Old August 12th, 2015, 04:11 AM   #9841
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

Fast foward to 15/07, working on the turnout at the throat of Dangtu(当涂) East station
Early moring at Dangtu East


No.18 turnout, permitted speed 80kph, the biggest turnout no.62 with permitted speed of 220kph was intalled on Harbin-Dalian HSR


Swing nose


Three motors moving the point rails


Five motors needed for the swing nose


Needless to say it's a huge job and an important job


voyager221 no está en línea   Reply With Quote

Sponsored Links
Old August 12th, 2015, 04:30 AM   #9842
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

Some kind of measuring tool


Apparently this is the method used on HSR, very different from the method used on conventional railways




Electric fastening tool


Took three days to finish one turnout
__________________

KAAAZ, Swede liked this post
voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 04:47 AM   #9843
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

19/07, working on the turnouts at Ma'anshan(马鞍山) East station with three other teams


A lot going on


Schedule's tight, different teams need to accommodate each other


Not for faint-hearted


Tamping machine joining in
__________________

KAAAZ liked this post
voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 04:51 AM   #9844
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

Some close look pictures of the tamping machine






__________________

FM 2258 liked this post
voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 05:04 AM   #9845
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

Ma'anshan East




Joint task force




Ballasted platform tracks


voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 05:28 AM   #9846
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

Fast forward to 28/07, still working on the turnouts at Ma'anshan East


Installing noise barriers


Next morning


Two more to do


Mid day, rail temperature
voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 05:54 AM   #9847
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

01/08, track doube-check, rail temperature first


History record, date, time, position, rail temperature before work and after work, name of the person in charge


Track geometry trolley


Track information, ZH k30+515.550: starting postion of the transition curve, R 5000: curve radius in metres, L 2489.399: curve length in metres, H 110: cant in millimeters, need help with the meaning of I 450 and F 10.0
__________________

AlexisMD liked this post
voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 06:06 AM   #9848
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

09/08 typhoon landed in Fujian province bring heavy rain to east of china, work continues




Inside the headquarter, a big board showing the working progress


voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 06:09 AM   #9849
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

12/08 beautiful day after typhoon, all the adjustment work to be done before 15/08




To be continued
__________________

foxmulder, FM 2258, PredyGr, KAAAZ, AlexisMD and 2 others liked this post
voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 07:49 AM   #9850
foxmulder
Registered User
 
foxmulder's Avatar
 
Join Date: Dec 2007
Posts: 2,135
Likes (Received): 381

EPIC update, thanks a ton!



foxmulder no está en línea   Reply With Quote
Old August 12th, 2015, 07:55 AM   #9851
binhminh01
Ghế phng họp
 
binhminh01's Avatar
 
Join Date: Jun 2015
Location: Ha Noi
Posts: 4
Likes (Received): 0

Great . so so so Awesome
__________________
Ghế phng họp v bn phng họp cao cấp l những nội thất phng họp
binhminh01 no está en línea   Reply With Quote
Old August 12th, 2015, 08:10 AM   #9852
hmmwv
Registered User
 
hmmwv's Avatar
 
Join Date: Jul 2006
Location: Seattle
Posts: 2,391
Likes (Received): 420

Kudos to people who do the hard work so we can travel safely and comfortably.
__________________
The building under construction next to Shanghai Tower is Oriental Financial Center. The "plot" next to Jinmao is reserved green belt and no skyscraper will be built there.
hmmwv no está en línea   Reply With Quote
Old August 12th, 2015, 09:14 AM   #9853
chornedsnorkack
Registered User
 
Join Date: Mar 2009
Posts: 4,975
Likes (Received): 388

Quote:
Originally Posted by voyager221 View Post

No.18 turnout, permitted speed 80kph, the biggest turnout no.62 with permitted speed of 220kph was intalled on Harbin-Dalian HSR
Is that the speed applicable to diverging track?
chornedsnorkack no está en línea   Reply With Quote
Old August 12th, 2015, 10:35 AM   #9854
voyager221
Registered User
 
Join Date: Mar 2015
Posts: 278
Likes (Received): 778

Quote:
Originally Posted by chornedsnorkack View Post
Is that the speed applicable to diverging track?
Yes. I suppose the straight track has the same designed speed as main line or sometime higher for future speed upgrade.
It seems all the turnouts used on this line have 250kph permitted speed on straight tracks.
On the other hand, the turnouts installed on Shenyang-Dandong PDL and Harbin-Qiqihar HSR(just changed name from PDL to HSR) have 350kph permitted speed on straight tracks.
voyager221 no está en línea   Reply With Quote
Old August 12th, 2015, 04:49 PM   #9855
FM 2258
Registered User
 
FM 2258's Avatar
 
Join Date: Jan 2004
Location: Austin
Posts: 5,438
Likes (Received): 612

I'm amazed at the skill of these workers to build the network so fast without mistakes. Who ever is the project manager(s) for this is doing a great job coordinating everything.
FM 2258 no está en línea   Reply With Quote
Old August 12th, 2015, 04:59 PM   #9856
gramercy
BANNED
 
Join Date: Dec 2008
Posts: 4,823
Likes (Received): 799

what is this "cushion" between the two layers of concrete?
__________________

mrsmartman, Zaz965 liked this post
gramercy no está en línea   Reply With Quote
Old August 12th, 2015, 05:31 PM   #9857
flankerjun
Registered User
 
Join Date: Oct 2013
Location: Shenyang/Wuhan
Posts: 461
Likes (Received): 1230

Quote:
Originally Posted by gramercy View Post
what is this "cushion" between the two layers of concrete?
a bag filled with asphalt and other material,it is a buffer unit.
__________________

FM 2258 liked this post
flankerjun no está en línea   Reply With Quote
Old August 12th, 2015, 06:40 PM   #9858
gramercy
BANNED
 
Join Date: Dec 2008
Posts: 4,823
Likes (Received): 799

so do the block move or they stay and its just shock absorption?
gramercy no está en línea   Reply With Quote
Old August 13th, 2015, 03:30 AM   #9859
ccdk
Registered User
 
ccdk's Avatar
 
Join Date: Dec 2014
Posts: 332
Likes (Received): 969

Jilin - Hunchun HSR commences trial operation
http://news.xwh.cn/2015/0813/340676.shtml#g340616=1

connecting the existing Changchun - Jilin HSR line. Travel time between Changchun, the capital city of Jilin province, and the border city of Hunchun is around 2.5 hours. Top speed is 250km/h. total length 360km with 9 stations.






































__________________

Zaz965 liked this post

Last edited by ccdk; August 13th, 2015 at 03:50 AM.
ccdk no está en línea   Reply With Quote
Old August 13th, 2015, 03:45 AM   #9860
flankerjun
Registered User
 
Join Date: Oct 2013
Location: Shenyang/Wuhan
Posts: 461
Likes (Received): 1230

Quote:
Originally Posted by gramercy View Post
so do the block move or they stay and its just shock absorption?
the block move just very Very slightly,you can understand they stay.and the bag absorb vibration.
__________________

gramercy, FM 2258 liked this post
flankerjun no está en línea   Reply With Quote


Reply

Tags
china, high speed rail

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 09:24 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium