daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > World Forums > Stadiums and Sport Arenas > Completed


Reply

 
Thread Tools Display Modes
Old July 24th, 2010, 05:51 PM   #41
ibaguectura
BANNED
 
Join Date: May 2008
Location: Madrid-Ibague
Posts: 2,165
Likes (Received): 0

clear that serious and work finished or white


claro eso ya seria acabados o obra blanca que llaman
ibaguectura no está en línea   Reply With Quote

Sponsored Links
 
Old July 26th, 2010, 07:30 PM   #42
ibaguectura
BANNED
 
Join Date: May 2008
Location: Madrid-Ibague
Posts: 2,165
Likes (Received): 0

The does one ask the north platform and south tendran that to be painted for that the type of chairs does not cover the rest ..........??? Bony as those who have back if there is no need for which the back covers the totality of the platform of concretly

una pregunta la tribuna norte y sur tendran que ser pintadas por que el tipo de sillas no tapa el resto..........??? osea como las que tienen espaldar si no hay necesidad por que el espaldar tapa la totalidad de la tribuna de concreto
ibaguectura no está en línea   Reply With Quote
Old July 26th, 2010, 10:37 PM   #43
jucaro1970
Registered User
 
jucaro1970's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 525
Likes (Received): 0

ibaguecturaThe does one ask the north platform and south tendran that to be painted for that the type of chairs does not cover the rest ..........??? Bony as those who have back if there is no need for which the back covers the totality of the platform of concretly

All the platforms are going to be painted, an alone color was unified for the platforms and other one for the corridors and exits, (one is going to take from them these colors that it has nowadays), that are horrifying.

Todas las tribunas van a ser pintadas, se unificara un solo color para las tribunas y otro para los corredores y salidas, (Se les va a quitar esos colores que tiene actualmente), que son horrorosos.
jucaro1970 no está en línea   Reply With Quote
Old July 27th, 2010, 02:35 AM   #44
faga1
Registered User
 
faga1's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 273
Likes (Received): 5

horrifying ???? Is ew (lol), looks like a circus


¿¿¿¿Horroroso????? Es un asco, parece un circo
__________________
¡Déjate atrapar por el halo del ayer de la aldea y el presente de la urbe!
__________________
Pereira
1 5 0 A ñ o s
faga1 no está en línea   Reply With Quote
Old July 27th, 2010, 11:21 PM   #45
jucaro1970
Registered User
 
jucaro1970's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 525
Likes (Received): 0

Julio 27 de 2.010
Details of exteriors in front and accesses.
Detalles de exteriores en fachada y accesos.

Last edited by jucaro1970; September 17th, 2010 at 03:31 PM.
jucaro1970 no está en línea   Reply With Quote
Old July 28th, 2010, 04:22 AM   #46
jonathan_pereira
redescubriendo
 
jonathan_pereira's Avatar
 
Join Date: Aug 2007
Location: Pereira & Medellín
Posts: 895
Likes (Received): 48

thanks for the actualization Jucaro, I've got a question: ¿When they start to disassemble the light towers?

Final question: When they start whit the west and north tribunes?
__________________
De Neguanje a los Naranjos: Un relato acerca del parque Tayrona.

http://www.skyscrapercity.com/showthread.php?t=1316103
jonathan_pereira no está en línea   Reply With Quote
Old July 28th, 2010, 06:00 AM   #47
jucaro1970
Registered User
 
jucaro1970's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 525
Likes (Received): 0

Quote:
Originally Posted by jonathan_pereira View Post
thanks for the actualization Jucaro, I've got a question: ¿When they start to disassemble the light towers?
Final question: When they start whit the west and north tribunes?
The felling of the towers this one programmed in order that it is effected by the contractor of Western and the platforms north and Western they must be being awarded On July 30 to be initiating works on approximately August 15, besides cover it must be initiating planes of workshop in 30 days approximately.
El desmonte de las torres esta programado para que sea efectuado por el contratista de Occidental y las tribunas norte y Occidental deben estar siendo adjudicadas el 30 de Julio para estar iniciando trabajos aproximadamente el 15 de Agosto, ademas de cubierta debe estar iniciando planos de taller en 30 dias aproximadamente.
jucaro1970 no está en línea   Reply With Quote
Old July 28th, 2010, 03:44 PM   #48
xxcopetexx
Registered User
 
xxcopetexx's Avatar
 
Join Date: Jul 2009
Posts: 636
Likes (Received): 21

Great advances, I'm really looking forward to go to Colombia next year for this event!!!! Just got a quick question, how are you guys translating your comments, I have to read them in Spanish for the most part to actually understand what you are trying to say... Everything else looks great, though. Keep us updated Jucaro, I appreciate how you keep us all informed of how the stadium keeps changing! Thanks
xxcopetexx no está en línea   Reply With Quote
Old July 28th, 2010, 10:17 PM   #49
jota227
EsTo Es VaLlEnAtO pUrO...
 
jota227's Avatar
 
Join Date: Sep 2009
Location: Valledupar-Sta marta
Posts: 134
Likes (Received): 2

yes jucaro........u are doing an amazing job thanks
__________________
Xeneize since 05
jota227 no está en línea   Reply With Quote
Old July 29th, 2010, 02:40 PM   #50
kumenasai
Registered User
 
kumenasai's Avatar
 
Join Date: Jun 2009
Location: Logroño - Pereira - Bilbao
Posts: 1,938
Likes (Received): 29

great thread, a pity that in the forums Colombians did not have room for but .. better here so more people can see it and say, thanks for the contributions

gran hilo, una pena que en los foros colombianos no haya tenido cabida, pero..mejor aquí, así más gente podrá verlo y opinar; gracias por los aportes jucaro
kumenasai no está en línea   Reply With Quote
Old July 29th, 2010, 04:31 PM   #51
angello2121
Registered User
 
angello2121's Avatar
 
Join Date: Nov 2006
Location: columbus, OH
Posts: 20
Likes (Received): 0

I hope they finish it on time!

Espero que lo terminen a tiempo!
angello2121 no está en línea   Reply With Quote
Old July 30th, 2010, 03:15 AM   #52
jucaro1970
Registered User
 
jucaro1970's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 525
Likes (Received): 0

July 29 of 2.010
Today they stop installing the girders of flight of steps Orientally in the top platform


Julio 29 de 2.010
Hoy se terminan de instalar las vigas de graderia de Oriental en la tribuna superior.

Este es el modelo de los palcos para personas con movilidad reducida PMR (10)x palco mas acompañante.
This is the model of the theater boxes for persons with limited mobility PMR (10) x theater box and accompanist.

Last edited by jucaro1970; September 17th, 2010 at 03:31 PM.
jucaro1970 no está en línea   Reply With Quote
Old July 30th, 2010, 03:31 AM   #53
faga1
Registered User
 
faga1's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 273
Likes (Received): 5

__________________
¡Déjate atrapar por el halo del ayer de la aldea y el presente de la urbe!
__________________
Pereira
1 5 0 A ñ o s
faga1 no está en línea   Reply With Quote
Old July 30th, 2010, 04:23 AM   #54
Andreij88
Registered User
 
Join Date: May 2009
Location: Bucarest / Dubrovnik
Posts: 16
Likes (Received): 0

I couldn't see the pics. I already have been watching the video rendering. Parabens, it seems a very good project!!
Andreij88 no está en línea   Reply With Quote
Old July 30th, 2010, 03:21 PM   #55
xxcopetexx
Registered User
 
xxcopetexx's Avatar
 
Join Date: Jul 2009
Posts: 636
Likes (Received): 21

Jucaro, will those concrete bleachers on top of the steps be removed and then the seats installed on the steps or are the new seats going to be mounted on top of these structures???

Jucaro, Yo no conozco el estadio personalmente, pero por las fotos veo que hay como un tipo de bancas encima de la graderia, mi pregunta es, las sillas nuevas las van a instalar encima de estas estructuras o van a tumbar esas "bancas" y montar las sillas nuevas directamente encima de las graderias???
xxcopetexx no está en línea   Reply With Quote
Old July 30th, 2010, 03:39 PM   #56
jucaro1970
Registered User
 
jucaro1970's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 525
Likes (Received): 0

Quote:
Originally Posted by xxcopetexx View Post
Jucaro, will those concrete bleachers on top of the steps be removed and then the seats installed on the steps or are the new seats going to be mounted on top of these structures???

Jucaro, Yo no conozco el estadio personalmente, pero por las fotos veo que hay como un tipo de bancas encima de la graderia, mi pregunta es, las sillas nuevas las van a instalar encima de estas estructuras o van a tumbar esas "bancas" y montar las sillas nuevas directamente encima de las graderias???
This stadium was constructed in 1.971-1.974, in his moment the step was of 0.30x0.70 and to shape the height they constructed a banking him give I make concrete of 10 cms of high place, this banking is not demolished, simply there are reconstructed in places that one needs and on this one it is less complicated to install the chair, since the screw crosses the plate and it is possible to check the anchorage, the step that nowadays the fifa requests must be of 0.40x0.80 minimally.

Este estadio fue construido en 1.971-1.974, en su momento la grada estaba de 0.30x0.70 y para conformar la altura le construyeron una banca en concreto de 10 cms de alto, esta banca no se demuele, simplemente se reconstruye en los lugares que se necesite y sobre esta es menos complicado instalar la silla, puesto que el tornillo atraviesa la placa y se puede verificar el anclaje, la grada que hoy en dia solicita la fifa debe ser de 0.40x0.80 minimo.
jucaro1970 no está en línea   Reply With Quote
Old July 30th, 2010, 10:13 PM   #57
jucaro1970
Registered User
 
jucaro1970's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 525
Likes (Received): 0

In the following images, one sees the complementary building that was initiating construction in approximately 15 days, is a structure of 6 floors included the basement of the tunnel of access, where they find modules of Offices, Press, VIP and VVIP. (The parkings that sen see do part of another stage of construction).

En las siguientes imagenes, se ve el edificio complementario que iniciara construccion en aproximadamente 6 dias, es una estructura de 6 pisos incluido el sotano del tunel de acceso, en donde se encuentran modulos de Oficinas, Prensa, VIP y VVIP. (Los parqueaderos que sen ven hacen parte de otra etapa de construccion).

Last edited by jucaro1970; September 17th, 2010 at 03:32 PM.
jucaro1970 no está en línea   Reply With Quote
Old July 31st, 2010, 01:59 AM   #58
Luke80
Registered User
 
Luke80's Avatar
 
Join Date: Jul 2009
Location: Surrey, UK
Posts: 779
Likes (Received): 0

Bit of a dump in all honesty...
Luke80 no está en línea   Reply With Quote
Old July 31st, 2010, 02:22 AM   #59
jucaro1970
Registered User
 
jucaro1970's Avatar
 
Join Date: Jul 2009
Location: Pereira
Posts: 525
Likes (Received): 0

Quote:
Originally Posted by Luke80 View Post
Bit of a dump in all honesty...
Well, not they all can like the same thing, but we do the better thing that we can...

Last edited by jucaro1970; July 31st, 2010 at 02:34 AM.
jucaro1970 no está en línea   Reply With Quote
Old August 1st, 2010, 10:07 AM   #60
Jim856796
The Q&A Guy
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 6,750
Likes (Received): 7

This stadium will not have real seating, just benches...
__________________
I honestly think all development projects must be dashing, sustainable, and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote


Reply

Tags
hernan ramirez villegas, hrv, pereira

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 06:04 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 23.08%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu