Old September 12th, 2010, 12:12 AM   #1
Jim856796
The Q&A Guy
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 7,560
Likes (Received): 186

PORTO ALEGRE - Estádio José Pinheiro Borda / Beira Rio (51,000) - 2014 FIFA WC


SC Internacional

3x League:
1975, 1976, 1979

1x Cup:
1992

2x Copa Libertadores:
2006, 2010

1x Copa Sudamericana:
2008

2x Recopa Sudamericana:
2006, 2010

1x FIFA Club World Cup:
2006


Estádio José Pinheiro Borda (Estadio Beira Rio)
Established April 6, 1969


__________________
I honestly think all development projects must be dashing, sustainable, and futureproof.

You support the good projects... and oppose the bad.

sursena, Highcliff, geometarkv liked this post

Last edited by www.sercan.de; May 2nd, 2014 at 01:49 PM.
Jim856796 no está en línea   Reply With Quote

Sponsored Links
 
Old September 12th, 2010, 12:54 AM   #2
igor_carlos
GASPARETOUR.COM
 
igor_carlos's Avatar
 
Join Date: Jul 2009
Location: Dublin( ) Cuiaba(X) Nagoya( )
Posts: 8,259
Likes (Received): 670

After remodulation The Beira Rio stadium will be similar to Porth Elisabeth Stadium (roof)
By the way Internacional Porto Alegre was the Libertadores da America Champion last month so it will be Inter Milan and Inter Porto Alegre plus others teams in FIFA Club World Cup UAE 2010.
igor_carlos no está en línea   Reply With Quote
Old September 12th, 2010, 11:08 PM   #3
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Current capacity: 56k
2014 WC Capacity:60k

How it is today:

image hosted on flickr


How it's going to be for the 2014 WC:





http://www.skyscrapercity.com/showthread.php?t=845338

















__________________

Highcliff, Erlenberg, geometarkv liked this post

Last edited by rafamlopes; September 13th, 2010 at 02:23 AM.
rafamlopes no está en línea   Reply With Quote
Old September 12th, 2010, 11:24 PM   #4
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Some pictures of the upgrade:

The new interior facade:

image hosted on flickr


The tests of the new 1st tier:





Foundation of the new roof:













__________________

Highcliff liked this post

Last edited by rafamlopes; September 14th, 2010 at 06:55 AM.
rafamlopes no está en línea   Reply With Quote
Old September 13th, 2010, 12:23 AM   #5
www.sercan.de
Galatasaray SK
 
www.sercan.de's Avatar
 
Join Date: Aug 2003
Location: Istanbul
Posts: 27,081
Likes (Received): 1913

http://img229.imageshack.us/img229/2...rarioinsid.jpg
Hw many suites will it have?
__________________
International titles of Galatasaray SK
UEFA Europa League (1): 2000
UEFA Super Cup (1): 2000

FIBA EuroLeague Women (1): 2014
FIBA EuroCup Women (1): 2009

IWBF Champions Cup (5): 2008, 2009, 2011, 2013, 2014
IWBF Intercontinental Cup (4): 2008, 2009, 2011, 2012
www.sercan.de no está en línea   Reply With Quote
Old September 13th, 2010, 02:21 AM   #6
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Quote:
Originally Posted by www.sercan.de View Post
Between the first and the second tier will be 51 suites, and a 360o connecting corridor. The media center will be located in the "new third tier", where there are probably going to be built another suites. Other than the suites, there will also be constructed 1.000 VIP seats and another 480 Gold seats.

The existing ones:















Project of the new Suites:













__________________

Highcliff liked this post
rafamlopes no está en línea   Reply With Quote
Old September 13th, 2010, 10:54 AM   #7
www.sercan.de
Galatasaray SK
 
www.sercan.de's Avatar
 
Join Date: Aug 2003
Location: Istanbul
Posts: 27,081
Likes (Received): 1913

So we have to learn how many suites there will be at the 3rd tier
__________________
International titles of Galatasaray SK
UEFA Europa League (1): 2000
UEFA Super Cup (1): 2000

FIBA EuroLeague Women (1): 2014
FIBA EuroCup Women (1): 2009

IWBF Champions Cup (5): 2008, 2009, 2011, 2013, 2014
IWBF Intercontinental Cup (4): 2008, 2009, 2011, 2012
www.sercan.de no está en línea   Reply With Quote
Old September 13th, 2010, 02:48 PM   #8
acvodark
Registered User
 
acvodark's Avatar
 
Join Date: Sep 2009
Location: Aracaju
Posts: 320
Likes (Received): 91

Congratulations SC Internacional - RS
__________________
Programador Delphi - Firebird
Cobol - Net Express
Eles vieram com uma Bíblia e sua religião - roubaram nossa terra, esmagaram nosso espírito… e agora nos dizem que devemos ser agradecidos ao ‘Senhor’ por sermos salvos.
(Chefe Pontiac, Chefe Indígena Americano Sobre Missonários Evangélicos.)
acvodark no está en línea   Reply With Quote
Old September 13th, 2010, 05:46 PM   #9
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Quote:
Originally Posted by www.sercan.de View Post
So we have to learn how many suites there will be at the 3rd tier
Exactly. The final number is probably between 80 and 100 suites.
rafamlopes no está en línea   Reply With Quote
Old September 13th, 2010, 07:19 PM   #10
Juanes777
juanes777
 
Juanes777's Avatar
 
Join Date: Mar 2010
Location: Liberia
Posts: 938
Likes (Received): 55

where going to play the international during the remodelation? and when this provided to be finish?
Juanes777 no está en línea   Reply With Quote
Old September 14th, 2010, 05:10 AM   #11
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Quote:
Originally Posted by Juanes777 View Post
where going to play the international during the remodelation? and when this provided to be finish?
The remodelation will be done by sections. This way, the stadium will still be used by Internacional. The idea is to do the same way they're doing it in Stuttgart.

It will be finished by december/2012.
rafamlopes no está en línea   Reply With Quote
Old September 14th, 2010, 06:32 AM   #12
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

doube post

Last edited by rafamlopes; September 16th, 2010 at 06:06 AM.
rafamlopes no está en línea   Reply With Quote
Old September 16th, 2010, 06:06 AM   #13
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Quote:
Originally Posted by juscostajr View Post
You must watch it until the end. It shows exactly how it is probably going to be.

Last edited by rafamlopes; September 16th, 2010 at 06:35 PM.
rafamlopes no está en línea   Reply With Quote
Old September 18th, 2010, 11:23 PM   #14
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

The works in the Beira-Rio stadium, aiming at the World Cup 2014, do not stop. On the afternoon of Friday, an important stage of the work of covering the Giant was performed: the concreting of the piles that will support for its pillars. The President of the International Vitorio Piffero, alongside other leaders, was circulated to the complex to check on the status and progress of reforms.

A little more than 40 days of formalizing the start of work, which was attended by the President of Brazil, Luiz Inacio Lula da Silva, colorado fans can now see near the steps of the project 'Giant Forever', which will transform Colorado home of one of the most beautiful stadiums in the country.

rafamlopes no está en línea   Reply With Quote
Old September 19th, 2010, 04:57 AM   #15
Jim856796
The Q&A Guy
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 7,560
Likes (Received): 186

The Beira Rio's lower tier should be modified, the current tier will be dismantled and a new tier will be closer to the field.
__________________
I honestly think all development projects must be dashing, sustainable, and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote
Old September 19th, 2010, 11:42 AM   #16
Capital78
Registered User
 
Capital78's Avatar
 
Join Date: Jan 2008
Location: Celje, Ljubljana/Slovenia
Posts: 895
Likes (Received): 2

I love it. This is a great reconstructing plan indeed!
Capital78 no está en línea   Reply With Quote
Old September 19th, 2010, 07:11 PM   #17
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Quote:
Originally Posted by Jim856796 View Post
The Beira Rio's lower tier should be modified, the current tier will be dismantled and a new tier will be closer to the field.
The new lower tier will be 11 meters closer to the pitch and 4 meters higher than the old one.
The red drawing is the current tier:



Tests:


Last edited by rafamlopes; September 19th, 2010 at 07:16 PM.
rafamlopes no está en línea   Reply With Quote
Old December 22nd, 2010, 04:01 AM   #18
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Machines begin demolition of the grandstands to the Beira-Rio
Works will be divided into four stages: the first is in early stage


Any fan who joins the Colorado Beira-Rio stadium will feel probably victimized by a visual shock. The machinery and the workers responsible for the works to modernize the home of Inter accelerate the pace of destruction in the lower ring.

The process, also destined for the World Cup 2014, has four steps. The stadium was divided into sectors in equal parts, and modernization of society and in the stands will meet each stage. Divided the Riverside in four, there will be demolition and construction separately for the three remaining sectors continue receiving public.

The works in each quadrant should last six months. Thus, the Beira-Rio will have reduced capacity during the next two seasons, if not maintained the intention to interdict the stadium. In the end, no change in angulation of the bleachers, which will also be closer to the lawn.

Outside the machines did not cease work. Are posted on the foundation that will support the new roof of the Beira-rio Stadium.

rafamlopes no está en línea   Reply With Quote
Old December 22nd, 2010, 04:36 PM   #19
SVN2007
BANNED
 
Join Date: Jul 2007
Location: Itasca, IL
Posts: 363
Likes (Received): 1

very good that the work started effectively at Beira Rio. I have read that the roof will be ready still in the first semester 2011.. Is this true ?
SVN2007 no está en línea   Reply With Quote
Old December 22nd, 2010, 05:24 PM   #20
rafamlopes
BANNED
 
rafamlopes's Avatar
 
Join Date: Dec 2008
Posts: 1,950
Likes (Received): 7

Quote:
Originally Posted by SVN2007 View Post
very good that the work started effectively at Beira Rio. I have read that the roof will be ready still in the first semester 2011.. Is this true ?
Probably just some sectors will be ready in the first half of 2011!

The works on the foundation are going very fast but they still need to remove the existing roof to start de instalation of the new one.
rafamlopes no está en línea   Reply With Quote


Reply

Tags
porto alegre

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 06:54 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu