Quote:
Originally Posted by Svartmetall View Post
Another 12 units were ordered in 2009 to be delivered in 2012. I'm not sure if there is more up-to-date information than this, but this is what I know about for the moment.
Nice to know that, even though it would be better, if the new trains were similar to the ones used in Malmö, i.e. pågatågen.
dj4life está en línea ahora   Reply With Quote

Sponsored Links
 
Old April 21st, 2011, 03:08 AM   #62
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Quote:
Originally Posted by dj4life View Post
Nice to know that, even though it would be better, if the new trains were similar to the ones used in Malmö, i.e. pågatågen.
The X60 are very, very similar to those used on the Pågatågen in Malmö (X61). They are the same basic train but the Pågatågen trains are actually smaller. There have been a LOT of orders for the X61 though, they'll soon be running in Västerås, Jonköping, Gothenburg and on the Bothniabanan which is great news. It's really good to see such wide scale modernisation of the rolling stock across Sweden.
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote
Old April 21st, 2011, 03:08 PM   #63
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Transport Improvements

New Bus and Tram Depot on Lidingö

As part of the modernisation of the Lidingöbanan, a new bus depot and tram hall will be constructed in the Stockby industriområde. This is in preparation for the expansion of Spårväg City towards Ropsten.

The upgrade also consists of new vehicles and improved bus stops.


New Digital Signage at 1400 Bus Stops

To compliment the digital displays at all rail-based transport stations, new digital displays will be rolled out to 1400 bus stops across Stockholm County. All bus stops with more than 150 boardings per day will be equipped with the new system to ensure accurate and precise information for commuters and leisure travellers.


Improvement in service on the Roslagsbanan

Double tracking and extensive modernisation of the Roslagsbanan is ongoing with a new section of track under construction between Rydbo and Akers Ruhnu (a length of 5km).
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541

Last edited by Svartmetall; April 21st, 2011 at 03:20 PM.
Svartmetall está en línea ahora   Reply With Quote
Old April 21st, 2011, 03:16 PM   #64
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Art in the Metro

Odenplan Metro Station



A new addition to Odenplan station is a black octopus made from silicone rubber. The work was made by Thale Vangen from the Malmö Art Academy.


Citybanan Station Art Commission

With the two new underground stations for the Citybanan which will form the central part of the pendeltåg system comes new artwork.

SL is now accepting submissions on artwork to fill the two new stations from across Sweden and Europe.
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541

Last edited by Svartmetall; April 21st, 2011 at 03:23 PM.
Svartmetall está en línea ahora   Reply With Quote
Old April 21st, 2011, 09:10 PM   #65
Tin_Can
Moderator
 
Tin_Can's Avatar
 
Join Date: Jun 2009
Location: Tallinn
Posts: 4,564


That octopus is creepy. Looks like smth worthy of 'XXX' rating


I hope it's okay if I post few pics of various public transport used in Stockholm.

First,various buses used in Stockholm (both LNG,biofuel & ethanol powered) Most are various models of Scania,the one on third photo is gas-powered MAN Lion's City.








Few ferries which operate between Stockholm city and islands on Stockholm archipelago.


And bonus - tram running on Djurgarden-Sergels Torg line.


I'll see if I can dig out smth more...
__________________
MY PHOTOS OF ESTONIA: HAAPSALU | TALLINN (1400+ PHOTOS! NEW PHOTOS!)
MY TRAVEL PHOTOS: STOCKHOLM
VISIT NORDIC & BALTIC FORUM
Tin_Can no está en línea   Reply With Quote
Old April 21st, 2011, 09:29 PM   #66
dj4life
Registered User
 
dj4life's Avatar
 
Join Date: Oct 2009
Location: Stockholm (SE)
Posts: 6,293
Likes (Received): 1170

Great pictures, Tin! Thank you.
dj4life está en línea ahora   Reply With Quote
Old April 22nd, 2011, 12:59 PM   #67
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Excellent pictures, Tin! I love the buses there given that they are CNG or bioethanol/biofuel powered too.

As for the octopus - it's only XXX if you're into certain Japanese stuff.
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote
Old April 24th, 2011, 07:21 PM   #68
dj4life
Registered User
 
dj4life's Avatar
 
Join Date: Oct 2009
Location: Stockholm (SE)
Posts: 6,293
Likes (Received): 1170

Quote:
Originally Posted by Tin_Can View Post
And bonus - tram running on Djurgarden-Sergels Torg line.
Today i went to Djurgården with one of these trams and now i can say that they are pure class. The trams complement the comfortable metro and pendeltåg systems well.
P.S.

Happy Easter to everyone!

Last edited by dj4life; April 24th, 2011 at 07:30 PM.
dj4life está en línea ahora   Reply With Quote
Old April 24th, 2011, 08:00 PM   #69
Tooga
Registered User
 
Join Date: Nov 2009
Posts: 83
Likes (Received): 0

Quote:
Originally Posted by Svartmetall View Post
Yeah, the X1/X10 trains are used, but not the former Deutschebahn X420 stock. The X420 stock were either scrapped or put in storage.
As of 1 April 2011, the X1 is no longer used by SL. The remaining trains will be scrapped, although Bombadier have bought two X1 trains for ERTMS testing.
Tooga no está en línea   Reply With Quote
Old April 25th, 2011, 11:49 AM   #70
Dan
Registered User
 
Dan's Avatar
 
Join Date: Jun 2007
Location: Scotland / Ireland
Posts: 1,244
Likes (Received): 0

Niceeee...the X10 isn't so bad, but the X1 is crap!
Dan no está en línea   Reply With Quote
Old April 25th, 2011, 05:21 PM   #71
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Quote:
Originally Posted by Tooga View Post
As of 1 April 2011, the X1 is no longer used by SL. The remaining trains will be scrapped, although Bombadier have bought two X1 trains for ERTMS testing.
Excellent, thank you for the information! Unfortunately not being in Stockholm sometimes makes my information a little out of date so it's great to see others contributing to the thread.
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote
Old April 26th, 2011, 12:31 PM   #72
xtcgr
Registered User
 
Join Date: Apr 2011
Posts: 1
Likes (Received): 0

does anyone know which company will take over the construction of stockholm's metro expansion ?
xtcgr no está en línea   Reply With Quote
Old April 26th, 2011, 01:33 PM   #73
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Quote:
Originally Posted by xtcgr View Post
does anyone know which company will take over the construction of stockholm's metro expansion ?
Huh? Firstly, what expansion? Secondly, MTR are the current franchise holders for the Stockholm Tunnelbana. They took over from Veolia Transport who still run certain operations in Stockholm.

All public transport is overseen by SL in Stockholm.
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote
Old April 27th, 2011, 02:38 AM   #74
dj4life
Registered User
 
dj4life's Avatar
 
Join Date: Oct 2009
Location: Stockholm (SE)
Posts: 6,293
Likes (Received): 1170

If talking about the advantages of 'SL' and other public transportation companies, operating in Sweden, i have remembered that the ones who travel with children go-carts or disabled persons, can get in and out of a bus through other doors (not first ones) and travel for free. This system doesn't in several places, though.
dj4life está en línea ahora   Reply With Quote
Old April 27th, 2011, 04:22 AM   #75
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Quote:
Originally Posted by dj4life View Post
If talking about the advantages of 'SL' and other public transportation companies, operating in Sweden, i have remembered that the ones who travel with children go-carts or disabled persons, can get in and out of a bus through other doors (not first ones) and travel for free. This system doesn't in several places, though.
So are you saying that SL (and other operators in Sweden) are generally very disabled-friendly on their networks?
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote
Old April 29th, 2011, 10:52 PM   #76
dj4life
Registered User
 
dj4life's Avatar
 
Join Date: Oct 2009
Location: Stockholm (SE)
Posts: 6,293
Likes (Received): 1170

Quote:
Originally Posted by Svartmetall View Post
So are you saying that SL (and other operators in Sweden) are generally very disabled-friendly on their networks?
It is very hard to value this, since i haven't studied all the possible situations, yet, judging from what i have seen while using the public transport in Stockholm and Gothenburg, people bringing children wagons or disabled persons didn't have many problems to get into buses. I would say that the public transport system is 'friendly' to everyone and easy to use, but, of course, there is always some space for improvement.
dj4life está en línea ahora   Reply With Quote
Old May 4th, 2011, 02:35 PM   #77
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Slussen Rebuild News

Slussen is one of the biggest transportation hubs in Stockholm with a bus station, the end station of the Saltsjöbanan, the red and green lines of the tunnelbana, a bus station and major highways underneath södermalm as well as being a traffic solution to vessels traversing the Stockholm archipelago. The pendeltåg also passes underground to Stockholm south station even though it doesn't stop at Slussen.

In its current condition, Slussen is rather a blight on Stockholm and there has been talk of improving it for a long period of time. Costs and the inevitable disruption of public transport traffic and road traffic have made proposals problematic at best. However, due to public pressure and political will, change is now starting.

Here are the latest proposals for the new hub.









Thanks to Bosco and other Swedish forumers for this information.
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote
Old May 8th, 2011, 03:57 PM   #78
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

Citybanan Construction Update

The Citybanan project to build a new underground link for the Stockholm Commuter rail is currently under construction and due to be operational by 2017. Here are some new updates:

Construction videos:





New station render:

__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote
Old May 8th, 2011, 09:27 PM   #79
dj4life
Registered User
 
dj4life's Avatar
 
Join Date: Oct 2009
Location: Stockholm (SE)
Posts: 6,293
Likes (Received): 1170

Your thread is great, Svartmetall, and it is very nice to see the up to date material!
dj4life está en línea ahora   Reply With Quote
Old May 9th, 2011, 05:18 AM   #80
Svartmetall
Ordo Ab Chao
 
Svartmetall's Avatar
 
Join Date: Aug 2007
Location: Past: Northampton, UK (19 years), Auckland NZ (7 years), Now: Stockholm, Sweden
Posts: 9,175
Likes (Received): 215

I have all of you Swedish forumers to thank for your hard work collecting information from Swedish language websites so that I can put together this thread. It is you guys who do most of the work, I simply put it in one place!
__________________
"Alle Ding sind Gift, und nichts ohn Gift; allein die Dosis macht, daß ein Ding kein Gift ist."
Paracelsus 1493-1541
Svartmetall está en línea ahora   Reply With Quote


Reply

Tags
metro, scandinavia, stockholm, sweden, tunnelbana

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:13 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 25.00%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu