Hyderabad Roads & Flyovers
IU's edit: thread title changed. Please use this thread for all road and flyover projects in the Hyderabad met region.
___ Outer Ring Road is a game changing mega infrastructure project of Hyderabad that is currently under progress and is expected to be complete by 2012. Equally important, Radial Roads connecting the core city (Inner Ring Road) to the ORR. Total number of radial roads ~ 33 Planned total cost = 2500 crores. Starting the NH7 road that connects core city to the new Airport, the radial roads are numbered 1 to 29 in the clock wise direction in the following map. ORR & Radial Roads Map (click on it to view large)
Last edited by IndiansUnite; July 26th, 2010 at 03:57 AM. |
|
|
|
|
|
#2 |
|
Registered User
Join Date: Mar 2009
Posts: 250
Likes (Received): 20
|
Radial roads miss deadline
http://www.deccanchronicle.com/hyder...s-deadline-298
Hyderabad, Oct. 9: The Cash-strapped Hyderabad Metropolitan Development Authority (HMDA) expects to develop only seven out of the proposed 33 radial roads by December 2010, the deadline for completion of all the roads. The radial roads were proposed to improve connectivity to the outer ring road (ORR) from various parts of the city. About Rs 2,500 crore are required to widen all the radial roads to four and six lanes depending upon the feasibility and the number of private properties to be acquired. Of the estimated total, Rs 750 crore is needed for land acquisition. The officials are confident of completing the seven radial roads by the deadline because the Japan International Cooperation Agency (JICA) has agreed to provide Rs 350 crore loan of the required Rs 480 crore. A senior official in HMDA said the radial roads, some of which are presently as narrow as 30 feet at several places, were identified after a traffic study. The road development plan includes widening, construction of footpath, median, and beautification works. The HMDA officials are planning to request the government to direct GHMC, R&B and Panchayat Raj department to bear the cost of the remaining 26 radial roads as these stretches fall under their respective jurisdictions. Earlier, the state government had requested the Centre to release the required money under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) for these roads. But the Centre rejected the proposal citing that such roads do not fall in the priority list of JNNURM. Efforts are on to ensure that the remaining 26 roads are completed along with ORR by March 2012, the official said |
|
|
|
|
|
#3 |
|
Registered User
Join Date: Mar 2009
Posts: 250
Likes (Received): 20
|
Radial Roads Completed
The following radial roads are completed so far
- NH7 connecting to IRR to Shamshabad Airport (RR1 - Radial Road 1) - NH9 connecting IRR to ORR from LB Nagar to Pedamberpet (RR24) - NH7 connecting IRR to ORR at Medchal (RR12) there are few other RR's that are currently in progress but couldn't confirm their completion based on the google maps. |
|
|
|
|
|
#5 |
|
Registered User
Join Date: Aug 2008
Posts: 62
Likes (Received): 0
|
|
|
|
|
|
|
#6 |
|
Registered User
Join Date: Mar 2009
Posts: 250
Likes (Received): 20
|
Radial Road 29 or P7 Road
RR29 also called P7 road is an L shaped road that runs parallel to "NH7" & "Srisailam State Highway" and is alternate route connecting IRR to the new Airport.
Looks like the road is almost complete based on the following google pictures. ![]() ![]() Stretches that are yet to be complete..... ![]() Cross-section of the P7 road - Very well planned road. jpg
Last edited by su_hyd; July 13th, 2010 at 01:09 AM. |
|
|
|
|
|
#7 |
|
Registered User
Join Date: Mar 2009
Posts: 250
Likes (Received): 20
|
Radial Road 2 (IRR <to> Himayat Sagar)
It's almost complete...or may be already complete... ![]() ![]() Couple of stretches under progress....
|
|
|
|
|
|
#8 |
|
Registered User
Join Date: Mar 2009
Posts: 250
Likes (Received): 20
|
Another completed Radial Road (RR30) - Road connecting Gachibowli > Financial District > ORR
|
|
|
|
|
|
#9 | |
|
Registered User
Join Date: Mar 2006
Posts: 5,709
Likes (Received): 1
|
Date:26/07/2010 URL: http://www.thehindu.com/2010/07/26/s...2659110300.htm
Quote:
|
|
|
|
|
|
|
#10 |
|
->
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,478
|
|
|
|
|
|
|
#11 |
|
Registered User
Join Date: Aug 2008
Posts: 62
Likes (Received): 0
|
which flyover is this? the kphb-mmts-hitech city one??
|
|
|
|
|
|
#12 |
|
->
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,478
|
Yes. Here's the location on google maps
|
|
|
|
|
|
#13 |
|
Registered User
Join Date: Aug 2008
Posts: 62
Likes (Received): 0
|
ok. So its yet another one. The one i thought is a railway ROB just north of this one on same road. That one has been in construction forever due to SCR. I feel railway ministry is so inefficient in India.
|
|
|
|
|
|
#14 |
|
Registered User
Join Date: Dec 2006
Location: New York / Hyderabad
Posts: 158
Likes (Received): 0
|
Across India, even in highway projects, most of the four laning work will be completed and the only portion that will be delayed generally is a rail over bridge. I have seen tons of examples for these kind of situations. I just don't know why no one does anything about this.
|
|
|
|
|
|
#15 | |
|
Registered User
Join Date: Mar 2009
Posts: 250
Likes (Received): 20
|
I agree with you on this....managing critical path items (rail over bridge, flyover) in a project is key for success of any infrastructure project. Unfortunately, dealing with Indian Railways is painfully slow.
Quote:
|
|
|
|
|
|
|
#16 |
|
Registered User
Join Date: Aug 2008
Posts: 62
Likes (Received): 0
|
update on peripheral ring road
|
|
|
|
|
|
#17 |
|
Registered User
Join Date: Aug 2008
Posts: 62
Likes (Received): 0
|
eenadu
Railway permissions delay Kukatpally RoB & Shamshabad RoB. *SCR has repeated delayed HMDA's structural designs for kukatpally RoB (connecting cyber towers to JNTU) in the past two years. Construction is expected to take atleast another year. *work on Shamshabad ROB is slow as SCR is giving permission for 4/5 hrs work every one or two days due to train traffic. |
|
|
|
|
|
#18 |
|
Registered User
Join Date: Aug 2008
Posts: 62
Likes (Received): 0
|
Sakshi
New Flyover at Tolichowki Jn. The Jn is major connecting mehadipatnam, gachibowli, qutubshahi tombs (golkonda also) and banjara hills, leading to high traffic volumes. Very old Hanuman temple in the middle of Jn is a major bottleneck leading to frequent accidents. GHMC to appoint consultant to carry out feasibility study. |
|
|
|
|
|
#19 |
|
Registered User
Join Date: Jun 2010
Location: Hyderabad
Posts: 168
Likes (Received): 8
|
8-lane roads on the anvil
In a move to decongest entry points into the city, the National Highway Authority of India (NHAI) has proposed eight-laning on two important stretches of road — Erragadda-Patancheru and Malakpet-LB Nagar. The NHAI released Rs 100 crore for the project which will also have service roads on both sides of the highway.
![]() A meeting of high-level officials of various departments convened by R&B principal secretary, Ms Lakshmi Parthasarathy, on Thursday discussed the plan of action for implementing the project. Officials of GHMC, metro water works and Central power discom were also present. Sources said the NHAI informed that it was ready to lay the road provided the state authorities make the land available . Presently, the road width on these two stretches varies between 100 ft and 120 ft. “The NHAI proposed to make the width a uniform 200 ft,” a senior official said. According to a preliminary survey, about 600 structures would have to be either partially or fully demolished. Electric poles and water and sewerage lines would have to be shifted and trees translocated. The exact cost the state has to bear will be arrived at after thorough inspection property-wise, an official pointed out.Widening the two roads would help the metro project as one line passes through these two stretches. |
|
|
|
|
|
#20 |
|
Registered User
Join Date: Jul 2010
Posts: 388
Likes (Received): 0
|
Source: Time of India
HMDA master plan for peripheral ring road Koride Mahesh, TNN, Aug 2, 2010, 03.07am IST HYDERABAD: Even as Hyderabad Metropolitan Development Authority (HMDA) is struggling to complete the 162-km Outer Ring Road (ORR) by 2012, it has drawn up another ambitious plan to build Peripheral Ring Road (PRR) in the authority's extended area. The urban development authority has incorporated Peripheral Ring Road covering 250 kms in the surrounding areas in the recently released draft master plan for the extended master plan. The 45-metre (about 200 feet) road would connect areas like Chevella, Sankarpally, Sangareddy, Toopran, Agapally, Bibinagar, Shadnagar and Choutuppal in Ranga Reddy, Medak, Mahbubnagar and Nalgonda districts. As per the draft plan, the HMDA has identified 25 urban pockets with a population of up to 2.5 lakh and urban centres where settlements have come up and have potential to grow. HMDA officials said PRR would have connectivity to urban pockets and urban centres which are growing in peripheral areas. Arterial roads have been proposed in the master plan to increase connectivity between the extended area and core Hyderabad Urban Development Area (Huda). If the centres are well connected with roads, railways and provided amenities, burden on the developed areas would come down. "PRR is planned in view of future needs and growth. It will be taken up after completion of ORR and will be targeted for the next 10 years," HMDA member planning, A V Bhide, told TOI. Officials said the population under HMDA would be 1.8 crore by 2031 and so the need for creation of multiple nuclei centres. The newly-included areas of HMDA would have a population of around 47 lakh by 2031 and there is a need for well-connected road network. Giving emphasis in the draft master plan for transportation and road network, the HMDA has proposed 60m, 45m and 18 metre wide roads at growth pocket level apart from MMTS and railway terminals. HMDA's extended area is about 4,920 sq kms, comprising 635 settlements, including 26 uninhabited villages and seven urban settlements. |
|
|
|
![]() |