Arena da Copa em 30/06/2011 e projeção

Fotografias do que será a Arena da Copa, datadas de 30 de junho de 2011 (Crédito: Eduardo Martino/Divulgação)



Last edited by Timbu; July 28th, 2011 at 01:01 AM.
Timbu no está en línea   Reply With Quote

Sponsored Links
 
Old July 21st, 2011, 01:40 PM   #62
mestresplynter
Registered User
 
mestresplynter's Avatar
 
Join Date: Dec 2009
Location: Dois Irmãos
Posts: 1,365
Likes (Received): 236

omg, this stadium is far from everything
mestresplynter no está en línea   Reply With Quote
Old August 2nd, 2011, 03:52 AM   #63
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

Date 30/07/2011


Google Tradutor


Quote:
Originally Posted by D.A View Post


Foto: Marcelo Soares/DP/D.A Pres
Parallel to the construction of the foundations of the stands, it is possible to see the miran the gap of the east wing, designed for the underground parking garage of the arena.

Quote:
Originally Posted by D.A View Post

Foto: Marcelo Soares/DP/D.A Pres
A stack of papers in the sea of ​​bureaucratic financial structure of a modern football stadium and a ground covered by vegetation, with an air of rural and inhabited by nearly two hundred settlers, formed basically, the scenario for the Pernambuco World Cup 2014 until July 30 last year. At that time, the Official Gazette of Pernambuco an environmental permit issued for the implementation of the construction site in São Lourenço da Mata. The action, now with the state government under pressure from tight schedule of FIFA, was the green light to start up the engines of the dozens of machines that would change the 52 acre complex site for the World Cup, with the arena, parking and press center . Following actions after that document came the removal of trees, exploding rocks, earthworks and foundations.

Today, the construction of the Arena Pernambuco complete one year, reaching 13% of all the schedule outlined by the consortium. It is accompanied by a growth month by month for the series "Diary of an Arena." The trend, according to engineers at Odebrecht, behind the work, that number is enough to accelerate from now, since the delivery is up to December next year - the same since the beginning of activities.

"Soon, people are able to see well from the road," says Poggi Jayro, the engineer responsible for the work. Taking stock of these first twelve months is, in fact, visible changes provided by the work of large, already employs 865 people in three shifts per day. Scheduled to end in September, the foundation of the stadium, the main current stage, has already reached 35% of the scheduled execution. Among root cuttings, shoes and blocks, the total support units of future stands (for 46 000 fans) comes to 1943.

According to Poggi, the end of terraplenagm streamlined the entire process of the stadium, where we grow the beams of east and west sides - the south wing has been completed. "The evolution of the work is remarkable in a year. In August last year, we had little more than 15 workers with the initial mobilization of the bed. Today, more than 850 and this should effectively reach 2,100 people who work at the peak of construction, "he says. The bases of the stadium has also left the show Tereno the gap in the east wing of the future platform. Purposeful, it is said. There he built a part of the underground parking. In all, 1,600 parking spaces will be underground, for a total of six thousand.

Quote:
Originally Posted by D.A View Post

Marcelo Soares/DP/D.A Press


Foto: Marcelo Soares/DP/D.A Pres
During this first year of activities efetvas, the stadium also got an official name after a few suggestions and even an official emblem of the FIFA under seal, in order to promote it worldwide. Lack also a setting for the future with the club. The three top teams from Recife has not signed a contract with the consortium. The negotiations, however, quietly follow. It is expected that this definition comes close to the inauguration of the stadium's most modern state within a year and a half.


Credit: http://translate.google.com.br/trans...mes_0711.shtml



Link http://www.copa2014.gov.br/index.php...arenas/recife/


Crédito: SÉRGIO AMARAL/ASCOM-ME


Crédito: SÉRGIO AMARAL/ASCOM-ME

Last edited by Timbu; August 2nd, 2011 at 04:05 AM.
Timbu no está en línea   Reply With Quote
Old August 2nd, 2011, 04:24 PM   #64
Lucas_Wild
Registered User
 
Lucas_Wild's Avatar
 
Join Date: Jan 2009
Location: Recife
Posts: 5,112
Likes (Received): 173

The stadium in Recife is one of the most beautiful in Brazil
__________________
RECIFE
UMA METRÓPOLE ALÉM
DO QUE AS OUTRAS PODEM SER!
Lucas_Wild no está en línea   Reply With Quote
Old August 20th, 2011, 01:13 AM   #65
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

Under Construction


Quote:
Originally Posted by Timbu View Post
Crédito da Foto: CARUARUENSE
Quote:
Originally Posted by Timbu View Post
Quote:
Originally Posted by D.A View Post

Quote:
Originally Posted by Timbu View Post
Agosto 2011




Crédito: Eduardo Martino
Quote:
Originally Posted by D.A View Post

Google Tradutor


Official Information



Arena Pernambuco

The state of Pernambuco is preparing for the 2014 World Cup building a new multipurpose arena that will seat 46 000, distributed in the stands, boxes and special chairs. The structure of the stadium will be adapted to receive various events such as concerts, conventions and other sports competitions. The site will have 4,700 parking spaces, 4,500 of which are designed to light vehicles and 200 buses.

The bill, signed by the architect Daniel Fernandes, is a Public Private Partnership (PPP) between the Government and the Consortium of Pernambuco Pernambuco Arena (Odebrecht Odebrecht Investments and Holdings and Infrastructure, who formed a Special Purpose Company for the construction, maintenance and operation the arena). The concession period is 33 years, including the period of works.

The Consortium hired AEG Arena Pernambuco, the world's leading sports and entertainment events. The U.S. company that promotes events for year 3500 42 million people worldwide, will be responsible for the management and operation. In addition to creating and developing sports franchises, concerts, festivals and concerts, AEG operates or provides advice in more than 100 facilities for these types of events.

Arena Pernambuco is the starting point for the City Cup, a new urban center in São Lourenço da Mata, bringing together residential areas, offices, educational and entertainment creating an alternative to urban sprawl in the Metropolitan Region of Recife.

Will be preserved 600 thousand square meters of native Atlantic Forest in the region, and adopted technologies that ensure the rational use of natural resources such as booking and use of rain water, water reuse, solar energy and other solutions that use light and ventilation natural


Location
São Lourenço da Mata (PE) - Metropolitan Region of Recife

Model Contract
Public-Private Partnership

Value
U$ 299,75 million in May 2009 on the contract for engineering and construction.

Start of work
October 2010.

Current Status
The excavation area of ​​the stadium was completed and performed 35% of the foundations. Currently, the foundations are in progress in the sector east and west of the arena and the stage of concrete structure. Was started in the southern sector, the concrete slab floor and the first pillars began to be settled.

Jobs created
2100, during the peak of the work. In August 2011, is 906.

Concession period
33 years, including the construction period.

Business members
Consortium Arena Pernambuco (Odebrecht Odebrecht Investimentos e Participações and Infrastructure).

São Lourenço da Mata

AEG

Government of Penambuco

Credit: http://translate.google.com.br/trans...ena-pernambuco

Last edited by Timbu; August 20th, 2011 at 01:36 AM.
Timbu no está en línea   Reply With Quote
Old August 20th, 2011, 01:29 AM   #66
ryebreadraz
Registered User
 
Join Date: Sep 2008
Location: Los Angeles
Posts: 1,586
Likes (Received): 1

I'm still unclear as to why there is such a big gap between the pitch and the stands.
ryebreadraz no está en línea   Reply With Quote
Old August 20th, 2011, 01:44 AM   #67
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

Quote:
Originally Posted by ryebreadraz View Post
I'm still unclear as to why there is such a big gap between the pitch and the stands.
Current Project > http://bit.ly/imSu8K


Quote:
Originally Posted by Timbu View Post
D.A

















Last edited by Timbu; August 24th, 2011 at 02:53 AM.
Timbu no está en línea   Reply With Quote
Old August 23rd, 2011, 01:00 AM   #68
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

Works in the winter

Quote:
Originally Posted by Timbu View Post








Crédito: TCU
Timbu no está en línea   Reply With Quote
Old October 6th, 2011, 04:03 AM   #69
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

Google Trdutor


August 2011

The advancement in the foundations is increasingly visible, with the growth of concrete piles. Presence of the crane would rob the scene at the construction site.

In the rhythm of the giant crane
The arrival of a giant crane, with more than 70 meters tall, symbolizing a new stage in the works of Pernambuco Arena in São Lourenço da Mata, as the new chapter in the series Diary of an Arena. The Link Belt, of U.S. manufacture, is capable of lifting 200 tons and is already being used to launch forms of concrete and steel. By the end of construction in December of next year, other models will get to bed. The news indicates an acceleration in the planning, parallel to the final stretch of the foundations of the stadium, already 48% completed on schedule.

"As you move up in the structure, we will need new equipment for a vertical movement. Even without the stands, the work is already showing large gaps in some parts, so we are counting on the equipment, "explains Jayro Poggi, the engineer responsible for the work. In the west wing of the future stadium, the unevenness of the terrain is as high as six meters. Initially, the belt will be the first link in the east wing. As this is a major equipment, the idea is that the cranes will change location to a minimum. Therefore, the need for more cranes. The Consortium Arena Pernambuco rented equipment within the state.

So how should occur in Fonte Nova, a even larger crane, with driving force to lift up to 400 tons, may be required by the engineering department of Odebrecht, which has been building the stadium Pernambuco since July 2010. Besides the role played today, the huge machine, which can still be seen on the banks of the terrain, the BR-408, will be used in two other ways: in the assembly of the stands, with slabs of concrete pre-cast in the two rings, and also the metal frame coverage, as the last stage before the finish.

However, these two steps can be performed jointly to advance the foundation in other sectors of the stadium - after the south wing, the workers now work in the west and east wings.

"We have a great parallel. The condition of the foundation work is worse, because the action of rain. Conclusion that, everything goes. The tendency is to climb the structure throughout the year 2012. We have executed several pillars, "he added Jayro, which updated the number of employees in the construction of the stadium site for the 2014 World Cup. They are 975 people, divided into two shifts. One of them, only to link belt with special training, including safety course.

Parking only after

In August, the direction of the Consortium Arena Pernambuco had the definite plan of the City Cup, whose advancement will be divided into four phases (2014, 2015/2019, 2020/2914 and 2025). Around the arena drew attention to the presence of three units of the parking garage, something previously lacking. At first it seemed a change in the stadium complex. However, the Odebrecht's engineering department said the project presented (and approved) by FIFA follows the same, with six thousand parking spaces on a single floor, uncovered.

As the original plan of the parking is in the west wing, the BR-408, away from other units in the City Cup as shopping mall, convention center and indoor arena, you need a new parking lot, closer, filling the same number of positions - about two thousand. Thus, the parking garage just released on the east side, should only be built starting in 2014, after the World Cup.

With the clarification, the progress of works will not suffer any amendment to the World Cup. "The FIFA project remains the same, but we're already thinking about the medium term and will have to transfer the parking lot. We understand that it would be difficult to share the future with the mall. We will not change much now because the earthworks are ready. The cost will be the entrepreneur (consortium), but only the second time, "said Poggi Jayro.

Stop motion

Odebrecht issued an official video about the evolution of the arena, with a compilation of photographs from the same point, called "time-lapse". The news was released exclusively in the series Diary of an arena in June when the camera was installed.


September 2011

More a large crane with capacity of 200 tons, is being used to build the arena, which advances on the foundations of the east and west wings of the grandstand. In all, 75% of the foundations have been completed, and 10% of the phase structure. The good weather in the last month has accelerated the process, which will work from 7 am to 2:48 a.m. in the morning, in two shifts.

Quote:
Originally Posted by D.A View Post


Foto: Ricardo Fernandes/DP/D.A Press


Foto: Fred Jordao/Odebrecht


Ricardo Fernandes/DP/D.A Press


Foto: Ricardo Fernandes /DP/D.A Press


Foto: Ricardo Fernandes /DP/D.A Press

http://www.diariodepernambuco.com.br...mes_0911.shtml
Quote:
Originally Posted by D.A View Post
Inspection silent

There were about 20 minutes under a white tent, 50 meters from the heart of the work. Between Brazilians and foreigners, 35 people linked to FIFA, in an official inspection Arena Pernambuco, in the midst of moving tractors and cranes, leading steel and concrete foundations for the stadium. Comments, questions, notes and silence. The staff of the entity that runs the football, formed by engineers and architects, reviewed the project design Pernambuco for the 2014 World Cup, the first major survey of the construction site in São Lourenço da Mata.

Technicians, 20 and 15 of the FIFA Local Organising Committee (LOC) Cup, arrived at 9:40 a.m. on 27 September in the ground by the BR-408. It was the fourth visit by the country in this round, which began a week ago in Belo Horizonte. With scouts from the Military Police and traffic changes, the bus with the group not to get some experienced congestion in the arena. There, as with safety helmets, they were accompanied by Bruno Golden, director of Odebrecht Infrastructure contract, and company engineers, and Gilberto Pimentel, executive secretary of institutional relations Secopa.

Before, they had had a conversation with Daniel Fernandes, an architect who has developed all the modeling of the future stadium to 46 000 people. Data on access of fans, the evacuation time for public visibility and courage were on the agenda. Spot, the impressions of a work with 17% of actions taken. The FIFA delegation left Pernambuco with the assurance that the work will move to 30% in December. "The more complicated phase is over with earth moving (already completed in the stadium area). Let's enjoy the arrival of summer and to make further progress with the work, "Bruno said Golden.

With 1,324 workers divided into two shifts, the construction of the main module of the City Cup will be included in the month of October in the Confederations Cup in 2013. Therefore be zealous local authorities over the visit of the technical - previously, only FIFA had inspected the state training centers and the type of grass to the arena, both last year.

This size will be held until June 2014, that the "model" of excellence in the World Cup does not undergo any erasure in his image. "If necessary, we can enhance the effective and also study an increase in night shift, in addition to expanding the amount of equipment. The first and second rounds of the work are already integrated so that the work has not discontinued, "Golden added, with the discourse in favor of the project's inclusion in the World Cup tournament-test within two years. Vale a visibilidade internacional, propalada por Pernambuco. It's international visibility, touted by Pernambuco. And there will be an exposure beyond 35 people.

Credit: http://translate.google.com.br/trans...mes_0811.shtml




Link http://www.youtube.com/watch?v=q0TfC...layer_embedded

Last edited by Timbu; October 6th, 2011 at 04:26 AM.
Timbu no está en línea   Reply With Quote
Old October 25th, 2011, 04:11 AM   #70
D.A
Registered User
 
D.A's Avatar
 
Join Date: Oct 2009
Posts: 8,357
Likes (Received): 1528

videos



D.A no está en línea   Reply With Quote
Old October 27th, 2011, 01:12 AM   #71
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

http://www.odebrechtnacopa.com.br/cidadedacopa



The First Smart City in Latin America.
Technology changing the way we live.

As an entirely planned city, Cidade da Copa will be conceived using high technology.

The project favors security and environmental sustainability.
A balance between urban development and preservation of natural resources.

Security
A command and control center will be able to provide real time images and information for immediate action when necessary.

Mobility
Incentives for using public and alternative transport. Dedicated pedestrian and cycle paths. Digital signage to warn of diversions and closed roads.

Environmental Conservation
600 acres, over half designated for parks, green and open spaces, also conserving the native vegetation


MULTIPURPOSE STADIUM
The main reason behind Pernambuco’s new chapter in history, the multipurpose stadium will be the stage for one of the largest sporting events in the world, the 2014 FIFA World Cup Brazil™. Hosting delegations and fans from the five continents, this space will be designed based on the smart stadium concept and will offer more security, comfort and full service variety.
This is just the beginning of what will be one of the most modern multipurpose stadiums in world.

The stadium’s structure will be adapted to host various events such as concerts, conventions and other sporting competitions. Arena Pernambuco has hired AEG Facilities, the world leader in sporting and entertainment events. The American company

that promotes 3,500 events every year for 42 million people around the world will be responsible for the arena’s operations

Last edited by Timbu; October 27th, 2011 at 01:28 AM.
Timbu no está en línea   Reply With Quote
Old October 28th, 2011, 12:35 AM   #72
D.A
Registered User
 
D.A's Avatar
 
Join Date: Oct 2009
Posts: 8,357
Likes (Received): 1528

Update October 2011
D.A no está en línea   Reply With Quote
Old November 11th, 2011, 12:14 AM   #73
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

November 2011

Quote:
Originally Posted by D.A View Post
Timbu no está en línea   Reply With Quote
Old November 17th, 2011, 05:34 AM   #74
lampião
BANNED
 
Join Date: Nov 2011
Posts: 1
Likes (Received): 0

muito boa as imagens!!!
adorei as postagens!
lampião no está en línea   Reply With Quote
Old November 26th, 2011, 01:01 AM   #75
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

New images

Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by Sir Costa View Post

Quote:
Originally Posted by D.A View Post


Last edited by Timbu; November 26th, 2011 at 01:25 AM.
Timbu no está en línea   Reply With Quote
Old December 11th, 2011, 01:20 AM   #76
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

more...

Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by D.A View Post


Timbu no está en línea   Reply With Quote
Old December 23rd, 2011, 06:08 PM   #77
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

more...

Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by jmascena View Post
Timbu no está en línea   Reply With Quote
Old December 24th, 2011, 04:57 PM   #78
SWN2011
Registered User
 
SWN2011's Avatar
 
Join Date: Jul 2011
Location: Sao Paulo, Brasil
Posts: 339
Likes (Received): 60

the works are highly delayed. It's probable that this stadium won't be in a CC 2013.
SWN2011 no está en línea   Reply With Quote
Old January 14th, 2012, 02:06 AM   #79
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

more

Quote:
Originally Posted by Wesley Sport View Post
[/COLOR][/B]
Quote:
Originally Posted by Wesley Sport View Post





Quote:
Originally Posted by D.A View Post
Quote:
Originally Posted by Timbu View Post
Quote:
Originally Posted by D.A View Post

Mirante da Arena
Foto: Annaclarice Almeida/DP/D.A Press


Arquibancada
Foto: Annaclarice Almeida/DP/D.A Press



Arquibancada 2
Foto: Annaclarice Almeida/DP/D.A Press


Foto: Annaclarice Almeida/DP/D.A Press
Timbu no está en línea   Reply With Quote
Old January 21st, 2012, 03:15 AM   #80
Timbu
Vida que Segue
 
Timbu's Avatar
 
Join Date: Jan 2008
Location: Recife
Posts: 4,704
Likes (Received): 748

Video

Quote:
Originally Posted by D.A View Post
Timbu no está en línea   Reply With Quote


Reply

Tags
recife

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 02:30 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu