying a condo in the St. Louis suburb, Brentwood, less than two blocks from the MetroLink station.

He uses it regularly to get to work, baseball games and to the airport.

One developer's marketing materials tout it as a "Transit Oriented Development," capitalizing on its location near a MetroLink station.

Such developments are cropping up all over the nation, said Thomas Bisacquino, president of the National Association of Industrial and Office Properties.

"People will pay a premium to be in a good-size mixed-use infill project with access to mass transit," he said.

Reconstruction of Highway 40 in St. Louis and its suburbs, and impending road closures, have created a greater awareness about public transportation, and it is much higher on people's priority lists, said Andrew Checkley, project manager for a condominium development.
__________________
Hong Kong Photo Gallery - Click Here for the Hong Kong Galleries

World Photo Gallery - | St. Petersburg, Russia | Pyongyang | Tokyo | Istanbul | Dubai | Shanghai | Mumbai | Bangkok | Sydney

New York, London, Prague, Iceland, Rocky Mountains, Angkor Wat, Sri Lanka, Poland, Myanmar, and much more!
hkskyline no está en línea   Reply With Quote
Old June 25th, 2007, 05:02 PM   #8
goldbough
Registered User
 
Join Date: Jun 2007
Posts: 1,020
Likes (Received): 3366

I've already ridden the entire length of the STL lines, so I guess I'll go back in 20 years when the rest of it is finished.
goldbough no está en línea   Reply With Quote
Old June 26th, 2007, 10:54 PM   #9
newyorkrunaway1
Skyscraper Guru
 
newyorkrunaway1's Avatar
 
Join Date: Nov 2004
Posts: 835
Likes (Received): 8

this project would be amazing for st louis!! i hope it makes it all hte way there!
newyorkrunaway1 no está en línea   Reply With Quote
Old April 8th, 2010, 05:04 AM   #10
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17045

ST LOUIS | Public Transport

Map

http://en.wikipedia.org/wiki/File:STL_MetroLink.svg

Planned & Proposed Expansions



http://www.thetransportpolitic.com/2...-improvements/

number of stations : 37

Daily Ridership : 61,573

headway : 5 mins

system length : 46 miles

number of lines : 2


http://world.nycsubway.org/perl/show?46607


http://world.nycsubway.org/perl/show?69771

MetroLink Train in East St Louis Illinois



Metrolink Meet



~Corey
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

n20 liked this post

Last edited by desertpunk; December 16th, 2013 at 03:33 AM. Reason: fix video
Nexis no está en línea   Reply With Quote
Old August 19th, 2010, 12:01 AM   #11
Nexis
Dark Wolf
 
Nexis's Avatar
 
Join Date: Aug 2007
Location: Along the Rails of North Jersey..
Posts: 15,688
Likes (Received): 17045

St. Louis’ Loop District Gets Endorsement from Feds with Grant for Streetcar


http://www.thetransportpolitic.com/2...for-streetcar/
__________________
My FLICKR Page < 54,100+ Photos of Urban Renewal , Infrastructure , Food and Nature in the Northeastern US
Visit the Reorganized New York City Section
My Photography Website
Visit the New Jersey Section

n20 liked this post
Nexis no está en línea   Reply With Quote
Old November 12th, 2010, 11:44 PM   #13
diablo234
Oh No He Didn't
 
diablo234's Avatar
 
Join Date: Aug 2008
Posts: 5,297


Metrolink - Big Bend Station




Metrolink - Convention Center Station
diablo234 no está en línea   Reply With Quote
Old November 13th, 2010, 03:48 AM   #14
manrush
Agenda 21 Advocate
 
manrush's Avatar
 
Join Date: May 2008
Location: Urban New England
Posts: 4,150
Likes (Received): 499

Metrolink is somewhat reminiscent of Edmonton's LRT.

I like Metrolink. It's one of the more underrated light rail systems in North America.
manrush no está en línea   Reply With Quote
Old November 14th, 2010, 08:48 AM   #15
diablo234
Oh No He Didn't
 
diablo234's Avatar
 
Join Date: Aug 2008
Posts: 5,297












Last edited by diablo234; November 27th, 2010 at 01:27 AM.
diablo234 no está en línea   Reply With Quote
Old November 18th, 2010, 04:54 AM   #16
diablo234
Oh No He Didn't
 
diablo234's Avatar
 
Join Date: Aug 2008
Posts: 5,297













Photos by Calvin Henry-Cotnam
diablo234 no está en línea   Reply With Quote
Old November 28th, 2010, 01:02 AM   #17
diablo234
Oh No He Didn't
 
diablo234's Avatar
 
Join Date: Aug 2008
Posts: 5,297

Some photos of Gateway Station which serves as the Amtrak and Greyhound Station for St. Louis.







Last edited by diablo234; November 28th, 2010 at 01:07 AM.
diablo234 no está en línea   Reply With Quote
Old November 28th, 2010, 05:34 PM   #18
starrwulfe
ご乗車頂いてありがとうございます。
 
starrwulfe's Avatar
 
Join Date: Nov 2010
Location: Yokohama
Posts: 777
Likes (Received): 469

Glad to see they FINALLY built Gateway Station... Native STL here- great pix.
starrwulfe no está en línea   Reply With Quote
Old November 28th, 2010, 09:04 PM   #19
Woonsocket54
PC LOAD LETTER
 
Woonsocket54's Avatar
 
Join Date: May 2005
Location: East Millinocket, Maine
Posts: 5,668
Likes (Received): 5791

how does one transfer from the Gateway station to Metrolink? Is there a spooky walk through an abandoned parking lot?
Woonsocket54 no está en línea   Reply With Quote
Old November 29th, 2010, 01:09 AM   #20
diablo234
Oh No He Didn't
 
diablo234's Avatar
 
Join Date: Aug 2008
Posts: 5,297

Quote:
Originally Posted by Woonsocket54 View Post
how does one transfer from the Gateway station to Metrolink? Is there a spooky walk through an abandoned parking lot?
The Civic Center Metrolink basically stops just right outside the complex, not that far of a walk.
diablo234 no está en línea   Reply With Quote


Reply

Tags
metrolink, st. louis

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 08:23 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium