Old October 24th, 2012, 07:07 AM   #4181
325ccr
Registered User
 
325ccr's Avatar
 
Join Date: Jul 2010
Location: Staten Island
Posts: 359
Likes (Received): 82

I have a feeling it will be in that opening along 57th, seems like the other crane would hit into it if it was in the building. Plus when they were pouring today the guys had to push the bucket back and forth and let the concrete pour out when it was past where the crane's radius.

bigreach, thanks for the compliments on the photos!
325ccr no está en línea   Reply With Quote

Sponsored Links
Old October 24th, 2012, 01:19 PM   #4182
Kycon
Registered User
 
Kycon's Avatar
 
Join Date: May 2010
Location: Melbourne
Posts: 327
Likes (Received): 32

These guys work too early, it's only 6 in the morning and I already see guys with flash lights on site.
Kycon no está en línea   Reply With Quote
Old October 24th, 2012, 03:18 PM   #4183
thejacko5
SSC Addict
 
Join Date: Nov 2010
Location: NYC
Posts: 932
Likes (Received): 401

Quote:
Originally Posted by 325ccr View Post
Someone from Lomma told me, the concrete contractor (I believe Rogers and sons) bought it from them for the job. I'm not sure where it be but I would imagine along 57th street
MR295?
thejacko5 no está en línea   Reply With Quote
Old October 24th, 2012, 03:32 PM   #4184
Ed007Toronto
Registered User
 
Join Date: May 2003
Location: Toronto
Posts: 834
Likes (Received): 71

Quote:
What about in the core?
Cranes are not usually placed in the core.
__________________
Check out UrbanToronto
http://urbantoronto.ca/
http://skyrisecities.com/


MyMiniCity
http://ed007ville.myminicity.com/ind
Ed007Toronto no está en línea   Reply With Quote
Old October 24th, 2012, 05:54 PM   #4185
600West218
Registered User
 
Join Date: Aug 2010
Posts: 2,734
Likes (Received): 1574

Wow, I thought I'd see concrete drying today but they already have all the decking and forms for the next floor placed over it!! They are flying!!
600West218 no está en línea   Reply With Quote
Old October 24th, 2012, 06:15 PM   #4186
Carpenter157
local 157 nyc
 
Carpenter157's Avatar
 
Join Date: Jul 2010
Location: nyc
Posts: 33
Likes (Received): 0

Quote:
Originally Posted by Kycon
These guys work too early, it's only 6 in the morning and I already see guys with flash lights on site.
Most likely the engineers laying out, axis lines, column & walls lines. . Some people are going to making a lot of money on that job.
Carpenter157 no está en línea   Reply With Quote
Old October 24th, 2012, 07:23 PM   #4187
jconyc
Registered User
 
Join Date: Feb 2012
Posts: 416
Likes (Received): 168

Quote:
Originally Posted by 325ccr View Post
Someone from Lomma told me, the concrete contractor (I believe Rogers and sons) bought it from them for the job. I'm not sure where it be but I would imagine along 57th street
This would make sense...we discussed this some time ago..speculating that another crane would go in the hole on 57 st side
jconyc no está en línea   Reply With Quote
Old October 24th, 2012, 08:08 PM   #4188
325ccr
Registered User
 
325ccr's Avatar
 
Join Date: Jul 2010
Location: Staten Island
Posts: 359
Likes (Received): 82

Quote:
Originally Posted by thejacko5 View Post
MR295?
I'm not to sure, probably around that size. I'm pretty sure it's only to lift the bar up there
325ccr no está en línea   Reply With Quote
Old October 24th, 2012, 10:47 PM   #4189
-Corey-
Je suis tout ā vous
 
-Corey-'s Avatar
 
Join Date: Jul 2005
Location: Seattle
Posts: 16,218
Likes (Received): 5222

wow they're going really fast!
__________________

๏̯͡๏๏̯͡๏
-Corey- no está en línea   Reply With Quote
Old October 24th, 2012, 11:17 PM   #4190
jconyc
Registered User
 
Join Date: Feb 2012
Posts: 416
Likes (Received): 168

Yeah...and they are working late tonight...carpenters and crane are still going strong at 4:15
jconyc no está en línea   Reply With Quote
Old October 25th, 2012, 12:03 AM   #4191
bigreach
GF 117 #1, Lotte Tower #2
 
bigreach's Avatar
 
Join Date: Jul 2012
Posts: 1,370
Likes (Received): 739

Daylight saving time will be here in ten days hopefully they have light their whole shift 6-3:30
__________________
Rooftops over Spires/Antennas/
Rooftops, someplace where you can look over the edge, can't do that climbing a needle.
bigreach no está en línea   Reply With Quote
Old October 25th, 2012, 12:52 AM   #4192
tim1807
faster than buildings
 
tim1807's Avatar
 
Join Date: May 2011
Location: Den Helder
Posts: 10,325
Likes (Received): 5334

A lot of visible progress today:
This morning around 11:45.
[IMG]http://i49.************/6roozq.png[/IMG]
Now:
[IMG]http://i46.************/9ulv1i.png[/IMG]
Will the second crane stand in the red square?
tim1807 no está en línea   Reply With Quote
Old October 25th, 2012, 01:12 AM   #4193
600West218
Registered User
 
Join Date: Aug 2010
Posts: 2,734
Likes (Received): 1574

I don't get the need for a second crane. One57 doesn't have one and doesn't this have smaller floors?

Also, I don't see any evidence they are set up to recieve materials on 57th Street although they could do that easily enough.

Definitely flying on this. Good to see them make up for the rain delay last week :-)
600West218 no está en línea   Reply With Quote
Old October 25th, 2012, 02:07 AM   #4194
thejacko5
SSC Addict
 
Join Date: Nov 2010
Location: NYC
Posts: 932
Likes (Received): 401

Quote:
Originally Posted by 600West218 View Post
I don't get the need for a second crane. One57 doesn't have one and doesn't this have smaller floors?

Also, I don't see any evidence they are set up to recieve materials on 57th Street although they could do that easily enough.

Definitely flying on this. Good to see them make up for the rain delay last week :-)
the footprint is pretty large.

also, there is a very large and very heavy truss that goes in the retail and podium area. I figure that is why they went with a 760 favco. i cant find a reason for that beast in concrete construction
thejacko5 no está en línea   Reply With Quote
Old October 25th, 2012, 03:48 AM   #4195
RobertWalpole
BANNED
 
Join Date: Mar 2010
Posts: 4,607
Likes (Received): 2508

The Tower's footprint is tiny and will fit in between the townhouses to the east and west.

[IMG]http://i46.************/9ulv1i.png[/IMG]
RobertWalpole no está en línea   Reply With Quote
Old October 25th, 2012, 09:42 AM   #4196
patrykus
Registered User
 
patrykus's Avatar
 
Join Date: May 2008
Location: Poland
Posts: 3,778
Likes (Received): 1794

Quote:
Originally Posted by 600West218 View Post
I don't get the need for a second crane. One57 doesn't have one and doesn't this have smaller floors?

Also, I don't see any evidence they are set up to recieve materials on 57th Street although they could do that easily enough.

Definitely flying on this. Good to see them make up for the rain delay last week :-)
If there won't be concrete pump installed I would be surprised if there wasn't second crane here. But since 157 have just one crane and no concrete pump I guess we can expect everything in this city.
__________________
PolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/C
PolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/C
PolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/CPolishTowersU/C
PolishTowersU/CPolishTowersU/CComingSoon/CPolishTowersU/CPolishTowersU/CPolishTowersU/C

patrykus no está en línea   Reply With Quote
Old October 25th, 2012, 03:37 PM   #4197
-Corey-
Je suis tout ā vous
 
-Corey-'s Avatar
 
Join Date: Jul 2005
Location: Seattle
Posts: 16,218
Likes (Received): 5222

Quote:
Originally Posted by RobertWalpole View Post
The Tower's footprint is tiny and will fit in between the townhouses to the east and west.

[IMG]http://i46.************/9ulv1i.png[/IMG]
That red square is the footprint?
__________________

๏̯͡๏๏̯͡๏
-Corey- no está en línea   Reply With Quote
Old October 25th, 2012, 04:05 PM   #4198
MrSlippery519
Registered User
 
Join Date: Mar 2012
Posts: 179
Likes (Received): 36

Quote:
Originally Posted by -Corey- View Post
That red square is the footprint?
No that is where people think there might be a second smaller crane. The thing is unlike the main crane that location was not prepared the same when the foundation was poured so I am not exactly sure how it will work or if it might just be a small temporary crane to help with the retail section before the main tower starts to rise.

Also looks like a concrete pumping vehicle arrived a few minutes ago
MrSlippery519 no está en línea   Reply With Quote
Old October 25th, 2012, 04:12 PM   #4199
topota6009
Registered User
 
Join Date: Nov 2008
Posts: 63
Likes (Received): 6



The owner of the penthouse is a lucky man indeed.
topota6009 no está en línea   Reply With Quote
Old October 25th, 2012, 04:23 PM   #4200
jconyc
Registered User
 
Join Date: Feb 2012
Posts: 416
Likes (Received): 168

They are setting up to pour the slab on 56 street side today...concrete pump is now in place

With regard to the second crane...it may be only to build the 57 st retail building (6 floors)...it may be that the tower will rise faster and would limit access to the far side? Just a guess.

Looks like they are actually pouring tower perimeter columns on 56 st side

site is really swarming with workers today

Last edited by jconyc; October 25th, 2012 at 05:08 PM.
jconyc no está en línea   Reply With Quote


Reply

Tags
new york city, new york project, park avenue, supertall

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:26 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu