[Sofia|София] Construction & Projects

There's a lot of construction going on in Bulgarian cities, especially in the capital Sofia and along the Black Sea coastline.

Here's a few from Sofia
If anyone has more, feel free to add them.

BUSINESS CENTER - AKTIV



Creative, efficient and environmentally designed workspace in a dynamic and ambitious development with the flexibility to adjust to individual needs.Business center “Aktiv” provides first class office space, which will allow companies to design their offices to meet their own particular needs. With its elegant facade in attractive colour scheme, the interior qualities are reflected externally providing a preferred address for Bulgarian and international companies.
Business center “Aktiv” is with carefully chosen location for maximum facility.The building provides fast access from main highway in-out of the town, Sofia International Airport and to the downtown of Sofia.
Business center “Aktiv” provides a full range of modern, high - tech services:
-Fibre Optics to access the Internet with ample capacity to support corporate LANs / WLANS of any level through Bulgarian Telecom.
-24 hours security, video monitoring and access control.
-Fully automated heating ventilation and air conditioning.
-A two - level underground parking lot with 96 parking places
-Conference rooms.
-Four elevators.
-Management service.

Business center “Aktiv” provides an office space from 300 sq.m up to 920 sq.m:
Floor 6 – 920,42 sq.m
Floor 7 - 920,42 sq.m
Floor 8 - 920,42 sq.m
Floor 9 - 915,49 sq.m

Base rent: - EUR 10 / sq.m, VAT exclusive ( includes cleaning of the common area, security and 4 parking places per each floor).
Parking lot: - EUR 50 / per month, VAT exclusive



Bokar Business Building




Building project: Business Building, part of the administrative and residential estate Bokar
Stage of Development: Approved architectural projects
Building site: Bulgaria Blvd.
Building contractor: Bokar
Design team: A.D.A. - chief architect Ivo Panteleev
Electrical installation: Pepito 69, manager Toni Radkov
Vertical planning: Bokar
Built-up area: about 280 sq. m
Office building
The building has 3 floors, each of them with an area of about 280 sq.m; ground floor- 3, 40 m high, first floor - 2,80 m high and second floor - 2,60 m high
Underground level (3,05m high) is suitable for warehouses.
The ground floor is suitable for restaurants, confectioneries, showrooms, and the other two floors are suitable for offices or hotel rooms.

There is possibility for underground car park with 20 parking places.
The building is situated in a key area in the complex. All projects concerning the construction of the building are approved but the construction has not started yet. This fact is an advantage to the future owners who may want to offer some changes.
-PVC paneling
-Polypropylene water supply systems
-Electric installation with electric plugs
-Thermally insulated construction
Completion date: up to 12 months


Multifunctional Building 10 - Business Park Sofia



Building project: Multifunctional Building 10 - Business Park Sofia
Location: Mladost district, Business Park Sofia
Investor: Business Park Sofia
Architect: architect Atanas Panov
Building contractor: Lindner Bulgaria
TBA: 13 600 sq.m
5 floors
8 637 m² of offices
1 712 m² of retail
722 m² of storage space
Lake 3 500 m²
Underground parking with 90 parking places
The Multifunctional Building 10 is to be situated near building 12 and the future building 11.
Basement: 2292 sq.m -service and installation premises, warehouses and underground parking with 36 parking places.
Groundfloor: 2464 sq.m - 10 commercial areas, a restaurant, and a snack bar, service and sanitary premises, and vertical approaches.
second, third and fourth floors: 2238 sq.m. There will be 8 office spaces equipped with restrooms and kitchenettes, and a circuit board.
Fifth floor: 2130 sq.m.-this floor is solved like the other three floors.
Completion date:the construction is to start in August 2004 and is expected to be completed till the end of 2003. At present the foundations of the building are being laid.



Office building and Showroom


Building project: Office Building and Showroom
Stage of development: forthcoming construction
Location: Sofia, Borisova Gradina -Pogrebite , Samokovsko chaussee Blvd.
Main characteristics:
Basement: 431.4 sq.m
Ground floor: 427.8 sq.m
First floor: 469.9 sq.m
Second floor: 469.9 sq.m
Third floor: 398.6 sq.m
TBA: 2197.6 sq.m
Project description: The building is situated in the northeastern part of the parcel along Samokovsko chaussеe Blvd.
The office building provides parking places and the necessary area for maneuvering and servicing of the building.
The showroom is located on the first floor with direct two-sided access: from Samokovsko chaussee Blvd. and from the patio. A room for conversation, sanitary premises and а kitchenette will be attached to the showroom. The other floors are accessible through a second entrance hall with a stairway and an elevator.
The basement consists of a stairway, a sanitary premise, an engine room for an elevator, a warehouse and an electric installation.
First, second and third floor: office areas, foyers with vertical connections-a stairway, an elevator and sanitary premises.
Finishing works are described in detail in the architectural drawings


Business Centre "Bellissimo"





A new business center will open doors in Sofia in 2005. The first sod of the new business centre Bellissimo, which will be erected along Bulgaria Blvd. was turned. The mayor Sofianski attended the event. Building contractor is Galchev Engineering Group. Architect Kalin Dikov - 'Elit Studio' EOOD, who is responsible for the development of the futuristic project for the new modern multifunctional complex, laid the foundation stone. The building of the business centre 'Bellissimo' is the first step of the programme of the investor 'Andromeda Real'- а joint-stock company set up with Italian funds. 'The company have long-term intentions to build high quality buildings in Bulgaria.' said Maria Sirakova, chairwoman of the board of directors.The new multifunctional complex will stretch on 17 decares and will be 50 metres high. It will consist of two main linked bodies of different heights, with 6 and 12 floors respectively.

A foyer is to be located in the zone between the two bodies. Their geometry provides plenty of illumination for the usable areas. The futuristic complex will have a built-up area of 16 123 sq.m. Terraces' area is 1450 sq.m. A shopping area will be situated in the ground floor of the building. There will be business apartments on the 9th and 10th floor, which are to be rented by companies whose offices are in the building. The top floors are designed for the needs of the investor - VIP apartments and offices. Suspended glass facades, which look like shields and canvases, are the main materials for the creation of the characteristic architectural silhouette. Business Centre Bellissimo to become one of the symbols of the capital is the ambition of the investors.


Central Bus Station, Sofia



Building Project: Central Bus Station - Sofia
Location: Danail Nikolaev Blvd.
Investor: joint venture -Central Bus Station and the Swiss joint-stock company ASP-assistance holding
Architect: team leader architect Atanas Panov
Central Bus Station-Sofia - 5-storeyed reinforced concrete structure;
basement, ground and 1-st floor - thicket offices;
2-nd, 3-rd and 4-th floor - offices of tourist companies;
44 bus parking places; adjacent shades.
Using NOE shutterng; TBA 7173 sq.m.
Project: The architectural conception of the new building is in conformity with the future functional purpose of the transport complex and with the existing architecture of the area. The two major volumes of the buildings of Central Railway Station and the vertical sections of Hotel Princess determine the architecture of the Bus station. The project includes the construction of a whole complex, which will meet the requirements of a modern bus station.

The main building, consisting of a basement floor, a ground floor and four floors will be situated in the eastern part of the parcel.
Basement area: 908,78 sq.m. - trade centers, first aid consulting room, installation premises.
Ground floor: 1141,24 sq.m.- 2 fast-food restaurants will provide passengers full service. An additional cafe will be situated in the gallery, which will be surrounded by the offices of 17 travel agencies.
1,2 and 4th floor:1141,24 sq.m.- administrative area
Top level: 548,85 sq.m. usable terrace
Parking places: total bus parking places: 45
21-arrival, 24-departure
Construction: monolithic building
Finishing works: suspended ceilings for the interior entrance halls, granitogress flooring, light mobile aluminum constructions for the trading area.



Filto- S Office Building




Building project: Office building
Location: on the corner of Trakia St. and Podporuchik Pachev St.
Investor: Filto-S
Building contractor: Filto-S
TBA: 400 sq.m.
Basement- built-up area 384sq.m with 8 parking cells
First floor- built-up area 340 sq.m.
Second floor- built-up area 494 sq.m
Third floor- built-up area 240 sq.m
Fourth floor - built-up area 240 sq.m
Fifth floor- built-up area 226 sq.m
The project provides architectural solution, which can be changed depending on the specific needs of the offices.
Installations:
Individual meters will be provided for every floor with consumption optimization capabilities for water, heat, and electricity.
Suspended facade and aluminum panelling - Metra system, Austria
Facade- masonry YTONG 30 cm, mineral plaster and stone facing.
Sanitary premises: Italian terracotta tiled floor and Ideal Standard faucets
Entrance hall and staircase: granite
Office flooring: massive parquet
Internal doors: MDF or aluminum
Internal walls- Latex paint
Framework
Monolithic building with concrete framework which provides opportunity for various interior solutions.
Completion Date: 20 December 2004



Bisness center Vitosha



Building project: Bisness center Vitosha
Investor: PM Grup
Building site: Bulgaria Blvd., Sofia
Building contractor: DP Stroitelstvo i Vazstanoviavane
Design team: Rok city engineering Ltd.
Architect: architect Nikolay Dimitrov, engineer Dimitar Petrov

Location: The new business center is situated in residential district Motopista, Bulgaria Blvd. in Sofia. The total area of the parcel is 1933 sq. m. The building has built-up area of 667 sq. m. and the unfolded built-up area is 8064 sq. m.
Project solution: In an architectural aspect the building develops in three main volumes -a prism determining the ground and the first floor, a truncated pyramid over the prism and a cylinder with an elliptical base which marks the height of the building. 1. Basement: car park and rooms for the technical maintenance of the building.
2. Ground floor: an entrance hall, access for disabled people is provided
3. First floor: it is connected with the ground floor through a spiral staircase and it will function as an entrance hall of Raiffeisen bank.
4.Office area:first floor to eleventh floor-all of them are organized in almost the same manner.There is possibility for eventual reorganization depending on the future owners' desires.
5.A conference room and a confectionary will be situated on the top floor, which has a wonderful panoramic view.
Building Structure:monolythic reinforced concrete structure , providing possibilities for flexible planning of the separate floors.The foundations which are laid under the whole base of the building guarantee its safety.
Facade: building contractor of the western facade is Uiventa 3,and of the eastern facade-Radop


Business center and Petrol Station



Building project: Business center and Petrol Station
Location: Tzarigradsko chaussee Blvd., Sofia
Investor: Avi Set Ltd., Gastrade
Designers and Architects: Stoiconsult 999 Ltd., architect Iuri Angelov, engineer Rosen Nikolov
Building contractor: DP Building and Reconstruction
Project: The new business center, which is situated on Tzarigradsko chaussee Blvd. and is adjacent to petrol station Shell, is the first joint investment of Avi Set and Gastrade. The building will consist of 2 bodies. The first one is to be built by the end of this year. At present the building and the finishing works are in process of completion.
Basement floor will be used as a car par.
First floor: restaurant of the chain of restaurants Happy
Second and third floor: administrative functions, offices of Gastrade
Fourth floor: office area for the administration of Avi Set
Project conception: The architectural conception drawn up by Stroiconsult 999 is in conformity with the important location of the building and with the requirements for modern functionality and comfort. The building constructive axis, which is 7,20, provides opportunity for flexible planning of the separate floors. The project conception is open which will allow the independent existence of the first body without conveying the impression of incompleteness of the building.
After the construction of the second body, the space between the two bodies will be set as an entrance hall. The project idea emphasizes on this space by the usage of suitable architectural devices - visible glass elements in the corners of the two bodies. The rounded angles of the building are parts of its characteristic silhouette.
Facade: consists of two parts. The first one is а thermo insulated facade with structural plaster -CAPAROL. The second part is a combination between aluminum windows and suspended glass facade. Panelling - Astral. What is interesting about the building is that in front of the solid parts will be put glass blinds. Behind them there will be suitable illumination, which will contribute to the airy character of the building.
In order to provide full service for the future customers, a Gastrade petrol station is to be built next to the business center.



Parking Building P1



Building project: Parking Building P1
Building site: Business Park Sofia
Investor: Business Park Sofia
Architect: Architectural bureau ‘Dimitrov’ architect Dimitar Dimitrov, architect Asen Milev, architect Angel Zahariev
General Contractor: Lindner Bulgaria Ltd., engineer Tzocho Tzankov
Location: in the central area of the complex
TBA: 33 800 sq. m


Building P1 is the first open multi-storey car park in Bulgaria. It is one of the 12 buildings which are to be built during the second stage of the project Business Park Sofia. The building work began in August 2003 and is expected to finish by the end of September 2004. The building's parking places are to be leased out to the people working in the office buildings of Business Park Sofia. The multi-storey building will have 2 underground and 8 above ground levels including roofing. The rooftop will be also used as a parking lot. There is also a possibility for the building of a helicopter pad. The car park provides 1066 parking places for cars. There will be two entrances and exits for the cars on the ground floor, one entrance/exit on the first underground floor and one entrance/exit on the second underground floor. Pedestrian access and the vertical communications will be provided by two stairways and two lifts. The lifts have a capacity of 13 people and are fully equipped for providing good access for disabled people. P1 is the first parking building which lifts can read Braille and thus facilitate the visually impaired people. A characteristic feature of the building is that it is open - the floors have open facades aiming at better ventilation. (Parapets, railings will be raised on the edges of the building). An important role in the creation of the architectural silhouette of the building will play the planting of the facade. Climbing plants are expected to cover most of the building in a few years. The vegetation will contribute to the better incorporation of the building in the surrounding park area. The security measures of the building include 40 video surveillance cameras.



Arena II cinema Multiplex





Building project: Arena II cinema Multiplex
Building site: Mladost 4 Al. Malinov Blvd., Sofia
Architect: Architectural studio 'Artech' - architect Konstantin Antonov
Investor: Arena Cinema 2000
Building contractor: Balkanstroi AD
Area: 23 948 sq.m
Built-up area: 4440 sq.m
Total Built-up area: 15 167 sq.m
Density: 18,54%
Built-up volume: 104 900 cubic metres
3 floors
15 theaters - 4 000 seats
4 cafes and restaurants
500 parking lots for visitors
Location:
Arena II Cinema Multiplex is to be situated in the newly built multifunctional and high-tech area of Business Park Sofia in Mladost 4 neighbourhood.
Business Park Sofia is located at the foot of Vitosha Mountain, on the Ring Road surrounding Sofia, and is easily accessible trough all main boulevards of the city. It is situated at a 12-minute drive to the City Center and a 7-minute drive to Sofia Airport.
The parcel where the building is located has an irregular shape. Its southern side borders the Ring Road surrounding Sofia, from where the greatest number of visitors is expected. The orientation of the building conforms to the main traffic flows. Service entrances are on the back and side facades.
The main volumes in the complex are the theatre halls, which shape the silhouette of the building and its spatial specificity. The prevailing forms in the structure are prisms with metal structure, holding the theatre halls.
Above ground car parks with capacity for about 530 cars will be built in the northern and western part of the parcel. In front of the main entrance there is a small square, which organizes and directs the stream of visitors towards the building. This square provides the opportunity for awaiting and gathering of bigger groups without disrupting the pedestrian traffic along the boulevard.
Functional structure:
The complex consists of the following functional groups:
-a entrance foyer and an atrium
-a zone for theatre halls
-a zone for fast food restaurants
- a zone for entertainment
-an administrative zone
-service premises
Construction:
Combined reinforced concrete and steel structure
Completion date: at the end of 2004



NIKMI Business Hotel




Building site: Business Hotel
Location: on the corner of Vitosha Blvd and Buzludja St.
Investor: NIKMI AD
Architect: architect Vanya Stoyanova, architect Alexander Bahchevanski
Building Contactor: NIKMI AD
Location: The new business hotel will be located on the corner of Vitosha Blvd and Buzludja St in close proximity to the National Palace of Culture (NDK). It will stretch on 336 sq.m. The total built-up area is 4 509 sq.m.
The key location of the building in the downtown of Sofia and its purpose determine its architectural silhouette.The project emphasizes the entrance space and the entrance hall. The building will have 10 floors.
Basement: machinery premises, kitchen, sanitary and service premises.
Ground floor: comprise a hotel lobby, reception desk, lobby bar and a premise for luggage
Second level: designed for business centre with a conference hall
Hotel section:7 hotel room and a suite. The vertical solution consists of 2 lifts and two staircases.
Construction: Monolithic reinforced concrete structure. The external walls are to be built with cellular concrete blocks. The partition wall will be build without mortar.
Facade: suspended glass facade with solid section, which will be made of polished stone in light pastel colours.
Kommandant Mark no está en línea  
Old August 23rd, 2004, 03:46 PM   #2
SinCity
Streetwalker
 
SinCity's Avatar
 
Join Date: Sep 2002
Location: Emerald City
Posts: 6,475
Nice projects for BG!
SinCity no está en línea  
Old August 23rd, 2004, 03:48 PM   #3
Kommandant Mark
BANNED
 
Kommandant Mark's Avatar
 
Join Date: Oct 2003
Location: Zemun, Land of Tesla & Pupin
Posts: 1,762
There's a lot more here - very nice idea to make such a website. Its a government site, I believe.

http://www.bulgariaconstruction.com/
Kommandant Mark no está en línea  
Old August 23rd, 2004, 03:50 PM   #4
PyRoMaNiAc
Registered User
 
PyRoMaNiAc's Avatar
 
Join Date: Aug 2004
Location: Toronto/Belgrade
Posts: 1,779
Yeah, it is good to have a website like that because I find it quite hard to find the websites for some of the construction I saw happening in Serbia.
PyRoMaNiAc no está en línea  
Old August 23rd, 2004, 03:59 PM   #5
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
I never knew there was such a site!
There appears to be some good projects, but of course none of them high.
some day will come when we'll finally have a tallest building in Bulgaria that won't be a hotel built by commies.
I really like the Bellissimo, it looks great.
__________________
3tmk no está en línea  
Old August 23rd, 2004, 04:11 PM   #6
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
4 August 2004
Big European construction companies candidate for the construction of Danube Bridge – 2

The transport ministry announced the participants in the tender for the construction of “Danube Bridge – 2” Vidin-Kalafat. Offers for full engineering have submitted the French companies Buoigues and Vainci, the German ones Zublin, Bilfinger, the Austrian Alpine and Strabag, the Spanish FCC and OHL, the Italian Pantechini and Ira Costruzione, the Dutch Floor Infrasctructure, the Hungarian Vedepser, and the Turkish Kishka and Sengis Ins Santic.
The Bulgarian counterparts and subcontractors are famous construction companies: Glavbolgarstroy, Moststroy, Ingstroy, Transstroy, and others.
The terms and conditions of the tender require millions of euro realized in construction and at least 3 similar works in the last 5 years. The consultant of the project is a consortium of Scott Wilson and Iberinsa, which submitted 3 different offers ranging between 143 mil euro and 200 mil euro.
__________________
3tmk no está en línea  
Old October 3rd, 2004, 05:12 AM   #7
Kommandant Mark
BANNED
 
Kommandant Mark's Avatar
 
Join Date: Oct 2003
Location: Zemun, Land of Tesla & Pupin
Posts: 1,762
Two new metro stations for Sofia!

28 September 2004
Sofia Mayor signed a contract with Japanese Taisei for the construction of Sofia subway

Yesterday Mayor Sofianski signed a contract with Mr. Joshio Uno, manager of the Japanese corporation Taisei for the construction of two subway stations in the center of Sofia. The new stations will connect St. Nedelya square with Sofia University 'St. Kliment Ohridski' and stadium Yunak. The project should provide 2,5 km subway section in downtown Sofia till October 2007.Taisei corporation will use an underground building method without digging downtown Sofia. The construction will start in January 2005. A construction plot will be prepared in the next three months and the contracts with the subcontractors will be signed. The funding is provided by the Japan Bank for International Development. The total sum is about US$ 83 million. The money for the project will have to be refunded within 30 years with a 10-year grace period and 2,2 % interest rate. The new subway stations are planned to be built by 2007. Mayor Sofianski promised that the project for the total length of the subway (up to Mladost neighbourhood and Business Park Sofia) will be prepared till the end of 2005.
Kommandant Mark no está en línea  
Old October 3rd, 2004, 05:15 AM   #8
salvius
Registered User
 
Join Date: Aug 2004
Posts: 3,294
Looks like Bulgaria is kicking butt. Personally, I think the reason for this is their global domination of feta cheese markets
salvius no está en línea  
Old October 5th, 2004, 04:35 AM   #9
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
^Don't forget about yoghurts!
We'll build a 400m tower in the shape of a yoghurt cup!
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-
well here's the link to the other thread:
http://www.skyscrapercity.com/showthread.php?t=137323
---------------------------------------------------------
http://www.businesspark-sofia.com/index.php?pnm=1&ln=0
A City Within the City
Business Park Sofia is a genuine multifunctional high-tech business park, which combines the essentials components of business and the related sectors into one tight package of opportunities. Spread on 220 000 m² of land, with 35 buildings, 300 000 m² total built-up area, 3 000 parking lots for employees, 1 000 parking lots for visitors and over EUR 150 million investment, the complex is designed to be the ultimate business address in Bulgaria.

BPS Today
* 220 000 sq.m. plot area
* 10 Buildings
* 70 000 sq.m. total built-up area
Some Buildings:
Office building No 4

Multifunctional building No 11

Arena Cinema

Office building No 2A

Business Hotel Holiday Inn

http://www.businesspark-sofia.com/index.php?pnm=6&ln=0#
as you can see from the map on the link above, there's a building 7 that appears to be the tallest of them all, but it's a 'future building', so there's no info on it
----------------------------------------------------
http://cityguide.dir.bg/

Sofia south, Motopista district, new building under construction(ready 2006), 4th floor with a lift

ofia south, Motopista district, new building under construction(ready 2005), 3rd floor with a lift

Center area, “Evlogi Gueorguiev” Blvd., brand new office building called “Bulgaria 2000”.
Modern office building 11 floors total

Hipodruma area, “Tsar Boris III” Blvd., new office building
---------------------------------------------------
----------------------------------------------------
http://www.bates.eu.com/
Office Building Project on Bulgaria/Nestorov Blvd

This future site of an office development borders both the Bulgarian Medical Academy as well as holds the corner of the entrance to a well-developed living community of houses and small apartment buildings in the residential south of Sofia. The 10 floor (plus basement) building is scheduled to be located on the corner of two highly traveled roads.
Evrotur Sat office building in Sofia

Bulgarian telecommunications company - Evrotur Sat engaged Bates for design and project management of its new office building. Total area of the 12 – storey building is 9000 sq.m. The construction should be completed by the end of 2005.
Soravia office building, Sofia

This beautiful contemporary building was designed by Bates for an architectural competition for the third Soravia site in Sofia
-----------------------------------------------
Interpred Development, Central Sofia


^
Completion date: November 2005
-------------------------------------------------
http://www.peri.de/
Raiffeisenbank Office Building, Sofia, Bulgaria
The new headquarters of the Raiffeisenbank in Sofia is comprised of two building elements joined together resembling a V-shape. Each section contains a basement and four upper storeys.



__________________
3tmk no está en línea  
Old October 5th, 2004, 04:56 AM   #10
Sergei
iMod
 
Sergei's Avatar
 
Join Date: May 2004
Location: Toronto | Lviv
Posts: 4,497
Thanks alot. There hasn't been much on these forums about Bulgaria. I hope there will be more about Bulgaria.

I LOVE the Black Sea.
Sergei no está en línea  
Old October 11th, 2004, 12:40 AM   #11
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
Here's a pretty original project, not a highrise, not at all, but it has a nice design IMO.
Sofia Central Park:
http://www.sofiacp.com/
The complex
The complex consists of two buildings /business and residential/ and underground parking.
The office building has 9 floors /8 above ground/ with build-in area of 5 311 m². It consists of administrative part - basement, ground floor and 2 above ground floors with offices to rent and 4 residential floors with 6 spacious apartments.

The residential building has 7 floors with 9 apartments for rent.

The underground three-level parking is beneath the residential building and has the potential to meet the parking needs of both buildings - 3 110 m² with 72 parking cells.



Check this for info on real estate status in Bulgaria:
http://www.colliers.com/Markets/Bulgaria/
__________________
3tmk no está en línea  
Old October 22nd, 2004, 05:13 AM   #12
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
alright, here's a photogallery from SSP:
http://skyscraperpage.com/gallery/sh...t=2&perpage=32
there are some projects like this one, that seems to be a highrise:
http://skyscraperpage.com/gallery/sh...papass=&sort=2
and an interesting one like this:
http://skyscraperpage.com/gallery/sh...papass=&sort=2
and much more
__________________
3tmk no está en línea  
Old November 18th, 2004, 02:46 AM   #13
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
Check this out:
http://www.valkanov-milanov.com/
on future projects in bulgarian, you can see an office planned in Mladost:
Бизнес сграда на бул. “Цариградско шосе” в, кв. “Младост”1, кв. 9, УПИ III-2704, – РЗП около 15329 м2
Начало 09.2004 г. – край 09.2006г. – предстоящо строителство.

there are more there, but look at the commie behind!
__________________
3tmk no está en línea  
Old November 18th, 2004, 07:03 PM   #14
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
I'm going to get this and post it in the Eurosection, until then, here are more:
http://www.olvi-bg.com/projects_en.htm#

Project: Residential building with offices – entrance A and B
Location: 2-4 "Strandza" Street, "Zona B-5", Sofia
Commissioned by: Geotechmin-consult and engineering
Built by: Geotechmin-consult and engineering
Phase of realization: in construction
General features: unfolded built-up area – 3500 square meters

Project: Residential building with garages
Location: "Bulgaria" Blvd, area "Triaditsa" , Sofia
Commissioned by: "Kapriz 2" OOD
Built by: "Kapriz 2" OOD
Phase of realization: in construction
General features: unfolded built-up area – 2440 square meters, built-up area – 280 square meters

Project: Residential building with garages
Location: "Manastirski livadi- west", Sofia
Commissioned by: EOOD "Metalurg – engineering"
Built by: EOOD "Metalurg – engineering"
Phase of realization: in construction
General features: unfolded built-up area – 1590 square meters, built-up area – 323 square meters

Project: Residential building with offices and basement parking
Location: 192-198 "Vitosha" Blvd, Sofia
Commissioned by: "Vechna R- Liubomir Ranchev"
Built by: "Vechna R- Liubomir Ranchev"
Phase of realization: in construction
http://www.gaudi-bg.com/residental.htm


Project residental building, Sofia

Residental building: 10 floors + 2 underground floors
Total built-up area: 28000 м2




Town Center Sofia

- residental area level: 21 610 м2
- comercial area level: 21 654 м2
- office area level: 9 244 м2
- total built-up area level: 75 000 м2


Office building - 1 'Cherni Vruh' Str. , Sofia

Investor: KONTIKI Ltd.
- 10 floors
- built-up area level: 320 м2
- total built-up area level: 3 200 м2
and check Emporis, it's actualized almost every week!
__________________
3tmk no está en línea  
Old November 18th, 2004, 07:43 PM   #15
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
while I'm at it, check this:
http://www.stroitelstvo.info/index.p...scat=&offset=0
21 page of almost all buildings UC or proposed in BG!!!!
Expect big changes at emporis soon, I'm trying to get Bulgaria into the Top20 in the list of Europe, we need to pass some Baltic state with 83 buildings, we're at over 50, and without any commies!
__________________
3tmk no está en línea  
Old November 19th, 2004, 10:00 PM   #16
braykov1988
Kameniza
 
braykov1988's Avatar
 
Join Date: Oct 2004
Location: Sofia
Posts: 102
good job!
and that hotel in Mladost - it would be plain ludicrous to build that thing so close to the 25storey commies behind it, there's almost no space, I know the place cause I live very close in a commie block just like those. There's so much empty land in sofia, why don't they use it...
braykov1988 no está en línea  
Old November 20th, 2004, 07:20 AM   #17
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
that's a problem, but it comes from having so much high rise residential buildings, it leaves too much space. On the other hand, all that land could be transformed into parks.
anyway, I think that Hotel is just proposed, not in construction yet, so we never know whether it gets done or not. In any case, it will probably mess up the view of a good half of the building behind, I'm pretty sure they don't want that hotel over there
__________________
3tmk no está en línea  
Old November 20th, 2004, 07:45 AM   #18
Sergei
iMod
 
Sergei's Avatar
 
Join Date: May 2004
Location: Toronto | Lviv
Posts: 4,497
mmmmmmmmmmm .......... Black Sea ...
__________________
serhio.com
Sergei no está en línea  
Old November 20th, 2004, 03:35 PM   #19
braykov1988
Kameniza
 
braykov1988's Avatar
 
Join Date: Oct 2004
Location: Sofia
Posts: 102
besides, I wouldn't wanna stay in a hotel in an ugly commie suburb on an extremely busy highway crossing...
anyway, I like the projects though little can be seen on 3D images. some freaky residential buildings
braykov1988 no está en línea  
Old November 22nd, 2004, 06:52 PM   #20
3tmk
MMX
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Gotham
Posts: 9,312
well here's the info for the Soravia Center:
http://www.plus-architecture.net/pro...-center_en.htm
< office building s - center sofia / bulgaria | 2003

investor: soravia bulgaria
site area: 3.000m2
gross building area: 12.000m2
office rentable area: 8.000m2
storage facilities: 270m2
garage: 2 underground levels with 80 parking units
Urban development

The building stands as a solitary structure next to one of Sofia’s most important traffic routes, the connection between Sofia’s city centre and the international airport. The project is situated within a rough unstructured urban district, on the border of the Mladost housing estate and next to the city motorway; the building wishes to loosen up the severity and unpleasantness of the surrounding environment.

Structural shell

The building complex consists of a main body upon which two towers lean, these are connected by only one vertical core. This allows the developers to rent or sell the main body with the towers as one unit or alternatively as separate individual units. The structural shell of the building allows optimal utilisation and lighting of the office spaces. The stark drop of the buildings external landscape will be utilised to allow the design and building of further office units in the first basement level. In the further two basement levels parking places for 100 cars is planned. The entrance of the office complex offers itself up in the form of a double-height glazed foyer with a reception situated on the ground floor and a small café on the floating gallery above.

Vertical core

An optimisation of the users usable office space is achieved by means of combining the lifts and stairwells into one zone placed at the interior of the building mass; this will also allow the possibility of efficient and adaptable office layouts for any future users; In this way the sustainability of the building and investment is also taken into account.

Construction

The main body of the building will consist of a reinforced concrete skeleton where the floors and ceilings will be constructed without the need of exposed beams. The external skin will be hung from a curtain-wall system. The longer sides of the building mass have the appearance of a “hole-punched” façade with massive, non-structural walls carrying the skin consisting of large ceramic tiles. Both office towers differentiate themselves with the use of colour; enabled by a pigmentation process of the ceramic tiles. The heavier appearance of the “hole-punched” façade of the external shell creates an engrossing counterpart to the light, glazed covering of the “forehead” of both towers. The distance between window axis is 250 cm with a window size of 125 cm. Protection from the intense summer sun in the glazed sections is achieved with the use of externally fixed louvres.

Energy concept

The core of the air conditioning and heating system is situated below in the first basement level. The air supply of the office spaces is carried-out by a fancoil unit system invisibly integrated into the raised floor construction. The waste air is dealt with by a system integrated into the suspended ceiling of the office corridors. Heating and temperature requirements and climatic fluctuations will be balanced out at the external skin by using the storage abilities of floors and wall masses. A comfortable room climate will also be supported through the intensive planting and landscaping of the external environment and by the “greening” of the terrace above the fourth floor level.



Client: S-Center Sofia / Soravia Bulgaria
Architecture: Torniov, Petkov, Vucinic ARGE (Co-op) / Wien - Sofia
Execution: +architecture ltd. / Sofia, Bulgaria
Project leader: Angel Savlakov
Co-work: Elitsa Dimitrova, Ivan Arnaudov



__________________
3tmk no está en línea  


Closed Thread

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:47 PM.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
BBS server management by DaiTengu
Forums Directory