Old December 24th, 2012, 04:11 AM   #1701
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

Still about 10 months away . Rafters are placed at last and will be erected from smallest to largest.
Otie no está en línea   Reply With Quote

Sponsored Links
Old December 24th, 2012, 07:25 AM   #1702
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

Erection of the lower portal frames was suspended last days because of rain. Work will resume after New Year.
Otie no está en línea   Reply With Quote
Old December 24th, 2012, 03:38 PM   #1703
Swiddle
Registered User
 
Swiddle's Avatar
 
Join Date: Feb 2008
Location: Raleigh, NC
Posts: 912
Likes (Received): 297

Despite being Christmas Eve, there are plenty of workers on site this morning and it appears they may be getting ready to place another piece.
Swiddle no está en línea   Reply With Quote
Old December 26th, 2012, 07:20 PM   #1704
ChuckInTN
Registered User
 
ChuckInTN's Avatar
 
Join Date: Jul 2012
Posts: 176
Likes (Received): 40

I see a ladder truck, ambulance, staff truck, and pumper on site with a hose pulled. I hope all is OK.
ChuckInTN no está en línea   Reply With Quote
Old December 26th, 2012, 07:47 PM   #1705
Beber
Registered User
 
Join Date: Oct 2009
Posts: 617
Likes (Received): 1493

There was a fire at the Memorial. You can check the Memorial's thread for more.
Beber no está en línea   Reply With Quote
Old December 27th, 2012, 04:12 AM   #1706
SidewalkSuper
Registered User
 
Join Date: Jan 2012
Posts: 69
Likes (Received): 5

We got Christmas present from EarthCam!

Check it out!

SidewalkSuper no está en línea   Reply With Quote
Old December 27th, 2012, 04:23 AM   #1707
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

I see two new lower portal frames on site, making 10.
Otie no está en línea   Reply With Quote
Old December 27th, 2012, 03:20 PM   #1708
The Engineer
Structural Engineer
 
The Engineer's Avatar
 
Join Date: Nov 2008
Posts: 878
Likes (Received): 109

It looks like if there are already 2 parts in place. If you check the KPI cam you can see some white parts sticking out. That makes the total of 12.
The Engineer no está en línea   Reply With Quote
Old December 27th, 2012, 05:23 PM   #1709
ChuckInTN
Registered User
 
ChuckInTN's Avatar
 
Join Date: Jul 2012
Posts: 176
Likes (Received): 40

Are there two more portal frames on site, or were they stacked, and now not stacked?
ChuckInTN no está en línea   Reply With Quote
Old December 27th, 2012, 06:32 PM   #1710
Beber
Registered User
 
Join Date: Oct 2009
Posts: 617
Likes (Received): 1493

They were stacked.
Beber no está en línea   Reply With Quote
Old December 27th, 2012, 07:48 PM   #1711
ChuckInTN
Registered User
 
ChuckInTN's Avatar
 
Join Date: Jul 2012
Posts: 176
Likes (Received): 40

Beber, thanks for the info on the fire.

And thankfully, nobody was hurt.
ChuckInTN no está en línea   Reply With Quote
Old December 28th, 2012, 05:47 PM   #1712
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

One of ten already in place, looks like the western crane lifted it.

Otie no está en línea   Reply With Quote
Old December 28th, 2012, 06:33 PM   #1713
RealVooDoo
Registered User
 
Join Date: Aug 2007
Location: Roma
Posts: 3,552
Likes (Received): 980

So that's should be the 3rd overall, as two were already in place since last week
__________________
“Danni senza precedenti all’immagine della capitale” ha detto Alemanno riassumendo il suo mandato. Spinoza.it 15-12-2010
RealVooDoo no está en línea   Reply With Quote
Old December 28th, 2012, 11:10 PM   #1714
Olympic Lad
Registered User
 
Join Date: Jan 2012
Posts: 90
Likes (Received): 6

Looks like 5 of the portal frames are now installed. Gonna start getting super exciting soon!
Olympic Lad no está en línea   Reply With Quote
Old December 29th, 2012, 12:06 PM   #1715
phenix1999
Registered User
 
Join Date: Dec 2012
Posts: 3
Likes (Received): 0

Quote:
Originally Posted by Olympic Lad View Post
Looks like 5 of the portal frames are now installed. Gonna start getting super exciting soon!
phenix1999 no está en línea   Reply With Quote
Old December 29th, 2012, 12:09 PM   #1716
phenix1999
Registered User
 
Join Date: Dec 2012
Posts: 3
Likes (Received): 0

phenix1999 no está en línea   Reply With Quote
Old December 30th, 2012, 11:01 PM   #1717
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

Snow on site... pretty dangerous to work under those conditions.
Otie no está en línea   Reply With Quote
Old January 1st, 2013, 09:28 AM   #1718
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

First steel beam placed for World Trade Center Oculus project

Quote:
Last week in New York City, Skanska Koch placed the first steel beam for the dramatic Oculus building that will be the centerpiece of the World Trade Center Transportation Hub. We have a $204 million contract to erect the Oculus, designed by architect Santiago Calatrava.

The first beam – called a sub portal – weighed approximately 15,000 lbs. Next to each sub portal there will be an alternate piece called a lower portal, which will each weigh between 26,000 lbs. and 34,000 lbs. The sub portals and lower portals will alternate each other; this pattern will form the Oculus’ unique shape that is similar to a bird in flight.

To place the Oculus’ roughly 11,000 tons of structural steel – all being fabricated in Italy – Koch has erected two specialized tower cranes custom made for this project. The completed structure will stand 150 feet at its highest point.

The steel and glass Oculus structure will bring natural light to the 300,000-SF center hall concourse that includes a balcony walkaway above, similar to Grand Central Station.

Also on the World Trade Center site, USA Civil and USA Building are reconstructing the PATH Hall train station under a separate contract worth more than $600 million; the Oculus will be the top portion of the train station.


Otie no está en línea   Reply With Quote
Old January 1st, 2013, 09:32 AM   #1719
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

Each of the lower portals and subportals are diferent, even though they look identical.

Lower portals are in blue, subportals on red.

Otie no está en línea   Reply With Quote
Old January 1st, 2013, 09:34 AM   #1720
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

I share this one, model made by PMadFlyer

Otie no está en línea   Reply With Quote


Reply

Tags
port authority, santiago calatrava, world trade center, wtc

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 05:46 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu