daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > World Development News Forums > General Urban Developments

General Urban Developments Discussions of projects shorter than 100m/300ft. Also, please post all other threads not specified in other Development News subforums here.



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old October 10th, 2010, 11:17 PM   #1
Jakob
Registered User
 
Jakob's Avatar
 
Join Date: Feb 2004
Location: Beijing
Posts: 16,032
Likes (Received): 9065

ANKARA | MiA Central Business Area Urban Transformation | Prep

MiA Central Business Area Urban Transformation
Ankara, Turkey

http://www.miacitycenter.com/



About the Project

CENTRAL BUSINESS AREA PROJECT is a project to create a contemporary City Center with a new understanding. This project is done in conjunction with an Urban Renewal Project in Ankara and Metropolitan Municipality's support. The location of the project is at Scythian Industrial Zone.

The master-plan has 2 km long and 35 m wide boulevard with a vast square at its mid-point. The boulevard acts like a spine where all the minor streets connect. The boulevard will serve as a new pedestrian zone where the people of Ankara could once more breathe and socialize. The boulevard will contribute the urban life.

The Project aims to extend the subway and other public transportation routes through the boulevard and will approximately have 27 600 parking lots.

The new district will form a large-scale mix used development with malls, stores, showrooms, street shops, bookstores, hotels, restaurants, cafes, hospitals and office buildings.

A commercially attractive district will be created by hiring an international leasing consultant firm which will be charge of bringing the most widely-known brands into the project.

A line of high-rise building office blocks with publicly accessible restaurants and street shops on ground level are ranged either side of the boulevard and will work until midnight so that the social activity on the site will remain until late hours.



Goals of the Project

The urban development project of MIA ISKITLER aims to reconstruct a contemporary city centre in Ankara on an existing small scale industrial area.

* To reconstruct the identity of the city center towards the future.
* To realize an aesthetic, active and a new contemporary city center.
* A new urban space (64 hectares) for upgrading cultural and social interaction in Ankara.
* Improving the vision of public space perception.
* Promoting the quality of urban land.
* Designing a new city order focused on a 2 km length access spine.
* Proposing a new life-centre.
* Housing modern city functions in a physical structure.
* Working as a team with developers, land owners and the local authorities.



Project Size

The urban development project of MIA ISKITLER aims to reconstruct a contemporary city centre in Ankara on an existing small scale industrial area.

* CBD Urban Renewal Project occupies a total area of approximately 90 acres. That is tosay, approximately 64 acres of the CBD 1 project area and the above-mentioned Central Business Areas. The remaining is approximately 26-acres creating section of the CBD 2 Project Area known as the Housing Department.
* CBD 1 that is Central Business District Project, will produce 33 individual parcels and these parcels on approximately 1.8 million m2 of gross building area on a total 314 000 m2 property field. This area will be formed as about 900,000 m2 section Leasable Area, 680 000 m2 Parking garage part, the remaining area of approximately 220,000 m2, the interior streets, Atriums, Common Areas, Service and Obligatory premises.
* CBD 1 is planned as a total of 81 388 m² land property at primarily stage, 39 618 m² area of Mall, 24 348 m² and 8079 m² the industrial market, and area of 9343 m² five-star hotel.
* It is estimated to provide employment opportunity to 15.000 people directly or indirectly and the region’s population to reach 170.000 people when CBD 1 is a project implemented.
* Regarding the economic conditions and developments in World and may change, investment costs including VAT and excluding land, is foreseen to be completed in 8-10 year period reaching to a total of approximately $ 810,000,000.



Basic Features of the Project

The main features of a New City Center are summarized below as follows:

* Creating aesthetic, contemporary and functional urban texture,
* Earning the City Center a new silhouette as a result of Ankara’s highest building and other high-level buildings with an architectural aesthetic harmony and integration,
* Creating a new City Centre axle where people can walk and breathe comfortably by forming a circular main boulevard centering approximately 12 acres that host a new town square with a width of 35mt. and 2 km length,
* Creating an area of city trade By an extensive transportation project, consisting of easily available metro and all public-transport vehicles and inside and outside parcels will be designed for about 27 600 pieces of indoor and outdoor parking with a capacity of individual means of transport for the parking problem,
* Creating a real magnet by forming a mixed-use concept that includes all the basic necessities that people may need such as
o Shopping Centre
o Sectoral Market
o Construction Market
o Specific Sectoral Show Rooms
o High-level office and residence buildings
o Show and Entertainment Centre
o Hotel and Hospital Buildings

within the parcels of Main Avenue and City Square,
* Increasing the attraction of City Center by working with an internationally experienced Property Rental Company in order to create a strong, sustainable and flexible retailing axis, and to provide a world-renowned brands take part in Ankara and Turkey for the first time ,
* Creating a way of continuously clean, well maintained, comfortable and safe life by working with an internationally experienced Property Management Company, where all municipality services for 24 hours a day, security and health services are provided,
* Creating a city texture that is vibrant and alive until 24.00 at boulevard side, the food-dominant (themed restaurants, fast food, cafes, bakeries, etc.) Stores and with 1+1 and 1+2 suit-type multi-level residences,
* Thanks to the main four boulevards (İstanbul Road, Karabekir Boulevard, Etlik Street and Turgut Ozal Boulevard), that Project area surrounds, which is the new City Centre the spine of the 35 mt. wide new boulevards, Placing a system of light rail tramway realizing short distance transportation, only the center of the human density that transits, who will make the surrounding arteries used, letting the traffic in slow pace,
* Briefly to sum up, for Central Business Areas (Central Business Areas), just like in Potsdamer Platz-Berlin, LE DEFENSE-Paris and Oxford Street-London as the world samples, gaining our country this type of project in Turkey as the first initiative.



[IMG]http://i53.************/2czxdvd.jpg[/IMG]

[IMG]http://i54.************/2mzxy61.jpg[/IMG]

[IMG]http://i53.************/286v90x.jpg[/IMG]

[IMG]http://i53.************/35l96wm.jpg[/IMG]

[IMG]http://i55.************/i24pzc.jpg[/IMG]

[IMG]http://i55.************/2uf82ua.jpg[/IMG]

[IMG]http://i51.************/indgly.jpg[/IMG]

[IMG]http://i56.************/2r1zcza.jpg[/IMG]

[IMG]http://i56.************/9qfas9.jpg[/IMG]

[IMG]http://i55.************/2pypzko.jpg[/IMG]

[IMG]http://i51.************/2nc1jtc.jpg[/IMG]

[IMG]http://i55.************/tahqtj.jpg[/IMG]

[IMG]http://i51.************/145m6r.jpg[/IMG]

[IMG]http://i51.************/f4in4h.jpg[/IMG]
Jakob no está en línea   Reply With Quote

Sponsored Links
Old October 11th, 2010, 11:29 AM   #2
miro111
Registered User
 
miro111's Avatar
 
Join Date: Jan 2010
Posts: 361
Likes (Received): 3

http://www.skyscrapercity.com/showthread.php?t=1059121
miro111 no está en línea   Reply With Quote
Old October 11th, 2010, 11:30 AM   #3
miro111
Registered User
 
miro111's Avatar
 
Join Date: Jan 2010
Posts: 361
Likes (Received): 3

similar project
miro111 no está en línea   Reply With Quote
Old October 12th, 2010, 10:02 PM   #4
Jakob
Registered User
 
Jakob's Avatar
 
Join Date: Feb 2004
Location: Beijing
Posts: 16,032
Likes (Received): 9065

The current situation:

[IMG]http://i54.************/wv7gye.jpg[/IMG]
Jakob no está en línea   Reply With Quote
Old May 16th, 2011, 11:34 AM   #5
Jakob
Registered User
 
Jakob's Avatar
 
Join Date: Feb 2004
Location: Beijing
Posts: 16,032
Likes (Received): 9065

After the approval, the construction of this project will start already in 2011 and will host a 40 storey tower.


Quote:
Ankara Merkezi İş Alanları Projesi hayata geçiyor!
http://www.emlakkulisi.com/ankara_me...or_-75403.html


Ankara Büyükşehir Belediyesi Haber Merkezi’nden yapılan açıklamaya göre,
kentsel dönüşüm projeleri kapsamında İskitler’de boşaltılan oto sanayi sitelerinin bulunduğu bölgeye yapılması planlanan MİA Projesi için çalışmalar
devam ediyor. Beş etap olarak planlanan proje alanının ilk etabı içinde kalan
binaların yıkım işlemleri başladı.

Açıklamada, Ankara Büyükşehir Belediye Başkan Vekili Ali Gökşin’in proje
alanı hakkında yaptığı bilgilendirmeye de yer verildi.

Buna göre, Gökşin, ilk etapta yaklaşık 100 bin metrekare arazi üzerinde
yer alan 5 binanın yıkımının sürdüğünü belirterek, bu yıl içinde inşaat
çalışmalarına başlanacağını ifade etti.

Yeni plana göre yolların hemen açılacağını aktaran Gökşin, Başkent’in 40
katlı "en büyük" binasının da İskitler’de yapılacağını söyledi.

İlk etapta ayrıca 40 bin metrekarelik "modern" bir Alışveriş Merkezi,
24 bin metrekarelik alan üzerinde sektör çarşıları, etap ana yolunun tam
ortasında 12 bin metrekarelik yeşil alanı da bulunan büyük bir meydan ve
tiyatrodan sinemaya kadar pek çok yapının bir arada olacağını belirten Gökşin,
etap için 200 milyon dolar tutarında bir yatırım yapılacağı vuruguladı.

Projenin, ATO meslek komitelerinden farklı sektörlere yönelik kurdukları
9 kooperatifin gelir ortaklığı modeli ile hayata geçirileceğine işaret eden
Gökşin, arsalarını kooperatife devreden mülk sahiplerinin, arsaların büyüklüğüne
göre kazanılan gelirden pay elde edeceğini açıkladı.

-"ULAŞIM TRAMVAYLA SAĞLANACAK"-

İki aşamadan oluşacak MİA’nın ilk etap çalışmalarının Büyük Sanayi
Tesviyeciler Caddesi’nde yürütüleceğini kaydeden Gökşin, "İş ve alışveriş
merkezleri, sinema ve tiyatro salonları, sokak üstü dükkanları ile geniş bir
meydanı bulunacak MİA 1’de toplu ulaşım raylı sistemle, tramvayla sağlanacak.
Hemen ardından başlayacak olan MİA 2 ise daha çok konutlar ve rezidanslardan
oluşacak" şeklinde konuştu.
Jakob no está en línea   Reply With Quote
Old January 23rd, 2013, 06:49 PM   #6
Jakob
Registered User
 
Jakob's Avatar
 
Join Date: Feb 2004
Location: Beijing
Posts: 16,032
Likes (Received): 9065

Preparation works have started:

[IMG]http://i47.************/o8doyg.jpg[/IMG]
Jakob no está en línea   Reply With Quote
Old February 24th, 2013, 04:22 PM   #7
Jakob
Registered User
 
Jakob's Avatar
 
Join Date: Feb 2004
Location: Beijing
Posts: 16,032
Likes (Received): 9065


http://i1292.photobucket.com/albums/...ps05a4a56a.jpg


http://i1292.photobucket.com/albums/...ps7831a7b3.jpg
Jakob no está en línea   Reply With Quote
Old April 16th, 2013, 08:46 PM   #8
Jakob
Registered User
 
Jakob's Avatar
 
Join Date: Feb 2004
Location: Beijing
Posts: 16,032
Likes (Received): 9065

Pictures taken by AbuDhabiBoy:

[IMG]http://oi47.************/5d5w07.jpg[/IMG]

[IMG]http://oi46.************/2lwammr.jpg[/IMG]
Jakob no está en línea   Reply With Quote
Old November 3rd, 2013, 02:42 AM   #9
Skywalker1994
Registered User
 
Join Date: Sep 2012
Location: Frankfurt/Samsun
Posts: 232
Likes (Received): 120

Böyle "hızla" devam giderse 2023'de anca biter ama ona bile sevinirim Yeter ki yapılsın...
__________________

doguorsi liked this post
Skywalker1994 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 02:14 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu