daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > World Forums > Stadiums and Sport Arenas > Under Construction



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old November 7th, 2010, 11:32 PM   #1
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636

ALGIERS - Douera Sportpark Stadium (40,000)

Location
Douera, Algiers province, Algeria

Capacity
40,000

Delivery date
2012-2013











http://www.cfk.it/
__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote

Sponsored Links
 
Old November 7th, 2010, 11:35 PM   #2
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636

Nouveau stade de douéra
Un complexe de grande dimension pour septembre 2012

http://www.liberte-algerie.com/edit....tembre%202012&

Quote:
Situé dans la localité d’Ouled Mendil, sur le tronçon reliant Douéra à Birtouta par la deuxième rocade d’Alger, le chantier du grand stade de Douéra a débuté concrètement au mois d’avril dernier.

La représentativité des clubs algérois dans le sport national a fait que la capitale obtient la part du lion en matière d’infrastructures sportives, que les pouvoirs publics sont décidés à mettre en place dans la perspective de hisser haut le niveau du sport algérien en général et celui de la balle ronde du pays en particulier.

À Alger, deux projets de grande envergure ont été lancés pour la réalisation de deux stades olympiques d’une capacité de 40 000 places, répondant aux normes internationales et dotés de toutes les commodités. Outre Baraki, la commune de Douéra a été choisie pour accueillir la deuxième mégapole olympique de la capitale qui fera sans nul doute office de délivrance pour les clubs algérois tout comme les différentes équipes nationales. Situé dans la localité d’Ouled Mendil, sur le tronçon reliant Douéra à Birtouta par la deuxième rocade d’Alger, le chantier du grand stade de Douéra a débuté concrètement au mois d’avril dernier.

Le projet devait démarrer, nous dit-on, en début de l’année dernière. Toutefois, un problème administratif ayant trait à l’assiette du terrain qui n’a pas été dégagée à temps a retardé l’ouverture du chantier jusqu’au 30 avril de cette année.

Si pour la majorité des projets similaires à travers le pays, le choix des pouvoirs publics a été porté sur des partenaires chinois pour des paramètres financiers et d’expérience, on n’a surtout pas dérogé à la règle pour le futur stade de Douéra. En effet, les travaux ont été confiés à l’entreprise chinoise Zhejiang Construction Investment Group Corporation (ZCIGC), pour une enveloppe financière de l’ordre de 11,969 milliards de dinars, et pour un délai de réalisation de 29 mois. Sa livraison est prévue fin 2012.

Mais avec le retard consommé pour le début du projet, on peut s’attendre, dès maintenant, à un retard de livraison, et la mise en service de ce complexe. “Normalement, nous serons dans les délais. Le complexe doit être livré en septembre 2012. Si retard il y a, ce sera une question de quelques mois seulement, pas plus. Tout a été mis en œuvre pour essayer d’être dans les délais et nous avons bon espoir d’être à temps. On est en train de faire le nécessaire pour cela”, a tenu à rassurer l’un des responsables du projet. Six mois depuis le lancement du projet, l’étape de terrassement est sur le point d’être achevée. “Dans peu de temps, on va procéder à la mise en place des fondations et des premières semelles sur lesquelles sera basé l’édifice”.
D’après les études faites, notamment la maquette proposée, le nouveau stade omnisports de Douéra disposera de plusieurs autres installations sportives modernes qui profiteront à des disciplines comme l’athlétisme et les sports-Co, à l’instar du handball, basket-ball et volley-ball. Quel que soit l’engouement qu’il suscite notamment en Algérie, le sport n’est pas uniquement le football.

Ainsi, en plus du stade principal lui-même, qui aura l’aptitude de contenir 40 000 places, avec des tribunes couvertes, trois terrains répliques seront construits autour de l’enceinte. Cette dernière sera dotée d’une piste olympique pour l’athlétisme. Il est prévu également la réalisation d’une salle
omnisports d’une grande capacité et à la pointe de la technologie, avec d’autres terrains qui seront consacrés aux sports-Co, et un grand parking de 5 000 places. Un espace de repos offrant toutes les commodités sera également réservé aux familles de façon à leur permettre de disposer d’un endroit adéquat pour s’adonner aux sports et loisirs.

Ce projet comme tant d’autres qui sont en cours de réalisation entrent dans le cadre d’une nouvelle politique des pouvoirs publics qui consiste à hisser le pays à sa véritable place au niveau international en matière de sport également.

Les responsables algériens visent un retour en force dans ce sens en mettant en œuvre d’importantes infrastructures capables d’accueillir les plus grands événements internationaux. C’est le principal objectif à travers le lancement de ces grands chantiers, à savoir notamment une organisation de la Coupe d’Afrique des nations qui manque à notre pays depuis son unique CAN accueillie sur son sol en 1990.

L’Algérie veut d’abord s’armer sur le plan infrastructurel pour encore quelques années avant de postuler pour l’organisation d’une Coupe d’Afrique des nations, la plus prestigieuse compétition du continent, à partir de 2017, apprend-on de sources proches de la première instance responsable du sport, le MJS. “Organiser une Coupe d’Afrique n’est pas un objectif dans l’immédiat. Notre priorité va pour la restructuration de notre sport et le football en particulier en le dotant de tous les moyens pour s’épanouir. Notre priorité est de réussir les différents grands projets sportifs qui sont en cours de réalisation. L’Algérie ne peut organiser une Coupe d’Afrique pour juste le plaisir de l’organiser. Quand on décide d’organiser un événement de cette envergure, on veut le réussir”, avait tenu à souligner le ministre de la Jeunesse et des Sports, Hachemi Djiar lorsqu’il a abordé le sujet de l’éventuelle organisation de la CAN en Algérie.
Translate

New stadium Douéra
A large complex for September 2012


Quote:
Located in the village of Ouled Mendil on the section linking to Douéra Birtouta by the second ring road of Algiers, the site of the great stage Douéra began to practice last April.

The Algerian representative clubs in the national sport has meant that the capital gets the lion's share in terms of sports facilities that the government is determined to put in place in preparation for the climb up the sport in general and Algeria that the ball round the country in particular.
In Algiers, two major projects were launched to achieve two Olympic stadiums with a capacity of 40,000 seats, according to international standards and equipped with all amenities. Baraki addition, the common Douéra was chosen to host the second Olympic megalopolis of the capital which will undoubtedly licensing agency for clubs like the Algerian national teams. Located in the village of Ouled Mendil on the section linking to Douéra Birtouta by the second ring road of Algiers, the site of the great stage Douéra began to practice last April.
The project was started, we are told, early last year. However, an administrative problem relating to the site of the land which was not released on time delayed the opening of the site until 30 April this year.
If the majority of similar projects across the country, the choice of government has been focused on Chinese partners for financial parameters and experience, it has certainly not departed from the rule for the future stage Douéra. Indeed, the work was entrusted to the Chinese company Zhejiang Construction Investment Group Corporation (ZCIGC) for a budget of about 11.969 billion dinars, and for a lead time of 29 months. Delivery is scheduled for late 2012.
But with the delay used for the project began, we can expect, now, to late delivery and commissioning of this complex. "Normally, we will be on time. The complex must be delivered in September 2012. If there is delay, it will be a matter of only months, not more. Everything has been done to try to be on time and we hope to be on time. We are doing what is necessary for this, "reassured one of the project. Six months since the project began, the stage of excavation is about to be completed. "Soon, we will proceed with the establishment of foundations and insoles which will be based on the building."
According to studies, including the model proposed, the new sports stadium for Douéra have many other modern sports facilities that will benefit disciplines such as athletics and team sports, like handball, basketball and volleyball. Whatever excitement it generates in Algeria, the sport is not just football.
Thus, in addition to the main stadium itself, which has the ability to contain 40,000 seats, with covered stands, three plots of replicas will be built around the enclosure. The latter will have an Olympic track for athletics. Provision is also conducting a room Omnisport a large capacity and advanced technology, with other lands to be dedicated sports-Co, and ample parking spaces for 5000. A rest area with all the amenities will also be reserved for families to enable them to have a suitable place to indulge in sports and recreation.

This project like many others that are underway are part of a new government policy which is to raise the country to its rightful place at the international level in sport as well.

Algerian officials seek a comeback in this direction by implementing major infrastructure capable of hosting the biggest international events. This is the main objective through the introduction of these major projects, namely including an organization of the African Cup of Nations which is lacking in our country since its only CAN hosted on its soil in 1990.

Algeria to first arm themselves on terms of infrastructure for a few more years before applying for the organization of an African Nations Cup, the continent's most prestigious competition, in 2017, we learn sources close to the first body responsible for sport, JS. "Organizing an African Cup is not an immediate objective. Our priority is to restructure our sport and football in particular by providing it with all means to flourish. Our priority is to get the various major sports projects that are underway. Algeria can not organize an Africa Cup for just the pleasure of organizing it. When we decided to organize an event of this magnitude, we want to succeed, "had underlined the Minister of Youth and Sports, Hachemi Djiar when he broached the subject of the possible organization of the CAN in Algeria .
__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old November 10th, 2010, 10:57 PM   #3
Fenerbahce Sk
Registered User
 
Fenerbahce Sk's Avatar
 
Join Date: Oct 2010
Posts: 693
Likes (Received): 21

Have you started construction ?
Fenerbahce Sk no está en línea   Reply With Quote
Old November 11th, 2010, 11:09 AM   #4
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636

Quote:
Originally Posted by Fenerbahce Sk View Post
Have you started construction ?
Yes. Since April 2010. Pictures coming soon...
__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old November 22nd, 2010, 07:42 PM   #5
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636

By aghiles11







__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old November 23rd, 2010, 01:44 PM   #6
Axelferis
Registered User
 
Axelferis's Avatar
 
Join Date: Jan 2008
Location: A space between two worlds
Posts: 9,195
Likes (Received): 886

Two olympic stadium? Where is the other?
__________________
W.A.O blog
Axelferis no está en línea   Reply With Quote
Old November 23rd, 2010, 04:58 PM   #7
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636

Quote:
Originally Posted by Axelferis View Post
Two olympic stadium? Where is the other?
There is an error in the article. They talk about the Baraki Stadium which isn't an olympic stadium (no track).
__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old May 10th, 2011, 07:36 PM   #8
Krim
Versailles-el Harrach
 
Krim's Avatar
 
Join Date: Apr 2011
Posts: 947
Likes (Received): 111

il avance ou pas ce chantier?
qqun a des photos, voir des photos satellites? histoire de voir où ça en est
Krim no está en línea   Reply With Quote
Old June 29th, 2011, 09:49 PM   #9
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636













__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old June 29th, 2011, 09:49 PM   #10
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636








By Docri from SSC Algeria
__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old July 1st, 2011, 07:52 PM   #11
jmlagunebrio
Jesús Manuel
 
jmlagunebrio's Avatar
 
Join Date: Mar 2008
Location: Torreón - Chihuahua State
Posts: 3,559
Likes (Received): 45

Good project.
__________________
Torreón La Ciudad de los Grandes Esfuerzos
Pocos años...mucha historia
jmlagunebrio no está en línea   Reply With Quote
Old August 2nd, 2011, 05:16 PM   #12
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 17,653
Likes (Received): 3636

By rabiemed, SSC Algeria



__________________
"6,2 dollars produits en une heure de travail en Algérie contre 38 en Corée et 62 en Allemagne"
-INSEAD

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old August 6th, 2011, 04:36 PM   #13
cristi767
Registered User
 
Join Date: Aug 2008
Location: Oradea
Posts: 574
Likes (Received): 161

from the picture it looks bigger than 40.000 seats for me
__________________
Check some great buildings
cristi767 no está en línea   Reply With Quote
Old August 19th, 2011, 10:54 PM   #14
leadbelly
Registered User
 
leadbelly's Avatar
 
Join Date: Jun 2010
Location: Stratford-upon-avon
Posts: 131
Likes (Received): 1

Shame about the athletics track.
leadbelly no está en línea   Reply With Quote
Old August 20th, 2011, 01:49 AM   #15
Gadiri
Moderator
 
Gadiri's Avatar
 
Join Date: Oct 2009
Location: Paris-Agadir
Posts: 40,973
Likes (Received): 1602

Is this stadium dedicated to a club ?
__________________
A must to see : Arabs and Hollywood <<<< =======

A ne pas rater : Les arabes et Hollywood <<<< =======


No te pierdas : Los árabes y Hollywood <<<< =======

Gadiri está en línea ahora   Reply With Quote
Old August 20th, 2011, 11:02 PM   #16
Joya
Suphi's toy
 
Joya's Avatar
 
Join Date: Sep 2005
Location: Turkey
Posts: 9,600
Likes (Received): 482

Tracks ruin the venues, but athletes needs tracks, and Algeria is good in Athletism
__________________
Under the games, during the games...
Joya no está en línea   Reply With Quote
Old September 21st, 2012, 12:25 PM   #17
Sandervalya
Registered User
 
Join Date: Jul 2010
Posts: 2,328
Likes (Received): 564

Mai 2012

Le projet est à l'arret complet depuis plus d'un an d'après les photos

Sandervalya no está en línea   Reply With Quote
Old September 21st, 2012, 05:05 PM   #18
HBOY116
Registered User
 
HBOY116's Avatar
 
Join Date: Aug 2011
Posts: 1,497
Likes (Received): 417

Question nouveaux stade douera

rien a boujet dans ce chantier si vraiment grave
HBOY116 no está en línea   Reply With Quote
Old October 21st, 2013, 08:34 PM   #19
salimdz
Registered User
 
Join Date: Feb 2013
Posts: 587
Likes (Received): 113

زيارة وزيرالشباب والرياضة محمد تهمي لورشات انجاز ملعبي الدويرة و براقي

Visite du ministre de la Jeunesse et du Sport Mohamed Tahmi aux ateliers des stades de Douera et Baraki

salimdz no está en línea   Reply With Quote
Old June 5th, 2014, 06:30 PM   #20
alexandru.mircea
Ars longa, vita brevis
 
alexandru.mircea's Avatar
 
Join Date: May 2011
Posts: 5,135
Likes (Received): 3517

Any progress with this one?
alexandru.mircea no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 05:03 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu