Old September 11th, 2012, 09:31 PM   #3481
Kanto
Roof height crusader
 
Kanto's Avatar
 
Join Date: Apr 2011
Location: S-4, Papoose Lake
Posts: 5,925
Likes (Received): 3546

Quote:
Originally Posted by marcatio View Post
After 6 hours since commencing the pouring, the final slab section has been completed. Finishing operations with power trowels, and placing control joints will complete the slab.

The foundation is now substantially complete.

Looking back in time when demolition, excavation, forming perimeter walls, placing footings and slabs, the foundation construction was done in relatively fast time. After inspection, the completed foundation can be handed over to the next contractor.
How many contractors does a supertall usually have?
__________________
The Outbreak: A free browser online strategy game. Build up your town and compete with other towns economicaly and militarily.
http://www.the-outbreak.com/
Kanto no está en línea   Reply With Quote

Sponsored Links
Old September 11th, 2012, 09:37 PM   #3482
thejacko5
SSC Addict
 
Join Date: Nov 2010
Location: NYC
Posts: 932
Likes (Received): 401

thats kind of a difficult question if you read it back to yourself......

i would just consider the things that need to get done and the things you can group into operations

superstructure concrete, superstructure steel, reinforcing steel, carpenters, steamfitters, electricians, plumbers, glazers, painters, ornamental trades.
thejacko5 no está en línea   Reply With Quote
Old September 11th, 2012, 09:47 PM   #3483
tim1807
faster than buildings
 
tim1807's Avatar
 
Join Date: May 2011
Location: Den Helder
Posts: 10,325
Likes (Received): 5334

The new concrete next to the gate is already dry and strong enough to walk on.
tim1807 no está en línea   Reply With Quote
Old September 11th, 2012, 10:59 PM   #3484
marcatio
Registered User
 
marcatio's Avatar
 
Join Date: Jul 2012
Posts: 265
Likes (Received): 341

Most likely, in fact it is, a design/build project in order to speed up the work. Even before the design is finalized, construction begins, instead of the usual design, bid, then build. Another name for the design/build is fast tracking. It would have a construction manager, who advises the owner (Macklowe/CIM) with methods for efficient constructibilty of the building. As far as contractors, there would be a slew of them: demolition, excavating/foundation, plumbing, mechanical, electrical, superstructure, fire protection, security, etc,etc, etc., as a previous poster mentioned.
marcatio no está en línea   Reply With Quote
Old September 12th, 2012, 05:26 AM   #3485
yankee fan for life
Registered User
 
yankee fan for life's Avatar
 
Join Date: May 2011
Location: Brooklyn new york
Posts: 832
Likes (Received): 195

Build it a little bit taller and beat the sears!
__________________
My heart beats for Brooklyn new york
yankee fan for life no está en línea   Reply With Quote
Old September 12th, 2012, 09:53 AM   #3486
kingsdl76
Registered User
 
Join Date: Sep 2007
Posts: 227
Likes (Received): 43

Love it!

I realize there's mixed feelings regarding the design of this building but personally I'm really looking forward to seeing it rise.
Like it or not this building will be the most dramatic change to the NY skyline since the completion of the original Twin Towers in the early 70s.
At the time of its completion it'll have the tallest roof of any skyscraper ever build in NYC!...exciting times!

I'm looking forward to it!.. great things happening in New York!
kingsdl76 no está en línea   Reply With Quote
Old September 12th, 2012, 01:34 PM   #3487
Rich-E36
Registered User
 
Join Date: Aug 2012
Posts: 148
Likes (Received): 5

Quote:
Originally Posted by Kanto View Post
How many contractors does a supertall usually have?
Not sure about over in the states but in the UK we usually have the client employee one main contractor who oversees all the works who then employes sub-contractors to do all the seperate tasks.
Rich-E36 no está en línea   Reply With Quote
Old September 12th, 2012, 01:43 PM   #3488
RobertWalpole
BANNED
 
Join Date: Mar 2010
Posts: 4,607
Likes (Received): 2508

Quote:
Originally Posted by kingsdl76 View Post
I realize there's mixed feelings regarding the design of this building but personally I'm really looking forward to seeing it rise.
Like it or not this building will be the most dramatic change to the NY skyline since the completion of the original Twin Towers in the early 70s.
At the time of its completion it'll have the tallest roof of any skyscraper ever build in NYC!...exciting times!

I'm looking forward to it!.. great things happening in New York!

It will be the tallest only for a short time. 225 W 57th is likely to surpass it.
RobertWalpole no está en línea   Reply With Quote
Old September 12th, 2012, 01:51 PM   #3489
Rich-E36
Registered User
 
Join Date: Aug 2012
Posts: 148
Likes (Received): 5

The site clear up seems to have started this morning with the triple boom loading remaining materials onto a flat bed truck.
Rich-E36 no está en línea   Reply With Quote
Old September 12th, 2012, 02:04 PM   #3490
Gherkin
actual gherkin
 
Gherkin's Avatar
 
Join Date: May 2005
Location: London
Posts: 13,796
Likes (Received): 515

Quote:
Originally Posted by Kanto View Post
How many contractors does a supertall usually have?
There's usually a groundworks contractor and an 'above ground' contractor; but in large projects like this it's likely the same contractor can do both.
Gherkin no está en línea   Reply With Quote
Old September 12th, 2012, 05:00 PM   #3491
600West218
Registered User
 
Join Date: Aug 2010
Posts: 2,734
Likes (Received): 1574

Interesting, they may be taking out even the stairs. I guess the new contractor will have to be lifted in by crane :-)
600West218 no está en línea   Reply With Quote
Old September 12th, 2012, 05:38 PM   #3492
Rich-E36
Registered User
 
Join Date: Aug 2012
Posts: 148
Likes (Received): 5

Quote:
Originally Posted by 600West218 View Post
Interesting, they may be taking out even the stairs. I guess the new contractor will have to be lifted in by crane :-)
What you seen? i cant seem to see any work on the stairs.
Rich-E36 no está en línea   Reply With Quote
Old September 12th, 2012, 05:51 PM   #3493
600West218
Registered User
 
Join Date: Aug 2010
Posts: 2,734
Likes (Received): 1574

Quote:
Originally Posted by Rich-E36 View Post
What you seen? i cant seem to see any work on the stairs.
There were some stairs on the 56th street side straight up to the trailer/office. They seem to be gone now.
600West218 no está en línea   Reply With Quote
Old September 12th, 2012, 06:33 PM   #3494
Rich-E36
Registered User
 
Join Date: Aug 2012
Posts: 148
Likes (Received): 5

Quote:
Originally Posted by 600West218 View Post
There were some stairs on the 56th street side straight up to the trailer/office. They seem to be gone now.
I think they are still there, however there is not a lot left really to be removed.
Rich-E36 no está en línea   Reply With Quote
Old September 12th, 2012, 08:49 PM   #3495
600West218
Registered User
 
Join Date: Aug 2010
Posts: 2,734
Likes (Received): 1574

Amazing what a clean site it is. I think the excavator is there just to get the blue moving platform out when it is done with whatever it needs to do.

Someone before brought up that the next phase might need to wait for a 28 day curing time. But I think all the main concrete pours, certainly the towers of concrete with rebar sticking out, were almos all poured more than 28 days ago. The last two to three weeks have just been digging out the ramp and doing the last concrete slab.

So if they wanted to I would think they could be in there continueing work within a week.
600West218 no está en línea   Reply With Quote
Old September 12th, 2012, 08:54 PM   #3496
Kanto
Roof height crusader
 
Kanto's Avatar
 
Join Date: Apr 2011
Location: S-4, Papoose Lake
Posts: 5,925
Likes (Received): 3546

I hope you're right. I can't wait to see them constructing the first underground floors on the cam
__________________
The Outbreak: A free browser online strategy game. Build up your town and compete with other towns economicaly and militarily.
http://www.the-outbreak.com/
Kanto no está en línea   Reply With Quote
Old September 12th, 2012, 09:17 PM   #3497
325ccr
Registered User
 
325ccr's Avatar
 
Join Date: Jul 2010
Location: Staten Island
Posts: 359
Likes (Received): 82

Quote:
Originally Posted by 600West218 View Post
There were some stairs on the 56th street side straight up to the trailer/office. They seem to be gone now.
Plastic barriers loaded on a flatbed leaving as well
325ccr no está en línea   Reply With Quote
Old September 13th, 2012, 01:40 AM   #3498
Rich-E36
Registered User
 
Join Date: Aug 2012
Posts: 148
Likes (Received): 5

Just the cherrypicker remaining now then the triple boom can be removed. The 28 day rules really just for standard concrete, this site will probably have hardeners added to the mix to give strength fast. The cherrypicker has been driven on the new slab today and that will weigh about 6ton so about a 1.5ton point load per wheel. Fingers crossed a super structure contractor will start site set up on Monday but only time will tell.
Rich-E36 no está en línea   Reply With Quote
Old September 13th, 2012, 01:41 AM   #3499
nycfann1
Registered User
 
nycfann1's Avatar
 
Join Date: Mar 2012
Posts: 89
Likes (Received): 3

Where exactly is the building going to rise?? The site is way to big for the slim rectangular structure of the tower. What will the rest of the space be used for. Retail?
nycfann1 no está en línea   Reply With Quote
Old September 13th, 2012, 02:35 AM   #3500
NYBOY1975
BANNED
 
Join Date: Dec 2011
Location: NEW YORK
Posts: 319
Likes (Received): 95

Will be watching this baby rising from a distance where I am thats for sure, will get pics and vids just you wait!!!

My Youtube Channel: http://www.youtube.com/user/QUEENSNY121?feature=mhee
NYBOY1975 no está en línea   Reply With Quote


Reply

Tags
new york city, new york project, park avenue, supertall

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 03:28 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu